ROAD SAFETY

PRESENTED BY

MD. GIAS UDDIN


ROAD SAFETY COMPONENTS:

Road Safety Audit of the existing


roads;

Road Safety Audit on the conceptual


designed roads 

2
ROAD SAFETY TASKS:

Feasibility Phase
-Survey road physical conditions
-Study and propose technical options for improvement
-Prepare cost estimates for proposed improvements
-Conduct road safety audits (following ADB’s Guide lines)
-Develop a road inventory database and a digital mapping of the project roads

Detailed Engineering Design Phase


Conduct road safety audits of designed roads

3
ROAD SAFETY IN BANGLADESH:

1. Road Accidents cause 1% loss of GDP


2. Road Accidents Growing up to 2007 then remain the
same (not rising nor going down)
3. Two Types of Accident Statistics:

Source Fatal injury Grievous injury Simple injury Total Recorded


Accidents Accidt. Accidt Accidt.
BRTA 2010 1,883 378 58 2,319
FIRs, Police 2,646 1,389 414 4,449
2010

4
Black Spots: Dhaka- Sylhet National Highway-N2
N-2 Dhaka-Sylhet
no. Name of Location length Accidents Casualties
km1 km2
(km) Fatal Injury Total Fatal Injured Total
2 Shabandar Bus Stand 27,0 27,2 0,3 6 5 11 14 10 24
117 Panchrukhi Bazaar 32,8 0,1 3 3 6 4 6 10
116 Shecherzar Bazaar 43,4 0,1 6 2 8 6 4 10
115 Panchdona Bazaar 45,5 0,1 3 3 6 6 5 11
119 Narshingdi Intersection 49,2 0,1 5 2 7 5 4 9
102 Shaheprotap Intersection 50,0 0,1 14 8 22 18 20 38
103 Sherpur Bazaar 53,0 0,1 10 8 18 25 13 38
110 Kararchar 53,7 0,1 9 1 10 12 3 15
114 Itakhola 56,4 0,1 4 5 9 6 6 12
111 Sayednagar 57,0 0,1 6 0 6 8 6 14
107 Morjal Bazaar 70,0 0,1 7 4 11 7 12 19
105 Barolcha Bus Stand 74,7 0,1 8 3 11 13 15 28
120 Raipur/ Nilkuthi Bus Stand 81,4 0,1 5 2 7 6 3 9
3 Before 86 km-post 85,9 86,5 0,7 15 2 17 18 2 20
118 Kariala Bus Stand 87,3 0,1 8 1 9 8 1 9
104 Near Ashganj Rice Mill 92,0 0,1 14 0 14 23 5 28
101 Brahmanparia Intersection 93,0 0,1 9 4 13 26 22 48
106 Sarail Road Intersection 93,7 0,1 9 3 12 15 10 25
109 Islamabad Bus Stand 95,9 0,1 6 0 6 13 4 17
8 Baruira Bazaar/Bus stand 97,0 97,1 0,2 6 0 6 14 0 14
11 Shabajpur Bus Stand 99,2 99,4 0,3 7 1 8 8 1 9
5 Shabajpur Bazaar 99,7 99,9 0,3 6 1 7 12 6 18
4 Islampur Bazaar 111,0 111,3 0,4 3 4 7 5 14 19
13 Hafizpur Bus Stand 165,5 165,8 0,4 3 4 7 3 4 7
113 Bahubal Intersection 168,6 0,1 3 4 7 3 10 13
112 Nayabazar Bus Stand 171,2 0,1 6 0 6 6 8 14
12 Srimangal Thana Hlth Cmplx 195,1 195,3 0,3 6 1 7 6 2 8
108 Kaliabazar Bus Stand 197,5 0,1 8 1 9 10 8 18
122 Giasnagar Bazaar 203,9 0,1 4 2 6 4 3 7
121 Mokam Bazaar Bus Stand 205,9 0,1 4 2 6 4 4 8
9 Jagannathpur Prmry School 209,3 209,6 0,4 4 3 7 4 9 13
6 Kusumbag Market 212,1 212,6 0,6 8 4 12 10 5 15
1 Shabandar Bus Stand 215,3 215,5 0,3 6 3 9 12 17 29
7 Kamalpur Bazaar 220,9 221,1 0,3 5 3 8 8 6 14
10 Sherpur Bazaar 236,0 236,5 0,6 7 2 9 8 4 12
233 91 324 350 252 602 5
Black Spots: Daulatdia-Jhenaidah-Khulna
National Highway-N7

6
ACCIDENT DATA PROJECT ROADS:

7
ESTIMATION OF ACCIDENT ON PROJECT ROADS:

8
Feasibility Phase:

- Conducted road safety audits (following ADB’s Guide lines)


on few roads

The Following will be commenced very soon:


1. Survey road physical conditions
2.Study and propose technical options for improvement
3. Prepare cost estimates for proposed improvements
4. Develop a road inventory database and a digital mapping of the
project roads

9
PHOTOS ON CHITTAGONG-COX’S BAZAR ROAD:
PHOTOS:
COMILLA-B.BARIA ROAD (Left Side)
DHAKA-SYLHET ROAD (Right Side)
THANK YOU