QUALITY CONTROL SYSTEM

Deputy Director of Quality – Chief Inspector Vasiliy S. Panyutishchev


JSC «SCA» - IAC AR - DGCA July, 2012
The Organizational Structure of the Quality Division of
KnA Branch
Deputy Director –
Chief Inspector of SSJ Program

Quality Management,
Certification and Standardization Engineering Inspection Department Incoming Inspection Department
Department

Engineering Inspection Bureau Purchased Products


Quality Management Bureau Incoming Inspection
of FAS
Bureau

Standardization and Aircraft Products


Engineering Inspection Bureau
Documentation Incoming Inspection
of FAL
Management Bureau Bureau

Engineering Inspection Bureau


of FTS
Product quality control system
Technical
Metrological
Casual inspection Designer’s supervision Audits discipline
supervision
supervision

Incoming Incoming inspection of appliances,


inspection materials and A/C parts.

Engineering inspection of
A/C assembly assembly quality, airframe
operational attachment, installations.
Power-on system testing.
inspection

Ground and flight Ground and flight testing with


issuing of the documentation
predelivery and confirming A/C airworthiness
acceptance tests
Incoming inspection

Cargo acceptance and incoming


inspection
Intermediate store

Results of
the check,
the incoming
Issue in Store Positive results
inspection
chart
production

lts
Не

esu
r
со не

ti ve
от т

ega
ве

N
тс
вит

Telecommunications Rejection
й

Non-conformity area
notification,
decision taking
Operational inspection
Execution of the operation according to
the process by the executor Check of execution by
the foreman (inspector)

Closing of
Submission of the operation
the operation for inspection No comments in the job card

Th
e n rev
on eal
-co ed
nfo
Execution of the retrofit as Taking the decision on

rm
ty i
per the waiver / concession retrofitting
Deviation of
Issue the operation
Ye
s

of waiver / Yes Return for the analysis or issue of


concession the defect
Не

sheet
со не
от т
ве
тс

No

Rejection
вит

area
й

Issue of
the reject
report
Ground predelivery and acceptance tests
Submission of system test, issue of the
compliance documentation Check by the inspector
(представителем НИ-019)

Closing of the
submission
notifications,
Submission of the test No comments
signing of
the test reports

Th
e
no
n-
co
nf
o rm
i ty
re
ve
al
ed

Elimination of the non-


conformity, retest
The deviation
Taking the decision on for repreparation
Не

the non-conformity
со не

i s
lys
от т

elimination ana
ве

th e
r
n fo
тс

etur
R
вит
й
Flight predelivery and acceptance tests
Ground system, engine test is performed in full, accepted by
the Engineering Inspection Department and IAC AR II

The 1-st flight as per the flight predelivery and


acceptance test program

Не
со не
от т
ве
тс
вит
й
Primary Airworthiness Certificate

+ +

Аттестованные производственные помещения

Product
+ quality
control
=
system
Cooperation with IAC AR

IAC AR

II-019 +
IAC AR II department

Check and agreement Participation in agreement


A/C testing and acceptance,
of the technical documentation, of the decisions, activities,
issuing of the documentation
agreement of the aimed at product
in the scope of the test programs
regulatory documentation quality improvement

Product manufacturing Issue of the documents


Accepted product quality
quality control confirming airworthiness
and completeness control
of the aircraft
Thank you for your attention