Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 7

KAPO PATIO 24 BEAUTY SALON

Subject- Building Construction


Topic- Ribbed Slab Case Study
Prepared by- Janhavi Chopra | 180002
ABOUT

• The Kapo Patio 24 project features a 6 meters high ceiling, concrete block
walls and ribbed slab.
USE OF THE RIBBED SLAB

The choice of straight line luminaires makes the precise marking for workbenches.
ABOUT

• The project's strategy was to


create 3 levels for the
distribution of services and thus
multiply the spaces. The ground
floor, in addition to the
reception, contains 2 living
rooms divided by 2 Trees that fill
the environment and lead the
look to the ribbed slab with
illuminated buckets.
ABOUT

The wooden panel forms a volume that houses the stock and the team's rest area, access to this
area is through a side door mimicking the panel. When climbing the metal staircase, we reach
the top of the wooden volume where there are more hairstyling benches and washbasins. On
the next level are the makeup stands, manicures and a massage room. The strategy of dividing
the space vertically by creating mezzanines frees the central span and allows visual
connection between all levels.
The choice of materials such as concrete, granite, marble and rebar makes a
counterpoint to wood, leather and vegetation, bringing balance between the raw
and the organic to create a welcoming, stripped and functional environment. Pure
and elegant, the color palette that makes up the space emphasizes the
professionalism of the team and contributes to the creation of a welcoming and
uncluttered environment.

You might also like