Professional Documents
Culture Documents
QC слайды по качеству к индонезии вариант 20.07.2012 вечер - eng
QC слайды по качеству к индонезии вариант 20.07.2012 вечер - eng
Quality Management,
Certification and Standardization Engineering Inspection Department Incoming Inspection Department
Department
Engineering inspection of
A/C assembly assembly quality, airframe
operational attachment, installations.
Power-on system testing.
inspection
Results of
the check,
the incoming
Issue in Store Positive results
inspection
chart
production
lts
Не
esu
r
со не
ti ve
от т
ega
ве
N
тс
вит
Telecommunications Rejection
й
Non-conformity area
notification,
decision taking
Operational inspection
Execution of the operation according to
the process by the executor Check of execution by
the foreman (inspector)
Closing of
Submission of the operation
the operation for inspection No comments in the job card
Th
e n rev
on eal
-co ed
nfo
Execution of the retrofit as Taking the decision on
rm
ty i
per the waiver / concession retrofitting
Deviation of
Issue the operation
Ye
s
sheet
со не
от т
ве
тс
No
Rejection
вит
area
й
Issue of
the reject
report
Ground predelivery and acceptance tests
Submission of system test, issue of the
compliance documentation Check by the inspector
(представителем НИ-019)
Closing of the
submission
notifications,
Submission of the test No comments
signing of
the test reports
Th
e
no
n-
co
nf
o rm
i ty
re
ve
al
ed
the non-conformity
со не
i s
lys
от т
elimination ana
ве
th e
r
n fo
тс
etur
R
вит
й
Flight predelivery and acceptance tests
Ground system, engine test is performed in full, accepted by
the Engineering Inspection Department and IAC AR II
Не
со не
от т
ве
тс
вит
й
Primary Airworthiness Certificate
+ +
Product
+ quality
control
=
system
Cooperation with IAC AR
IAC AR
II-019 +
IAC AR II department