Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 7

RV College of Go, change the world

Engineering Go, change the world


RV College of
Engineering
First Presentation
Dept of Mech. Engg.

CONFIGURATION MANAGEMENT IN AEROSPACE


INDUSTRY USING TEAMCENTER

Students Name and USN no Internal Guide External Guide


PARANJOY BASAK(1RV16ME073) RAMU BHIMA

Project work at COLLINS AEROSPACE


RV College of
Engineering
Introduction-MOTIVATION Go, change the world

Market Motivation: After implementation of Teamcenter, Lockheed Martin


Aeronautics had reduced their cycle time by 35% during the production of F-
35 saving billions of dollar (2006).
Industrial Motivation: Most of the aerospace industry still don’t implement
configuration management, so implementation of it may expedite the
industrial process
 Knowledge Motivation: During execution of the project, students learn
Teamcenter (Siemens), workflow, SAP, DIN, ISO, ASME Standards, ECN release
process and Teamcenter Architecture.
RV College of
Engineering
Key Literature Survey Go, change the world

Reference Contribution Scope for research work


Burgess T.F., Mckee D., Kidd C., Burgess et .al performed a review on the implementation of CM in This paper gave a overview of the status
“Configuration Management in the aerospace industries in European union showing the lacuna in terms of of CM in the industries. And also
Aerospace Industry: A Review of
Industry Practice”, International Journal implementation of CM practices and analysed it using Likert Chart and suggested what sort of questionnaire can
of Operations and Product Management, chi-square analysis. He showed most of the top tier companies have be utilised to perform CM in industry.
Vol. 25 No. 3, 2005, pp. 290-301 proper idea about the details of CM and low tier companies are merely
treating it as compliance.

Xu Yuchun, Malisetty Mahesh Kumar, Xu et. al discussed about the conventional CM process and what are the CMII and Agile Configuration
Round Michael, “Configuration recent developments that industries are implementing on their Management process are the new
Management in Aerospace Industry”,
2nd International Through-life configuration management process. They also discussed what are the processes . So further research can be
Engineering Services Conference, important steps that aerospace industries should incorporate during carried out in order to see its efficacy on
Cranfield, UK, 2013, Vol 11, pp 183-186 configuration management. current industry.

Zhang Yu, Cai Hua, “Research and In this paper they have discussed how teamcenter can be implemented
Implementation of Product Lifecycle in various stages of Product Lifecycle management.
Management Platform Based on
Teamcenter”, Advanced Materials
Research Vols. 538-541, 2012, pp 2961-
2966
Project Objectives
RV College of Go, change the world
Engineering

To become well versed with the industrial processes and the organisational
structure.

Learn and implement Teamcenter and workflow in the prescribed industrial


project

To implement ECN release process in teamcenter


RV College of
Engineering
Methodology Go, change the world

Literature Survey

To gather details of Lighting processes and drawing guidelines,


part numbering and revision control

Implementing the details in Teamcenter and workflow.

Checking parts and drawings as per standards before releasing


for production.

Standard parts and documents creation


and releasing in teamcenter

Transferring details in SAP to release /


lock the drawings.

Carrying out export control, marking and


classifying drawing and documents.

Implementing TeamCenter to
upgrade testing process
RV College of
Engineering Milestone Go, change the world
RV College of Go, change the world
Engineering
Suggestion and corrections

You might also like