BTS Reserves
BTS Installation
Installation
Base Frame/ Cabinet Mounting Major
L-Angle
Leveling of BTS Cabinet Major
Alarm
Alarm Name Boolean Number
ID
65033 AC1 1
65034 AC2 2
65045 Main Power Failure 13-14-15-16
65049 Water 17
65050 Temp 18
65051 Smoke 19
65052 Door 20
65056 Humidity 24
DC Cable Installation
With Lugs And Shrinks Critical
Terminals to be
installed in All DC
cables connection
with DC input (need
clear photos)
Ethernet Cable Installation Major
AC Cable Installation With
Terminals Major
10 cm
earth and alarm cables as shown on the shelter
wall using plastic clips.
3. Spacing between the plastic clips is 10 cm
between each other.
m
4c
4. Install power and earth cables at left side .
5. Install E1 , fiber and alarm cables at right side.
6. Make sure that all cables are in good
arrangement and avoid any crossing.
Separation of Power and
Signal Cables Major
Jumper installed in u shape over
ladder
1. Jumper installed in u shape over ladder.
2. E1 & alarm cable installed on the last hole
near shelter wall.
3. Power cables installed on hole (7)& (8) over
ladder.
E1 & alarm cable installed on the
last hole
Macaroni Flexible
• 1.installation
Make sure of cabinet leveling during
by using water leveling.
Water leveling
Grounding of 3G Cabinet Critical
3G Cabinet Is Working On Same As
Three Phase Power Source 2G
BBU & RRU Fixation Major
BBU & RRU Grounding Major