SUKH CHAYN VALLEY PROJECT- FDL 022

PRESENTED TO:
SIR IMRAN MUGHAL (GM-C)

PRESENTED BY:
M. USMAN ALI (MECHANICAL SITE ENGINEER)
Presentation Outline 2

1. Basic Introduction to Project FDL-022


(a) Project Cost (Mechanical)
(b) Building Structures
(c) Owner Supplied Material

2. Mughals Pakistan: Scope of Work (Mechanical)


(a) Plumbing System
(b) Firefighting System
1. Basic Introduction to Project FDL-022 3

 Project Name: Sukh Chayn Residence Islamabad


 Client: Sukh Chayn
 Location: Islamabad
 Address: Plot No. 6, F-10 Markaz, Islamabad
 Team Leader / Architect: Arshad Shahid Abdullah (Karachi)
 Plumbing & Fire Fighting Consultant: Matrix Consultant, Karachi.
 Civil Contractor: Mughals Pakistan Pvt. Ltd.
 Plumbing & Fire Fighting Contractor: Mughals Pakistan Pvt. Ltd.
 Plumbing & Fire Fighting Sub-Contractor: Fizza Developers Pvt. Ltd.
(a) Project Cost (Mechanical) 4

 Total Plumbing And Fire Fighting Project Cost = PKR 207,672,607/-

 Total Plumbing Cost = PKR 122,879,407/-

 Total Fire Fighting Cost = PKR 84,461,711/-

 Miscellaneous Cost = PKR 331,489/-


(b) Building Structure: 5
 Two Apartment Buildings Jointed with A Connecting Bridge
 Total 14 Floors & Roof
 3-Basements, 9-Floors, 2-Pent House & Top Roof
 3rd To 8th Typical Floors
 Gf Total Apartments = 14 (3 Bed Apt. = 8, 2 Bed Apt. = 6)
 1st Floor Total Apartments = 24 (3 Bed Apt. = 8, 2 Bed Apt. = 8, 1 Bed Apt. = 4)
 2nd Floor Total Apartments = 24 (3 Bed Apt. = 8, 2 Bed Apt. = 12, 1 Bed Apt. = 4)

 3rd To 8th Typical Floor, Each Floor Apartments = 24 (3 Bed Apt. = 8, 2 Bed Apt. = 12 and 1 Bed Apt. = 4 )

 Total Apartments = 222


 9th Floor Total Apartments = 16 (3 Bed Apt. = 8, 2 Bed Apt. = 8)
 Pent House Level 01 Bed Rooms =4
 Pent House Level 02 Bed Rooms =2
(c) Owner Supplied Material (Mechanical): 6

 For Plumbing:
All Plumbing Fixtures (showers/ muslim showers, toilet fittings (WC), washbasin accessories, tee stop cocks, bottle
traps etc.) Automatic Water Level Controller, All Water Pumps (booster pumps, centrifugal pumps, submersible pumps,
chlorine injection pumps etc.).

 For Fire Fighting:


All Pumps, Valves, Fire Hose Cabinet with Reel, Sprinklers, Zcv’s, Fire Extinguishers, Landing Valves
with Cabinet, Breeching Inlet (on GF’s).
2. Mughals Pakistan: Scope of Work (Mechanical) 7

 Target Application Area: Installation of Plumbing & Fire Fighting Works

 Cold Water Supply System


 Hot Water Supply System
 Soil, Waste And Vent Piping System
 Gas Supply System
 Irrigation System
 Fire Fighting System
 Testing & Commissioning
• Cold Water Supply System: 8

 Source of water for whole Project: Tube well in basement 3 = 2 No’s. , city water supply
system and through water tankers.

 Water storage: Underground water tanks in basement 3 = 2 No’s. (Capacity 90,000 UK Gallon &
87,750 UK Gallons respectively), overhead water tank in pent house = 2 No’s.

 2 pump sets (1 duty + 1 stand by) transfers from underground water tank to overhead water tank in Pent
House 01 through 2 separate pipe lines.

 There is total 4 booster pump sets (1+1) which supplies the cold water to 8 th floor, 9th floor, Pent House 01
and Pent House 02 to all apartments, Bath Rooms, Showers, Kitchens, Electrical water heaters and Laundry
(Washing machine).
Continue; 9

 Cold water supply to All Other floors Apartments by gravity form overhead water
tank.

 Each Service Area has Access Panel at Ceiling Level for the future maintenance.

 Every Flat has Individual Gate Valve for Main Incoming Line at Corridors.

 Every Toilet / Kitchen has Individual Gate Valve for maintenance works.

 P.P.R. Pipes has been used for Internal Water Supply System & P.E. Pipes shall be
used for External Network.
• Hot Water Supply System: 10

 Hot water supply to all apartments bath rooms from independent electrical water
heaters
 Electrical water heaters specifications:
 3-Types
 EWH-01 = 10 LITRE = 85 QTY
 EWH-15 = 15 LITRE = 492 QTY
 EWH-01 = 100 LITRE = 06 (for basement 2 & G.F)
• Soil, Waste And Vent Piping System: 11

 Every Service Area have individual Riser Shaft for the Soil, Waste & Vent Pipe.

 All kitchen waste add in sewer main pipe in Ground Floor.

