Earth Work Excavation
Earth Work Excavation
EXCAVATION
DRAWINGS
DRAWINGS
DRAWINGS
• FT1=2.50x1.50x0.45
• FT2= 1.80x1.60x0.38
• FT3 = 2.80x1.50x0.55
• FT4 = 1.50x1.60x0.30
• FT5 = 1.20x1.20x0.30
S. Description N Length Breadth Depth Qty Unit
N o
o s
1 Footing Earth Work 2 3.10 2.40 2.50 37.20 Cum
As per MKS
FT1 (2.20x1.50)
L=2.20+0.15+0.15+0.3+0.3=3.10m
B=1.5+0.15+0.15+0.3+0.3=2.40m
D= 2.50Mt