Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 24

Trafic survey report

TRAFFIC ENGINEERING AND INFRASTRUCTURE


01
Mif’fetin
02
Sauda Rukmana
Kholiah
(119130145) (119130147)

03
Tiara Agustin
(119130181)
DEFINI
TION
Traffic is the movement of vehicles
and people in the road traffic space,
while what is meant by Road
Traffic Space is infrastructure
designated for moving vehicles,
people or goods in the form of
roads and supporting facilities.
Traffic Survey is part of a
transportation study which aims to
collect data.
Traffic survey objectives and methods

Survey objectivs Survey methods


The purpose of this survey was to The method we use in this
determine the flow and capacity of traffic survey is the Traffic Flow and
on Jl. Pemuda Raya which includes the Capacity Method.
type of vehicle, the direction of movement
of the vehicle, the condition of the road,
by conducting direct observation and
census within a predetermined time
period.
equipment
1. Form
2. Board, Written Style
3. Clock / Stopwatch
4. Drinking Water
5. Snack
6. Metera
7. Documentation (Tool)
SURVEY steps
1. Observers occupy the posts that have been determined
2. The observer must occupy a position at the predetermined
observation points, namely by the roadsides at the observation
point
3. The view of the observer towards the observation path and facing
the direction of the coming of the vehicle
4. Each observer counts the number of vehicles at each point of the
observation path that has been determined by the type of vehicle
that has been determined
5. Observations were made with a recording interval of 15 minutes
throughout the data collection time in this case 6 hours
Schedule change of observation
Periode of Time Surveyor 1 Surveyor 2 Surveyor 3

08.00 – 09.00 rest on duty on duty

09.00 – 10.00 on duty rest on duty

10.00 – 11.00 on duty on duty rest

11.00 – 12.00 rest on duty on duty

12.00 – 13.00 on duty rest on duty

13.00 – 14.00 on duty on duty rest


Location and time of survey

● Location
Jl. Pemuda Raya ( penghubung Jl. Brigjend Dharsono dan Jl. DR. Cipto
Mangunkusumo ), Sunyaragi, Kec. Kesambi, Kota Cirebon, Jawa Barat.
● Time
Monday, November 02 2020
Road data
• Road Sketch

This road has 1 road, 2 lanes and 2 direction s. Skestch based lane
configuration :

Jl. Pemuda to Jl. Brigjend Dharsono ( West )

12m

Jl. Brigjend Dharsono to Jl. Pemuda ( East )


next
● Strite Size

Road Road Sidewalk Sidewalk Kerb Median Road


Width Length Height Width Width Side
12 m 1100 m 0,27 m 2,2 m 0,46 m - -
Traffic signs

next

NEXT
Observation table 1

From Pemuda Raya


Street untill Brigjend
Dharsono Street
Skestsa Jalan dan Batas-batasnya:

Universitas Survey
Swadaya Gunung Jati Pencacahan
Rekayasa dan Lalu Lintas
Prasarana Lalu Lintas Ruas 1. Jl. Pemuda Raya
2. Jl. Brigjend Dharsono
Kawasan: Jl. Pemuda, Kota Cirebon Hari: Senin
Arah Pencatatan: Jl. Pemuda Ke Jl. Brigjen Dharsono (Barat) Tanggal: 02 November 2020
Nam Surveyor: 1. Mif’fetin Kholiah (119130144) Waktu: 08.00-14.00 WIB
2. Sauda Rukmana (119130147)
3. Tiara Agustin (119130181)
Cuaca: Cerah Berawan / Mendung Hambatan Samping: Rendah

Periode 15 SM KRP KRU KB KTM


Menit
346 187 10 12 3
375 193 8 8 2
08.00 – 09.00 334 202 11 7 1
319 157 16 5 1
Jumlah 1374 Jumlah 739 Jumlah 45 Jumlah 32 Jumlah 7
315 128 7 6 1
322 145 4 7 5
09.00 – 10.00 295 106 11 2 2
320 163 8 4 3
Jumlah 1252 Jumlah 542 Jumlah 30 Jumlah 19 Jumlah 11
274 107 3 2 4
305 154 1 4 1
10.00 – 11.00 286 137 4 1 3
302 144 2 7 2
Jumlah 1167 Jumlah 542 Jumlah 10 Jumlah 15 Jumlah 10

297 89 1 3 3
262 113 2 6 4
11.00 – 12.00 254 120 5 5 2
270 87 3 2 1
Jumlah 1083 Jumlah 409 Jumlah 11 Jumlah 16 Jumlah 10
318 134 1 6 2
220 105 2 1 5
12.00 – 13.00 197 93 6 3 1
205 101 2 1 2
Jumlah 940 Jumlah 433 Jumlah 11 Jumlah 11 Jumlah 10
203 121 1 2 1
175 109 4 5 1
196 98 2 3 4
13.00 – 14.00 204 85 1 4 2
Jumlah 778 Jumlah 413 Jumlah 8 Jumlah 14 Jumlah 8
Observation table 2