 Soil Stack Line shall move straight to the External Manholes from Basement Level 01 H/L.

 Waste Stack Line shall move into Grey Water Tank at Basement Level 03 and after Treatment, same
resource shall be used for Irrigation.

 In case of Excessive Waste Stack or Overflow; Waste shall move directly to External Manhole
(controlled by BMS, Building Management System).
Continue; 12

 Submersible Pump Set = 5 No’s. for the Rain Water at Basement Level 03.

 Submersible Pump Set = 2 No’s. for the Pump Rooms at Basement Level 03

 Rain Water (only Shaft No. 28) is collected into Rainwater tank, after treatment, it will be used for
Irrigation. (Controlled by BMS). Other Rain Water Outlets (Scupper Drain) sourcing outside, have Free
Discharge to G.F external area.

 uPVC Pipes has been used for Soil, Waste, Vent & Rain Water Drainage System & PVC Class E Pipes for
External Drainage System.
• Gas Supply System: 13

 Main Gas Network is in Basement Level 01 H/L and shall be raised up to all floors.

 Every apartment has separate Gas Meter inside Kitchen.

 Medium Quality Galvanized Iron Pipe shall be used for Gas System.
• Irrigation System: 14

 Irrigation Pump Set of 2 No’s shall be used for transferring treated rain water & waste water for
Irrigation of External Area.
• Fire Fighting System: 15

 Fire Hose Real Cabinet System

 Fire Sprinkler System

 Fire Extinguishers

 Fire Hydrant System (Two Way Pillar Type)

 Dry Riser System Landing Valve With Cabinet


Continue; 16

 Each building have one overhead water tank and 2 pumps VFD Control in the
pent house floor.

 B3 to 9th Floor (all floors covered with Fire Sprinkler system).

 Basement Level 01, 02 & 03 is divided into 5 Zones providing ZCV’s (Zone
Control Valve).

 Basement Level 01, 02 & 03 is fully covered with Upright Type Sprinklers.
Continue; 17

 Each Apartment consists of separate Gate Valve for Fire Line & Access Panel at entrance.

 Pent house level 1 & 2 (all Bed Rooms covered with Side Wall type Fire Sprinkler).

 Dry Type & CO2 Type Fire Extinguishers shall be placed in Corridor’s Area.

 K - Type Fire Extinguishers shall be used in Kitchen Area.

 Auto Dry Powder Ceiling Mounted Fire Extinguisher shall be placed in Electrical Rooms.

 Pendant Type Sprinklers shall be used in Flat’s Entrance Lobby & Passage Way.

 Separate Wet Risers is used for each tower ( 1+1).


Sprinklers, Fire Extinguishers on 1st Floor APT. 18

 3 Bed Apt type A = 3 pendant type, 6 wall mounted type sprinklers, 1 Fire Ext. type K
 3 Bed Apt type B = 4 pendant type, 1 Fire Ext. Type K, 5 wall mounted sprinkler
 2 Bed Apt type C = 3 pendant type only.
 2 Bed Apt type D = 2 pendant type, 4 wall mounted type sprinkler, 1 Fire Ext. type K
 2 Bed Apt type E = 3 wall mounted, 1 Fire Ext. type K.
 1 Bed Apt. type F = 3 wall mounted sprinklers
Continue; 19

 For Main Corridor/ passage = 6 sprinklers (head down) pendant type.


 Total Sprinklers used on Floor 1st Floor (Inc. main passage ways)
= (49 R + 48 L) pendant type & (50 R + 49 L) wall mounted.

 Total Fire Ext. on 1st Floor = 44

 25 (7 Co2 type, 7 Dry chemical type, 1 Dry chemical ceiling mounted type, 10 K
type) + 19 (5 CO2 type, 5 Dry Chemical type, 8 K type, 1 Dry chemical ceiling
mounted type)

• R/L = Right/Left side of jointed building


Continue; 20

 Each floor is divided into 2 Zones providing ZCV Assembly.

 Fire Test Drain Line for complete system is connected to Basement Level 03
Underground Water Tank.

 Each building have 1 dry riser landing valve cabinet with canvas hose pipe in stair
case area.

 Ground Floor (External Area) is covered with 2 Way Pillar Hydrant.


Continue; 21

 2 Breeching inlet for fire department connections.

 2 breeching inlet for dry riser system.

 Black Steel Seamless Fire Pipes is being used (Schedule 40, ASTM A53).
• Testing And Commissioning: 22

 All Plumbing Pumps (Centrifugal Pumps, Submersible Pumps, Booster Pumps, chlorine injector
pumps etc.)

 Fire Fighting VFD Pumps

 Fire Fighting Valves (landing valve, gate valve etc.)

 ZCV’s (Zoom control valves)

 Fire Sprinklers (Dry chemical type, CO2 type, Dry Chemical type, K type, Dry chemical ceiling
mounted type), Breeching inlets, Gas Cocks.
• Miscellaneous Works: 23

 UPVC Pipe Sleeves

 Core Cutting

 Equipment Tagging

 Shop Drawings

 As Built Drawing
Bottlenecks: 24

 Testing and Commissioning of Provided Equipment.

 Water Supply Piping in Walls.

 Every apartment has separate Gas Meter inside Kitchen.

 Soil, Waste and Vent Piping Suspended from Slab.