Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 17

Philippine National Police Training Institute

Preparation for PSBRC of


CY 2021 Recruits

May 20, 2021 (Thursday)


PNP Main Conference Room, Camp BGen Rafael T Crame,
Quezon City
Sequence of Presentation
 CY 2021 Attrition & Regular Recruitment Quota(from PRS)
 Proposed Distribution of Recruits to TC’s
 Absorptive Capacity of TC’s
 Supervising Assistant Instructors
 Issues and Concern
 Way Forward
CY 2021 Attrition & Regular Recruitment Quota(from PRS)
Attrition Recruitment Quota for PROs and NSUs (1st Cycle)

Unit Quota Unit Quota


NCRPO 1,000 PRO 7 200
PROCOR 0 PRO 8 500
PRO 1 100 PRO 9 0
PRO 2 200 PRO 10 50
PRO 3 250 PRO11 0
PRO 4A 250 PRO 12 0
PRO 4B 200 PRO 13 0
PRO 5 400 PRO BAR 200
PRO 6 0 NSUs 1,800
TOTAL 5,150

Note: Tentatively scheduled to Take Oath on July 1, 2021


Attrition Recruitment Quota for PROs and NSUs (2nd Cycle)

Unit Quota Unit Quota


NCRPO 3,000 PRO 7 450
PROCOR 100 PRO 8 700
PRO 1 250 PRO 9 100
PRO 2 200 PRO 10 100
PRO 3 500 PRO11 100
PRO 4A 500 PRO 12 100
PRO 4B 250 PRO 13 100
PRO 5 450 PRO BAR 1,500 (MILF/MNLF)
PRO 6 100 NSUs 2, 664
Total 11,164

Note: Tentatively scheduled to Take Oath on September 1, 2021


Regular Recruitment Quota for NCRPO

Unit Quota
NCRPO 1,000

Note: Tentatively scheduled to Take Oath on October 31, 2021


Proposed Distribution of
Recruits to Training Centers
Proposed Distribution of Attrition Recruits 1st Cycle

Training Center 1st Cycle Sub-Total Training Center 1st Cycle Sub-Total
PNPTI 100 RTC 4A PRO 4A 250 250
CL 200 RTC 4B PRO 4B 200 200
NHQ-NSUTC HS 250 RTC 5 PRO 5 400 400
800
  HSS 50 RTC 6 PRO 6 0 0
PDEG 150 RTC 7 PRO 7 200 200
TS 50 RTC 8 PRO 8 500 500
NCRTC NCRPO 500 500 RTC 9 PRO 9 0 0
NCRPO 500 RTC 10 PRO 10 50 50
CARTC 500
PRO COR 0 RTC 11 PRO 11 0 0
PRO 1 100 RTC 12 PRO 12 0 0
RTC 1 600 CARAGATC PRO 13 0 0
MG 500
RTC 2 PRO 2 200 200 BARTC PRO BAR 200 200
PRO 3 250 Total 5,150 5,150
CES 100
CIDG 100
IG 50
RTC 3 LS 50 750
EOD/K9 50
PRBS 50
PSPG 50
ACG 50
Proposed Distribution of Attrition Recruits 2nd Cycle
Training Training
2nd Cycle Sub-total 2nd Cycle Sub-total
Center Center
NCRTC NCRPO 1,000 1,000 PRO 4B 250
RTC 4B 350
PRO COR 100 NCRPO 100
CARTC MG 500 700 RTC 5 PRO 5 450 450
CIDG 100 PRO 6 100
PRO 1 250 RTC 6 PRBS 50 200
RTC 1 614 NCRPO 50
PDEG 364
PRO 2 200 RTC 7 PRO 7 450 450
NCRPO 150 RTC 8 PRO 8 500 500
RTC 2 CES 250 750 PRO 8 200
RTC 9 300
EOD 50 PRO 9 100
HSS 100 PRO 10 100
RTC 10 300
PRO 3 500 NCRPO 200
SAF 100 PRO 11 100
RTC 3 750 RTC 11 500
PSPG 100 NCRPO 400
IG 50 PRO 12 100
RTC 12 600
PRO 4A 500 NCRPO 500
TS 100 PRO 13 100
CARAGATC 700
CL 300 NCRPO 600
RTC 4A NPTI 150 1,500 BARTC PRO BAR 1,500 1,500
HS 250 Total 11,164 11,164
ACG 150
LS 50
Recapitulation (Attrition Recruits)

Training Center Sub-total Training Center Sub-total


NTC 800 RTC 7 650
NCRTC 1,500 RTC 8 1,000
CARTC 1,200 RTC 9 300
RTC 1 1,214
RTC 10 350
RTC 2 950
RTC 11 500
RTC 3 1,500
RTC 4A 1,750 RTC 12 600
RTC 4B 550 CARAGATC 700
RTC 5 850 BARTC 1,700
RTC 6 200 Total 16,314

Note: By September 1, 2021 TCs will be handling a total number of Police Trainees as
indicated above.
Proposed Distribution of NCRPO Regular Recruits

Training Center Sub-total


NHQ-NSUTC 200
RTC 6 300
RTC 7 100
RTC 9 200
RTC 10 200
Total 1,000
Absorptive Capacity of Training Centers
Absorptive Capacity as of May 2021

Classroom Capacity
267 15,710

Dormitory Capacity

132 12,899
Tent
1,464 8,945

Note: Most of the tents require some repair.


Supervising Assistant Instructors

 17,314- Recruits
 347- Classes (50 Police Trainees per Class)
 5-supervising Assistant Instructor per class
 1,735- Ideal number of Supervising Assistant Instructors
 384- Actual Strength including DS (organic 292+DS 92)

1,351- Total Number of Personnel Augmentation to


be requested to NHQ
Issues and Concern
COVID-19 Minimum Standard Safety Protocols
 Coordinating with Regional Medical and Dental Units in the PROs for Medical Support.

Personnel
 Augmentation of 1,351 personnel (preferably exemplary role models)
 Instructors Duty Pay

Facilities
 Classroom
 Construction of makeshift classrooms
 Dormitory
 Construction of makeshift dormitory (Tent) to house 4,535 Trainees (approximately 90 Tents
measuring 12m x 21m with proper ventilation)
 Installation of additional toilet (361 units)
 Water Supply-Installation of 72 water pumps (4 units per Training Center)
 Power Supply- procurement of 20 power generators (preferably 10kva)
 Mess Hall
 Quarter Master Items
Way Forward

 Representation to National Headquarters to include the


PNPTI in the recruitment planning process;
 Establishment of Health Unit per Training Centers;
 Propose incentive package to entice exemplary role model
personnel to be assigned at PNPTI;
 Propose construction of permanent structures to improve
PNPTI facilities;
 Propose additional budget for periodic replenishment of
Quarter Master items; and
 Establishment of PNPTI Instructional Management System (
IMS)
End of Presentation

Thank You!

You might also like