Check Hardware Installation Quality-MW
Check Hardware Installation Quality-MW
Check Hardware
Installation Quality for
Microwave
www.huawei.com
1 1
X √
Items No Check Point Standard Tool
Height &position comply with design ; Visual
1 Position&label
Frequency & type comply with design; Distance meter
2 pole pole is vertical with ground Plumb
3 bracket All bolts and screws including washing flat should fixed Wrench
antenna
4 side strut Check quantity of bar according to manual , and fix angle range Visual
5 Drain hole The drain hole should downward and the cap is unplugged Visual
6 polarization Polarization comply with design Visual
7 shield Up wide and down narrow Visual
Antenna installation
1. All parameter like position, height, azimuth and polarization must comply with
design, the antenna drain hole is downward, and seal upside’s hole if there it is.
2. the antenna and bracket should fix well, all bolts and screws need to be tighten
with washing flat. There should mount support bar for big size antenna.
3. The surface of antenna is smooth no obvious dent or scratch, and avoid occur
collision during mounting.
3
2
Or tower
1+1/2+0 mode
4 screws should be
fastened.
3
ODU&HYB
1
HYB label
IF Grounding IF wiring
The grounding should have 2 points at IF cable wiring should comply with
least, one is Bottom point of the tower, the design, placed tidily and
the other deployed before entering bending radius should bigger than
shelter, and all connector and grounding 30cm.
must do waterproof.
IF cable redundance
No spare long.
<1.5m.
IF cable temporal
Standby 1 Main 1 Label
1 2 3
Power cables
1
2
Services label
IF label
IDU Label