Earth Work Excavation

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 7

EARTH WORK

EXCAVATION
DRAWINGS
DRAWINGS
DRAWINGS
• FT1=2.50x1.50x0.45
• FT2= 1.80x1.60x0.38
• FT3 = 2.80x1.50x0.55
• FT4 = 1.50x1.60x0.30
• FT5 = 1.20x1.20x0.30
S. Description N Length Breadth Depth Qty Unit
N o
o s
1 Footing Earth Work 2 3.10 2.40 2.50 37.20 Cum
As per MKS
FT1 (2.20x1.50)
L=2.20+0.15+0.15+0.3+0.3=3.10m
B=1.5+0.15+0.15+0.3+0.3=2.40m
D= 2.50Mt

2 As per FPS 2 6.5’ 7.16’ 8.202’ 763.44 Cft


Ft1 (3’6” x 4’-2”)
L=
3+6/12+0.15x3.2808+0.15x3.2808+0.3
x3.2808+0.3x3.2808
=3.5’+0.50+0.50+1+1=6.5’
B=4+2/12+0.5+0.5+1+1=7.16’
D=2.50x3.2808=8.202’
S Description Nos Lengt Breadt Depth/Thick Qty Unit
. h h /Height
N
o
1 PCC 2 2.50 1.80 0.15 1.35 Cum
FT1=2.20 X 1.50MT
L=2.20+0.15+0.15=2.50
B= 1.50+0.15+0.15=1.80
D= 0.15

Vol of RCC (Concrete) 2 2.20 1.50 0.45 2.97 Cum


Ft1 = 2.20x1.50
L=2.20
B=1.50
D=0.45

You might also like