Maintain the master data
• MRP 1 View
1. Maintain the MRP type “VB” Manual reorder point planning
2. Maintain the re-order point (If the stock falls below this quantity, the system
flags the material for requirements planning)
4. Maximum Stock Level (Quantity of the material in this plant that may not be
exceeded)
Page 3
Process step for Re-order based MRP (Consumption based planning)
MRP 1 View
Page 4
Stock level
Page 5
Run the MRP for the Material ‘14000004' Bearing Case
System will create the purchase requisition of 7 quantity to maintain the
maximum stock of 10 quantity.