Professional Documents
Culture Documents
Amine Cold Box Core Making: - The Need of The Hour
Amine Cold Box Core Making: - The Need of The Hour
B. B. Lohiya
Director
Compax Industrial Systems Pvt. Ltd.
Pune, India.
IT WILL TAKE
CARE OF
YOUR
QUALITY
CASTINGS !
Compax - An ISO 9001 Company !!
PRODUCTIVITY FACTORS
RATE OF PRODUCTION
QUALITY ASSURANCE
COST ECONOMICS
ENERGY CONSERVATION
HUMAN SKILL AND FATIGUE
ENVIRONMENT
PHENOLIC + POLY AMINE POLY
Collapsibility Easy shakeout, good break down Knock out properties are
and knock out properties. Takes not as good as in the case
50% less time than shell. of Cold Box.
Tooling development Less cost of tooling by almost 30% as High cost of tooling since
compared to shell since resin, only metallic tooling has to
wooden or non-metallic tooling can be be necessarily used.
used.
Flexibility to use Variety of core production in a shift is Since tooling is hot operator
tooling possible since process is cold, core has to wait for 2 to 3 hours
box can be replaced within 10 to 15 to allow it to cool down
minutes. Thus cores can be produced before tooling change
as and when required.
Cost of core per kg of Rs. 3.60 to 4.00 per kg of Sand Rs. 6 to 8 per kg of Sand
Sand (Cost of sand
binders and energy)
1. No Smoking
2. Keep the premises completely dry. Moisture is dangerous to the strength of the
core Dirt, Clay Oil droplets & moisture are enemies of cold box.
3. Take care of your cold box sand. Use the sand mix within 20 minutes of
preparation
4. Take care of the core box and it will take care of your care requirement. Clean
the core boxes frequently.
5. Operate equipment only if you are authorised to do so.Know it well before you
operate it.
6. Clean the Sand hopper, Sand cylinder. Sand magazine, the core boxes and
the machine at the beginning and end of each shift and also whenever you wish to
take a break for more than 20minutes.
7. Keep all doors of the machine closed and cover lids during operation of the
equipment.
8. Use hand gloves as required for handling of consumables.Store the cores in a
very dry atmosphere.
9. Keep your core making equipment always clean and tidy. It will give you
longer service.
Important :-
The consumption of raw material as well as the production
rate is dependant on type of Core configuration , quality of
sand , Type of tooling , Shooting and gassing Techniques
Sealing Of joints etc.
REDUCED FLOWABILITY
POOR CORE COMPACTION
& POOR STRENGTH
FAST
FLEXIBLE
PROGRAMMABLE
INCREASED LEVEL OF AUTOMATION,
INBUILT SAFETY
QUICK TOOLING CHANGE
COMPATIABLE HANDLING SYSTEMS