2, when the pre-cast pre-fabricated at the  FRAME SYSTEM

site and what we use system ? Pre-cast frames can be constructed using

 Pre-cast system can be divided into the either linear elements or spatial beam-
following categories . colunm sub-assemblages.
there are:- large-panel system SLAB-COLUMN SYSTEM WITH SHEAR

- frame system WALL

- slab-column system with  these systems rely on shear wallsto


shear wall sustian lateral load effects, whereas the
slab-column structure resists mainly laod.
- mixed system
 These are two main systems in this
 LARGE-PANEL SYSTEM
category
 these panels is from a Box-Like structure .
there are :- lift-slab system with walls
 use for large wall and floor concrete
- prestressed slab-column
panels connected in the vertical and
system
horizontal directions .

depending on wall layout , there are  MIXED SYSTEM



three(3) configurations of large-panel  a pre-cast may include a combinatoin of
building. any of the above systems even have some
parts of cast –in-place members.
there are :- cross-wall system
3, why pre-cast is low cost house in america ?
- longitudinal wall system
May be in ethiopia what we call ?
- two-way system
• They were prepared and beuilt by
advanced technologies which need less
time & man-power

Set,by,fahad
Set,by,fahad A
A
1, what is the difference between pre-cast
concrete with out site and at site concrete cast ?
 We can see theirs different depending on the advantage and
disadvantage .

pre-cast
ADVANTAGES DISADVANTAGES
 The concrete of superios quality is  If not properly handled, the pre-cast
produced as it is possible to have better units may be damaged during
transport.
technical control on the production of  It becomes difficult to produce
concrete in factory. satisfactory connectoins between the
pre-cast members.
 It is not necessary to provide joints in  It is necessary to arrange for special
the precast construction. equipment for lifting and moving of
the pre-cast units.
 the labour required in the  The economy achieved in pre-cast
manufacturing process of the pre-cast constructoin is partially balanced by
the amount to spent in transport and
unitcon easily be trained.
handling of pre-cast members. It
 The pre-cast articles may be given the become therefore necessary to locate
desired shape and finish with accuracy. the pre-cast factory atsuch a place
that transport and handling charges
 The work can be completed in a short are brought down to the minimum
time, when pre-cast units are adopted. possible extent.

 When pre-cast structures are to be

Site cast /in-situ concrete


installed, it is evident that the amount of
scaffolding and formwork is

ADVANTAGES
conciderably reduced.
DISADVANTAGES
 It embraces various building shapes.  Needs high labour number and plant on
 It can be assumed to bemore or less site.
monolithic.  Erectoin of formwork is time
 It is not necessary to pay for crane on consuming
site.  The quality control is difficult
 Constructoin can proceed independently  Once the concrete has been cast it is to
of weather conditions. difficult to do any modificatoins.
 Better working conditoins for the builing  Weather can create problems for
operatives. curing, and forSet,by,fahad
constructoin itself.
Set,by,fahad A
A
Erectin and interconnecting them to
CONSTRUCTION MANAGMENT

NAME :- fahad ahmed


ASSIGNMENT :- Erect
Precast Concrete
Structure And Cladind

CLASSS :- room 1
YEAR :-2019

Set,by,fahad
Set,by,fahad A
A