Temporary Shelter Design

Needleweave I Architects
Material & Cost
SN. Material
1. CGI Sheet
2. 20mm dia MS steel Pipe
3. Rebar 12mm dia ( 1 No.s)
4. Rebar 16mm dia ( 1 No.s)
5. Binding Wire
6. Metal Cutting
Total Cost - Rs. 15,000