OVERVIEW OF LOCAL ROAD

MANAGEMENT PERFORMANCE
ASSESSMENT
Outline
• Historical Development of the tool
•Definition of LRM
• Definition of LRMPA
• The LRMPA Framework
• LRMPAT Framework
• The LRMPA Indicators
• The Assessment Process
• Why do we need to conduct LRMPA
Historical Development of the Tool

2015
2013

2014

Revision Process
2011
What is LRM?

Sustainable
Planning
management

Prioritizing
What is Local Road Management
Performance Assessment?

It is a mechanism to be used to
assess Local Government Unit’s
performance in local road
management.
The LRMPA Framework
The framework underpinning the development of the LRMPA consists of
three elements – capacity, performance and impact.
LRMPAT Framework
The LRMPA Indicators
There are 16 indicators that will be assessed. The table below
summarizes these indicators.
Indicators Weight
Capacity Element 1: Organizational Structure, Roles and Responsibilities
Indicator 1: Functionality of an inter – office road management 1
structure for roads management.

Capacity Element 2: Knowledge and Skills for Local Road Management

Indicator 2: Complement of LGU staff with knowledge and skills 1


in road management
Capacity Element 3: Information and Resources for Road Local
Management
Indicator 3: Availability of road management – related information 2

Indicator 4: Annual budget for road maintenance 3

Indicator 5: Annual budget for road rehabilitation 3


Indicators Weight
Capacity Element 4: Policies and Plans

Indicator 6: Level of correspondence between local road management plan and Annual 1
Road Works

Indicator 7: Presence of safety, asset care, climate resilience, and SDG provisions in the 1
road management plan
Capacity Element 5: Local Road Management Processes

Indicator 8: Level of participation in local road processes 1

Indicator 9: Availability of detailed engineering designs for road rehabilitation projects. 1

Indicator 10: Level of compliance with procurement laws 1

Indicator 11: Functionality of internal audit on local roads 1

Indicator 12: Presence of a constructor performance evaluation system 1

Indicator 13: Regularity of the conduct of monitoring activities on local road projects 1

Subtotal for Capacity Elements 18


(45%)
Indicators Weight
Performance Element 1: Effectiveness of Local Road Management

Indicator 14: Percentage of total length of local roads maintained and in fair 8
to good condition
Indicator 15: Change in the total length of local roads in fair to good 8
condition compared to previous year
Performance Element: 2: Efficiency of Local Road Management

Indicator 16: Completion rates of local road projects scheduled for the year 6

Sub – total for Performance Elements 22


(55%)
TOTAL 40
(100%)
The Assessment Process
Assessment Call
The specific date of the conduct of the assessment depends on the assessment cycle
specified by DILG, but not later than the 3rd Quarter of the calendar year.
The period covered in the assessment is the preceding fiscal year during
the actual conduct of the LRMPAT assessment.

Data Gathering and Initial Scoring


As the LRMPA will be a self – assessment process, the LGU will convene its Self –
Assessment Team (SAT) to conduct the assessment. The assessment team will have
the following responsibilities:
a.Assemble the Means of Verification
b.Compute for the necessary requirements based on the scoring descriptions
c.Answer the Excel – based score sheet
d.Prepare an LRMPA Report that contains the following:
a. Scores for each indicator
b. Explanations for each of the scores generated
e. Discuss the scores with the members of the local road management committee
Data Validation
The DILG Regional Office will convene a data validation team (DAT). The DAT will visit the LGU for the
conduct of the data validation. The data validation will take place where the DAT validate submitted
documents that includes the LRMPA report, the Excel – based LRMPA score sheet, and the MOVs
provided.

Ratings Discussion
The DAT will undertake a focus group discussion with the LGU’s SAT and the local road management
committee to discuss the following:
a. discussion of the objectives of data validation
b. discussion of the results of the validation by the DAT
The baseline LRMPAT percentage scores of the LGU can serve as the basis for formulating a capacity
development strategy to improve this LRM capacity and performance. The comparison with the end
line percentage scores can be used to analyze the implementation of the strategy and generate
lessons.
Report Preparation and Submission
After the finalization of the scores, the SAT of the LGU will
revise the LRAM report and the Excel template. The LGU and
the validation team will sign the revised report and submit
these to the DILG Regional Office.

The copies of the enhanced LRMPA Tools and LRMPA user’s


Guide are accessible through this link
http://bit.ly/LRMPA2021
Why do we need to conduct LRMPA?
To measure the capacity and performance of the
Provincial Local Government Units (PLGUs) in
terms of Local Road Management (LRM).
The assessment results will be used to determine
interventions to address capacity gaps, strengths
and weaknesses in LRM.