Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 19

OPERATE TOOLS AND PLANT

PRODUCTION MACHINES

Sub Judul
Learning Objectives:

- Students can prepare the equipment


- Students can prepare splasher (hand
sprayer)
- Students can prepare splasher vehicles
- Students can prepare hand tractor
- Students can prepare prosesing results
machine
- Students can prepare the filling machine
Setting up the equipment and machinery
operated Ready Condition
Setting up of equipment before use

TOTAL
  NEEDS
FIT

EQUIPMENT Sharp
Strong
 

CONDITIONS
EITHER
Preparing splasher (hand sprayer) before
operation

Tank
-Check the leakage from
Check-out of the dirt

Pump
-Good condition
Atomizer system
-Check the leakage from
Check-pemancarannya

Check the gasket


Rendam warm-water
(If necessary)
Tell-lubricant
Setting up
splasher
vehicles before
  operated

Preparation equipment: Setting up Sprayer calibration


Check-motor unit spray material: Fill tank with water
Select nozel
Check-sprayer unit -Read the packaging
Measure debit nozel
Turn the motor - label Measure the width of
Heat-motor Mix in spray - Observed results spray
Check-leakage Content-sprayer Calculate angle spray
Close the hole-filling
Setting up Hand Traktor

a). Checking the mur-bolts


b). Checking V-belt
c). Check the fuel
d). Checking the fuel filter
e). Checking the air filter
f). Checking the cooling system.
g). Checking the control lever / control.
h). Checking tire pressure
i) Checking the oil system
j). Checking tool.
k). Preparation of equipment.
Checking the V belt
Checking Belt Radiator Fan
Check the fuel
Checking the fuel filter
Checking air filter
Checking tires
Checking Engine Oil
Setting up of equipment
Places Checking Transmission Oil
Setting up prosesing results machine

 Preparing the Machine to fall unhulled rice grain


- All of which revolve give with lubricant
- Clean the chain of straw and was belt-wax
 Preparing the Machine for pouding
- Check all the equipment pouding, which rotates the
given lubricant
- Filter cleaned bran and checked if there are damaged.
- Check water level unhulled rice, the water should
range between 13 - 15%.
Preparing the engine pump

1. Place the pump at the appropriate position


2. Make a continuation between the pump with the
power source, construction, when separate
3. Create isap channel, which connects the water
source to pump
4. Place the foot valve and the channel (footklap) at the
end of the network
pump, so that the channel isap and pump house is
always full of water.
5. Connect to pump channel suck
6. Place the distribution channel to the pump.
Pump Installation instructions

You might also like