CE-102 Civil Engineering Materials 08/07/21 13:20 1

CE-102 Civil Engineering Materials 08/07/21 13:20 2


CE-102 Civil Engineering Materials 08/07/21 13:20 3
Length = 2 x Width + Thickness
Brick of Mortar
Thickness of Mortar 0.5 Inch,
0.75 Inch
Frog

Length 9 inch
Stretcher

Height 3 inch

Riser

Width 4.5 inch


Header
CE-102 Civil Engineering Materials 08/07/21 13:20 4
Brick Mold

CE-102 Civil Engineering Materials 08/07/21 13:20 5


Classification of Bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 6


CE-102 Civil Engineering Materials 08/07/21 13:20 7
 When exposed to rain or other climatical
agents are readily disintegrated.

CE-102 Civil Engineering Materials 08/07/21 13:20 8


CE-102 Civil Engineering Materials 08/07/21 13:20 9
 After sun drying, these bricks are burnt in
Kiln for certain period then cooled and
removed from kiln and supplied to markets.

CE-102 Civil Engineering Materials 08/07/21 13:20 10


CE-102 Civil Engineering Materials 08/07/21 13:20 11
CE-102 Civil Engineering Materials 08/07/21 13:20 12
CE-102 Civil Engineering Materials 08/07/21 13:20 13
CE-102 Civil Engineering Materials 08/07/21 13:20 14
First class bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 15


First class bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 16


CE-102 Civil Engineering Materials 08/07/21 13:20 17
CE-102 Civil Engineering Materials 08/07/21 13:20 18
CE-102 Civil Engineering Materials 08/07/21 13:20 19
Second class bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 20


Second class bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 21


CE-102 Civil Engineering Materials 08/07/21 13:20 22
CE-102 Civil Engineering Materials 08/07/21 13:20 23
CE-102 Civil Engineering Materials 08/07/21 13:20 24
CE-102 Civil Engineering Materials 08/07/21 13:20 25
CE-102 Civil Engineering Materials 08/07/21 13:20 26
CE-102 Civil Engineering Materials 08/07/21 13:20 27
CE-102 Civil Engineering Materials 08/07/21 13:20 28
CE-102 Civil Engineering Materials 08/07/21 13:20 29
CE-102 Civil Engineering Materials 08/07/21 13:20 30
CE-102 Civil Engineering Materials 08/07/21 13:20 31
 Preparation of Brick Earth
◦ Un-soiling
◦ Digging
◦ Weathering
◦ Blending
◦ Tempering
 Molding of Bricks
 Drying of Bricks
 Burning of Bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 32


CE-102 Civil Engineering Materials 08/07/21 13:20 33
Digging brick clay

CE-102 Civil Engineering Materials 08/07/21 13:20 34


Blending brick clay

CE-102 Civil Engineering Materials 08/07/21 13:20 35


Manual Tempering of brick clay

CE-102 Civil Engineering Materials 08/07/21 13:20 36


CE-102 Civil Engineering Materials 08/07/21 13:20 37
CE-102 Civil Engineering Materials 08/07/21 13:20 38
Hand molding of bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 39


CE-102 Civil Engineering Materials 08/07/21 13:20 40
CE-102 Civil Engineering Materials 08/07/21 13:20 41
CE-102 Civil Engineering Materials 08/07/21 13:20 42
Extruded – Wire Cut Extruded – Smooth

Wood Mold
Extruded – Raked
CE-102 Civil Engineering Materials 08/07/21 13:20 43
CE-102 Civil Engineering Materials 08/07/21 13:20 44
Drying of bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 45


Drying of bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 46


Protecting dry bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 47


CE-102 Civil Engineering Materials 08/07/21 13:20 48
CE-102 Civil Engineering Materials 08/07/21 13:20 49
CE-102 Civil Engineering Materials 08/07/21 13:20 50
CE-102 Civil Engineering Materials 08/07/21 13:20 51
Burning of bricks in kilns

CE-102 Civil Engineering Materials 08/07/21 13:20 52


Burning fuel

CE-102 Civil Engineering Materials 08/07/21 13:20 53


Preheating bricks
Loading raw bricks

Unloading cooled Cooling bricks


bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 54


Preheating

Fuel
supply
Hot air leaving

Loading raw bricks

Cool air entering

Removing cooled bricks


Cooling
bricks
CE-102 Civil Engineering Materials 08/07/21 13:20 55
Preheating

Hot air leaving

Loading raw bricks

Cool air entering

Removing cooled bricks


Cooling
bricks
CE-102 Civil Engineering Materials 08/07/21 13:20 56
 https://www.youtube.com/watch?v=SDiUoiDL
K6E
 https://www.youtube.com/watch?v=E_8zCKv
7KHs

CE-102 Civil Engineering Materials 08/07/21 13:20 57


CE-102 Civil Engineering Materials 08/07/21 13:20 58
 Heavy duty bricks
 Perforated bricks
 Paving bricks
 Hollow bricks
 Clay tiles
 Fire-clay or refractory bricks

CE-102 Civil Engineering Materials 08/07/21 13:20 59


CE-102 Civil Engineering Materials 08/07/21 13:20 60
CE-102 Civil Engineering Materials 08/07/21 13:20 61
CE-102 Civil Engineering Materials 08/07/21 13:20 62
CE-102 Civil Engineering Materials 08/07/21 13:20 63
CE-102 Civil Engineering Materials 08/07/21 13:20 64
CE-102 Civil Engineering Materials 08/07/21 13:20 65
CE-102 Civil Engineering Materials 08/07/21 13:20 66
 Structure Test: A specimen is broken and its
structure is examined.
 It should be homogeneous, compact, and free
from defects e.g., lumps and holes, etc.
 Soundness test: This test is performed by
striking two specimen bricks with each other.
The bricks should not break and a clear ringing
sound should be produced.
 Hardness test: This test is performed by
making a scratch on brick surface with the help
of finger nail. If no impression is left on
surface, the brick is considered to be
sufficiently hard.

CE-102 Civil Engineering Materials 08/07/21 13:20 67


CE-102 Civil Engineering Materials 08/07/21 13:20 68
CE-102 Civil Engineering Materials 08/07/21 13:20 69
CE-102 Civil Engineering Materials 08/07/21 13:20 71
CE-102 Civil Engineering Materials 08/07/21 13:20 72
CE-102 Civil Engineering Materials 08/07/21 13:20 73
For this type of bond, each course is made
up of alternate headers and stretchers.
Each header is centered on a stretcher
above and below and every alternate
course begins with a header in the corner.
For breaking the vertical joints in the
successive courses, quoin closers are
introduced in alternate courses next to the
header. This bond can be significantly sub-
divided into two diverse types:

Walls with Flemish Bond are complex to


erect and demand greater skills.

CE-102 Civil Engineering Materials 08/07/21 13:20 74


This bond is very similar to the English
Bond, but this one has courses of headers
inserted in every five or six courses

CE-102 Civil Engineering Materials 08/07/21 13:20 75


TO BUILD A
ARCH
Arch Types: Segmental Arch Types: Jack

Arch Types: Semicircular Arch Types: Bullseye


Arch Types: Multicentered
Arch Types: Horseshoe

Arch Types: Venetian


Arch Types: Tudor

Arch Types: Triangular

Arch Types: Gothic