TITLE: Cause and Effects of Construction material wastage in Etete Plc.
Contents
introduction
problem statement
objective of study
scope of the study
methodology
result and discussion
conclusion and
recommendation
INTRODUCTION
Material wastage in construction is notable issue in construction project .types of construction waste :concrete,wood,plastics,ferrous metal etc.
major causes of material wastage in construction
are;- workers mistakes, selection of low quality
products, determination of types and dimensions of
material without considering waste, lack of
information about types and sizes of materials on
design ,design changes and revisions, Over ordering
of material, inadequate storage protection, etc.
Effects of construction material
wastage
Diminishing landfill space due
incremental quantities this waste
Depleted building materials
Diminishing of landfill space
Loss of Economy
Damage to the environment
PROBLEM STATEMENT AND
JUSTIFICATION

building projects in Addis Ababa construction


material wastage management is very poor so that
this problem is resulting in the deterioration and
damage to the materials the effect of construction
material wastage is the challenge of most
construction companies in Lideta sub city
Justification
This project will have reducing benefits
for construction material wastage that
will occur in lideta sub city office
building. Thus, this study include:
causes and effects of construction
material wastage.
Scope of the project
The study is limited to Lideta sub city building office
building.
This research focused on the construction material
wastage in construction.
For some material like formwork, H.C.B block and
reinforcement steel.
Objective of the project

 To study Cause and effect of construction


material wastage in etete plc. Lideta sub city
office building project.
methodology

Research design is the


overall plan for
obtaining answers to
the questions that rise
at the being studied
In this study interviews,
structured questionnaire
and site visits were used
in the gathering of data
targeted population
In this construction site the target population have been choose site engineer, contractor, skilled labors, and Forman and store keeper.
Source of Data collection
 Primary data collection

 Secondary data
collection
Personal observation

Waste Minimization

order right amount of materials


recycle and reuse
store materials properly
get the right size material
Conclusion
The study found a low quality
products were an extremely
influential cause to the
wastage of construction
materials at site
Recommendation
 establish positive attitudes
towards waste
minimization at all levels in
a construction project.
 provide waste reduction
training
 Minimizing design
changes

 policies like kisen strategy