HEALTH, SAFETY & ENVIRONMENT PLEDGE
On this day, | I solemnly affirm that | I will rededicate
myself | to the cause of Safety, | Health, | Environment
protection | and workplace housekeeping | by
observing | established rules, | regulations | and
processes.|
I will develop necessary attitude | for prevention of
accidents, | diseases | and protection of environment |
at workplace | in the interest of self, | family, |
community, | company | and the nation at large |
Purpose…..
To ensure/prevent:
Uninterrupted construction work - normal productivity
Safety hazards / health hazards
Legal & other regulatory hassles – BMC notice/penalty/stoppage
Emergencies – water/food contamination, break out of malaria, dengue, jaundice
To maintain serviceability of P&M
To protect formwork against damage or deterioration
To protect resources (sand, cement, chemicals etc.)
To prevent water logging/flooding – site, office, camps
03
Session A
Safety Hazards
High Wind & Heavy Rain
Poor visibility
Power disruption – short circuit
Communication (interment, mobile) outage
Water logging/flooding – camps, sunken area, site, office
Lightening/Thunderstorm
Felling of tree/branches
Soil erosion - land slide & cave-in
05
Typical Monsoon Hazards…..
Health Hazards
Food/Water contamination
Break out of contagious diseases
Insects & Reptiles infestation
Water stagnation & mixing with sewer and food waste
Food waste decomposition – bad odour
Poor personal hygiene – wet clothe, wet shoes
Choking/overflow of urinals/toilets
Rain water dripping in the camps/offices
06
Typical Monsoon Hazards…..
Mechanical & Electrical Hazards
Power outage/disruption
Electrical system exposed to rain
Electrical short circuit
Break down & collapse of Tower Crane
Lack of spare parts – high lead time
Disruption in erection/jumping of crane
Break down of pump and machinery
Lack of visibility
Twisting and turning of suspended load
07
Typical Monsoon Hazards…..
Other Hazards
Slippery/muddy /water logged access roads
Accumulated debris & scrap
Exposed excavation edges & heaps of soil
Absence of natural drainage/municipal drainage
Unsecured loose materials/ light weight materials – GI sheets, Mivan, Board
Temporary structure
Safety Nets
Jumping of safety screen
08
Session A
16. Weekly pest controls for inspects, cockroaches, bed bugs, rats
camps/office/site/guest houses.
19. Identify nearest Govt. Hospital / BMC Hospital for snake bite.
011
Administration…..
20. Doctor visit – minimum thrice a week (more visits as per site requirements).
22. Monthly Blood Test of all workers. Keep records for BMC validation.
26. Conduct personal health & hygiene training in camps fortnightly with the help of
doctor.
013
Provision of bund infront of labour colony room door.
Covering of roof shade of room by tarpaulin.
Pest Controlling & Fogging at regular interval.
Snake pest controlling before first rain.
Dust bins with lid & Placing of dust bin under shade or covering with tarpaulin to
avoid collection rain water in dust bins.
Daily disposal of waste collected in dust bins.
Shade to water tank or covering it with tarpaulin.
BMC approved lid to water tank. ( MS lid )
Weekly cleaning of water tank.
Mosquito Net to every room.
Health Hygiene awareness through Training / Mass TBT on weekly basis.
Shade to bathing area.
Routing of roof shade rain water with the help of channel.
Closing of floor cut-out, lift shaft in such a way that rain water should not pass
through it.
Closing of floor cut-out, lift shaft in such a way that rain water should not pass
through it.
Shoe rack should be placed under the shade.
Proper drainage through passage area of labour colony.
Stacking of wooden & reinforcement materials over rack.
Covering of materials stacked over racked by tarpaulin.
P & M…..
a. Receiving station
d. Diesel Generators
024
P & M…..
026
P & M…..
3. Cable routing - above ground supported by insulated hooks
027
P & M…..
4. Cable joints
028
P & M…..
5. Maintain safe distance from naked electrical lines (HTC, LTC)
029
P & M…..
6. Cover Earthing Pit Funnel with lid to prevent choking.
030
P & M…..
7. Distribution Board – under building or under shed.
031
P & M…..
8. Prepare “Monsoon Logistic Plan” and get it approved.
032
P & M…..
c. The dewatering pumps should be placed properly with support (as shown in
pic)
d. Use GI pipe as vertical if the excavated pit depth is more than 10 mtrs
033
P & M…..
038
P & M…..
If the wind speed is more than 20 m/s the crane operation should be stopped.
If the wing speed is more than 12 m/s don’t do the crane jumping and height
extension work.
039
P & M…..
All the electrical components and machineries should be covered with tarpaulin
040
P & M…..
1. Emergency Light in Labour Camps, Sites & Offices
2. Stand by Diesel Pump
3. Exclusive electrical supply for dewatering pump
4. Maintain inventory of spare parts
5. An emergency service vehicle in each cluster of projecys
041
Safety…..