Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 37

PROBABILISTIC FRACTURE

MECHANICS FOR
OPTIMIZATION OF SUBSEA
GAS PIPELINE INSPECTION
BY
INDERA SADIKIN
DJOKO SUHARTO
MECHANICAL ENGINEERING DEPARTMENT
INSTITUT TEKNOLOGI BANDUNG
INDONESIA
FREE SPAN
VON KARMAN
VORTEX STREET
PIPE

CROSS-FLOW
VIBRATION
FATIGUE
FAILURE
HOW TO PREVENT FAILURE?

 FREE SPAN INSPECTION


PROBLEM
 EXPENSIVE!

 TIME CONSUMING!
HOW TO OPTIMIZE?
 INSPECTION SCHEDULE
FACTOR TO CONSIDER?
 PROBABILITY OF FAILURE

TIME FOR
INSPECTION

INSPECTION
INTERVAL
SUMMARY 1
HOW TO CALCULATE
PROBABILITY OF FAILURE?
 PROBABILISTIC FRACTURE
MECHANICS
FRACTURE MECHANICS
 Most failures begin with crack
CRACK INITIATED FAILURES

 LEAK

 BREAK
STRESS
INTENSITY

K   a
FRACTURE
TOUGHNESS
 KIC
HOW DOES
IT FAIL?
 LEAK

 BREAK
LEAK

 KI
< KIC
 STABLE CRACK GROWTH

 LESS DANGEROUS
BREAK

 KI
≥ KIC
 UNSTABLE CRACK GROWTH

 CATASTROPHIC!
SUMMARY 2
MODELING CRACK
PROPAGATION
 CRACK CLOSURE TECHNIQUE
FINITE
ELEMENT
ANALYSIS
CRACK MODEL
V1
C2 437.1

CRACK TIP 410.3

383.5

356.7

330.

303.2

276.4

249.6

222.8

196.1

169.3

a
t
142.5

115.7

88.95
Z
X 62.17

Y 35.39
Output Set: MSC/NASTRAN Case 1
Deformed(4.937E-8): Total Translation 8.615
Contour: Solid Von Mises Stress
FEA RESULT
 NON-DIMENSIONAL STRESS
INTENSITY PARAMETER
K   a CRACK
PROPAGATION

da/dN
SUMMARY 3
PROBABILISTIC FRACTURE
MECHANICS ANALYSIS
 Analysis variables are probabilistic
LOAD DATA
CRACK DATA
 LOGNORMAL DISTRIBUTION
MATERIAL DATA
FRACTURE TOUGHNESS
 MAXIMUM GUMBEL DISTRIBUTION
MATERIAL DATA
CRACK PROPAGATION
 NORMAL DISTRIBUTION
STOCHASTIC
CRACK GROWTH
Annual

Random FAIL OR NOT?

Random Random
CRACK GROWTH
SIMULATION
DIRECT
SIMULATION
 All possible combination of
stochastic parameters are
simulated

 TIME CONSUMING!
MODIFIED DIRECT
SIMULATION
 Only severest block of distribution
is simulated
 Simulation stopped when no failure
occurs
ILLUSTRATION OF MODIFIED
DIRECT SIMULATION

Block of lowest Block of highest


yield strength applied stress
RESULT

Inspection
schedule at
reliability
99.99%
Arigato

You might also like