FromBrigjend
Dharsono Street untill
Pemuda Raya Street
Skestsa Jalan dan Batas-batasnya:

Universitas Survey
Swadaya Gunung Jati Pencacahan
Rekayasa dan Lalu Lintas
Prasarana Lalu Lintas Ruas
1. Jl. Pemuda Raya
2.Jl. Brigjen Dharsono
Kawasan: Kesambi, Kota Cirebon Hari: Senin
Arah Pencatatan: Jl. Brigjen Dharsono Ke Jl. Pemuda Tanggal: 02 November 2020
Nam Surveyor: 1. Mif’fetin Kholiah (119130144) Waktu: 08.00-14.00 WIB
2. Sauda Rukmana (119130147)
3. Tiara Agustin (119130181)
Cuaca: Cerah Berawan / Mendung Hambatan Samping: Rendah

Periode 15 SM KRP KRU KB KTM


Menit
295 184 7 2 6
316 163 5 0 2
08.00 – 09.00 269 161 7 2 4
288 97 4 3 1
Jumlah 1168 Jumlah 605 Jumlah 21 Jumlah 7 Jumlah 13
169 210 4 3 2
323 86 4 0 5
09.00 – 10.00 332 102 3 2 0
265 82 7 0 3
Jumlah 1089 Jumlah 480 Jumlah 18 Jumlah 5 Jumlah 10
254 167 10 1 0
268 150 6 0 0
10.00 – 11.00 211 187 8 3 1
198 210 4 2 4
Jumlah Jumlah Jumlah 28 Jumlah 6 Jumlah 5

266 100 4 3 4
315 142 8 1 0
11.00 – 12.00 356 147 8 2 2
364 168 9 3 5
Jumlah 1301 Jumlah 557 Jumlah 29 Jumlah 9 Jumlah 11
224 109 4 1 1
229 145 4 0 4
12.00 – 13.00 150 133 3 2 0
167 145 5 0 4
Jumlah 770 Jumlah 532 Jumlah 16 Jumlah 3 Jumlah 9
253 133 4 3 5
194 219 5 0 0
210 174 7 1 0
13.00 – 14.00 218 115 4 1 4
Jumlah 875 Jumlah 641 Jumlah 20 Jumlah 5 Jumlah 9
Result of
observation
Rekayasa dan Prasarana Sketsa Ruas dan Batas - Batasnya 1. Jl. Pemuda Raya

Lalu Lintas 2. Jl. Brigjen


Dharsono
Rekapitulasi Perencanaan

Lalu Lintas Ruas

Kawasan : Kesambi, Kota Cirebon Hari : Senin, 02 November 2020

Arah Pencatatn : Jl. Pemuda ke Jl. Brigjen Dharsono Tanggal : 02 Niovember 2020

Komposisi LV % : HV % : MC % : Faktor SMP


Lalu Lintas

Arus Lalu Kendaraan Ringan Kendaraan Berat Sepeda Motor Kend. Bermotor Total Kendaraan
Waktu Lintas Tidak
(U + P) Bermotor

Pendekat kend / jam emp = 1,0 kend/jam emp = 1,3 kend / jam emp = 0,5 kend / jam smp / jam

smp / jam smp / jam smp / jam

1. Jl. 784 784 7 9.1 1374 687 2,165 1,480.1 7


Pemuda
08.00
2. Jl. 626 626 32 41.6 1,168 584 1,826 1,251.6 0
- Brigjen
09.00 Dharsono

1. Jl. 572 572 19 24.7 1,252 626 1,843 1,222.7 11


Pemuda
09.00
2. Jl. 498 498 5 6.5 1,089 544.5 1,592 1,049 0
– Brigjen
Dharsono
10. 00
1. Jl. 552 552 15 19.5 1,167 583.5 1,734 1,155 10
Pemuda
10.00
2. Jl. 742 742 6 7.8 931 465.5 1,679 1,215.3 10
- Brigjen
Dharsono
11.00

1. Jl. 420 420 16 20.8 1,083 541.5 1,519 982.3 10


Pemuda
11.00
2. Jl. 586 586 9 11.7 1,301 650.5 1,896 1,248.2 11
- Brigjen
Dharsono
12.00

1. Jl. 444 444 11 14.3 940 470 1,395 928.3 10


Pemuda
12.00
2. Jl. 548 548 3 3.9 770 385 1,321 936.9 9
- Brigjen
Dharsono
13.00

1. Jl. 421 421 8 10.4 778 389 1,207 820.4 11


Pemuda
13.00
2. Jl. 661 661 5 6.5 875 437.5 1,541 1,105 9
- Brigjen
Dharsono
14.00
documentation
THANK YOU
ANY QUESTION?

You might also like