Tallest Structures in India India Tower-525 Mtr

Kohinoor
Tower-205
Oberoi Woods- Mtr
170 Mtr
Lakshachandi
Heights-120
Mtr
World’s Tallest Building
LATEST TRENDS IN P&M-BURJ DUBAI-
Construction Challenges
• Construction Started on Jan 2004
and ended in Jan 2010.
• Total Floors: 164.
• Height : 818 Mtrs.
• Concrete : 250000 CUM
• Steel : 35000 Tonnes.
• No of Tower cranes: 3 Nos Make:
FAVCO Australia
•Max cap of TC : 25 T, 19 T, 11 T
•Type of Cranes: Jumping Crane.
• No of Lifts Installed: 19 Nos
•7 Twin and 12 single hoists
•Speed of Lifts: 1.8 mtr per Sec
Construction Challenges in High Rise Building
Construction Challenges in High Rise
Building
1) Extensive Tests done on
ground by creating a
stimulating Concrete
pressure on Horizontal
laid Pipe Line.
2) Concrete pumps Capacity
to Pump upto 570 Mtr.
3) Concrete Pumps- 2 Nos
BSA 14000 SHP D
4) Max Pressure of Pump
Hydraulics: 400 Bar
Construction Challenges in High Rise Building
1) Design of Concrete Mix:
° Base plate:C80A (maximum
particle size 20 mm)
° Up to level 26 (height 95 m) for
the walls: C80A (maximum
particle size 20 mm)
° Up to level 126 (height 452 m)
for the walls: C80 (maximum In the central core of the Burj Dubai, the two
main lines can be folded down onto four risers
particle size 14 mm) in just a few movements. The risers lead to the
° Up to level 154 (height 570 m) stationary Putzmeister booms on the decks
and up in the tower.
for the walls: C60
° Concrete with compressive
strength C50 is compulsory for
creating the decks of all storeys
Construction Challenges in High Rise Building
• Massive wall bearings hold
the concrete lines which
weigh over 50 tons.
• Hydraulic lifting device
makes it easier to replace
pipes.
• "Iron sword" for
emergencies.
• Stationary boom without
ballast.
Construction Challenges in High Rise
Building
• The last of the concrete
residue is pushed out of
the delivery line from
the top end of the
pump line using a
sponge ball and
compressed air.
Latest Trends In P&M
I. Top Less Crane.

II. Self Climbing Tower Crane.

III. Self Climbing Concrete Boom Placers.

IV. Tele Handler.

V. Tele Conveyor.

VI. Scissor Lift.

VII.Rebar Tying machine.

VIII.Rebar Bending and Cutting Machine.