Professional Documents
Culture Documents
Bow Thruster
Bow Thruster
Bow Thruster
PARAMETR SPECIFICATION
Watt 400 KW
RCU
CONTROL LCP BRIDGE
PANEL
LUBE RCU
OIL BRIDGE
RB1 RB 2
OPERATION
1. Control Supply (24 V DC): provide control supply for all RCU
2. Main Supply ( 415 V, 50 Hz, 3-phase): provide operating power to motor
3. Heating Supply( 230 V, 50 Hz, single phase): provide supply to heating
element to avoid moisture with in circuit and converted to 24 v DC within
circuit for control supply as well.
ALARMS
1. TT ECU POWER (TUNNEL THRUSTER ELECTRONIC CONTROL UNIT)
2. LUB OIL LEVEL
3. RESISTANCE BOX TRIP TEMP
4. DRIVE FAULT
5. MOTOR WARNING
6. MOTOR TRIP
7. WIRE BREAK EMRGENCY STOP
8. DRIVE POWER