JAZAN INTEGRATED GASIFICATION COMBINED CYCLE PROJECT

JIGCC-5 – Utilities And Common Areas.

ELECTRICAL CAMP INSPECTION.


LOCATION- RAYMUND CAMP
Técnicas Reunidas – TR JIGCC- 5

OCTOBER 23, 2018

No. 1
OBSERVATIONS NEED
IMPROVEMENT.

No. 2
Project: JIGCC – 5. Date: OCTOBER 23,2018.
Contractor: Técnicas Reunidas Location: RAYMUND CAMP
Subcontractor RAYMUND Category: PANEL
:

Observation : Power distribution wire/cable Rectification: Provide sealant/ insulation for


found without wire protection. wire and maintain housekeeping.

No. 3
Project: JIGCC – 5. Date: OCTOBER 23,2018.
Contractor: Técnicas Reunidas Location: RAYMUND CAMP
Subcontractor RAYMUND Category: PANEL
:

Observation : Main Panel Board found without Rectification: Provide information and sealant
Panel information, Single line diagram, Body for wire.
ground and Wire protection. Cladding

No. 4
Project: JIGCC – 5. Date: OCTOBER 23,2018.
Contractor: Técnicas Reunidas Location: OUTSIDE BUILDING
Subcontractor RAYMUND Category: PANEL
:

Observation : Panel found without Single line Rectification: Update for all panel. Update cable
diagram information, Body grounding , without wire and provide suitable outlet or equivalent IP
cable protection wire and used Outlet is not 65 rating.
suitable for outside area and expose cables
for bell.

No. 5
Project: JIGCC – 5. Date: OCTOBER 23,2018.
Contractor: Técnicas Reunidas Location: OUTSIDE BUIDING
Subcontractor RAYMUND Category: PANEL
:
Observation : Panel found without Single line Rectification: Update for all panel and cable
diagram information, Body grounding , management.
Junction box without cover, cable
management and Update maintenance
(cleaning) and cover all openings

No. 6
Project: JIGCC – 5. Date: OCTOBER 23,2018.
Contractor: Técnicas Reunidas Location: OUTSIDE BUIDING
Subcontractor RAYMUND Category: CABLE AND UTILITIES
:
Observation : Cable found without protection Rectification: Rectify
(Power going to Water pump) and power cable.

No. 7
Project: JIGCC – 5. Date: OCTOBER 23,2018.
Contractor: Técnicas Reunidas Location: OUTSIDE BUILDING
Subcontractor RAYMUND Category: CABLE AND UTILITIES
:

Observation : Water pump found without body Rectification: Update cable wire and provide
grounding, without cable protection and outlet suitable outlet or equivalent IP 65 rating.
used is not water proof.

No. 8
Project: JIGCC – 5. Date: OCTOBER 23,2018.
Contractor: Técnicas Reunidas Location: TOILET AND SHOWER AREA
Subcontractor RAYMUND Category: CABLE AND UTILITIES
:

Observation : Power cable for Flood light Rectification: Provide cable insulation and
found without cable protection and Junction Junction box.
box for splicing area.

No. 9
Project: JIGCC – 5. Date: OCTOBER 23,2018.
Contractor: Técnicas Reunidas Location: ROOM AND SHOWER AREA
Subcontractor RAYMUND Category: CABLE AND UTILITIES
:

Observation : Outlet and Switches found Rectification: Update for all rooms.
without information tag, Smoke detector not
available in each room and Junction Box
without cover .

No. 10
Project: JIGCC – 5. Date: OCTOBER 23,2018.
Contractor: Técnicas Reunidas Location: TOILET ROOM
Subcontractor RAYMUND Category: CABLE AND UTILITIES
:

Observation : Exhaust Fan used without Rectification: Update for all unit.
proper plug.

No. 11
Project: JIGCC – 5. Date: OCTOBER 23,2018.
Contractor: Técnicas Reunidas Location: DINING AREA
Subcontractor RAYMUND Category: CABLE AND UTILITIES
:

Observation : Insect killer direct connection to Rectification: Provide Junction box end to end
the power source found without Junction box and plug & outlet for insect killer.
end to end.

No. 12