SAV & MR Process

EO 002.02.4a-b
MTPs

Stage 1
MTP 1 - Explain the importance of a SAV
MTP 2 - Explain the SAV process

Stage 2
MTP 3 – Define Miscellaneous Requirement (MR)
MTP 4 – Explain the MR Process
Aim

To build a better understanding of the SAV process


and aid the SAV team to uncover better ways to
support ops by improving logistics processes
References

A. 1 Cdn Air Div / CANR HQ SAV Checklists

http://winnipeg.mil.ca/cms/en/A4_EME/OrganizationDutie
sTasks/Subjects/StaffAssistanceVisit.aspx

B. http://winnipeg.mil.ca/cms/en/DComd-FG/A4-
Log/A4LogReadiness/Subjects/StaffAssistanceVisit.aspx

C. 1776-2 (A4 Log Rdns), 1 Canadian Air Division Staff


Assistance Visit Report to 17 Wing Logistics Organization
14-18 November 2011. (Digital Doc)
MTP 1 – Explain the importance of a
SAV
 Improving logistical processes:
 A4 Log conducts overall functional assessment of Wg Log and EME
organizations, reviews processes and provides recommendations for
improvement

 Identify best practices:


 SAV program will identify best practices and afford the Wg and opportunity
to showcase what it does exceptionally well

 Raise concerns:
 The SAV will also identify any overlooked safety or security concerns and
make recommendations to rectify immediately
MTP 2 – Explain the SAV Process
 Staff Assistance Visits:
 Occur normally once every two years ($$$ or pers may delay visit);
 Attempts will be made to avoid Unit peak activity periods to alleviate
disruption of Operations;
 A4 LOG will publish its SAV Schedule each year;
 A4 LOG Rdns will contact W Log Org/Unit/Sqn CoC to coord
appropriate timings;
 SAV Team leader appointed by HHQ and normally rank of Maj;
 Normally Units subject to SAVs will be provided with a checklist of all
areas being inspected;
 As soon as practical after the SAV a report will be compiled and
provided to all stakeholders;
 Deficiencies directly impacting customer svc will be documented by
SME; and
 A verbal debrief by SAV Team leader will be provided to CO.
MTP 2 – Explain the SAV Process

Sample 1 CAD SAV Report:


• 17 Wg SAV Letter (Sharepoint Doc)
• 1 CAD SAV report 17Wg (Sharepoint
Doc)
Stage One Review

CC-138 Twin Otter

Stage 1
MTP 1 - Explain the importance level of a SAV
MTP 2 - Explain the SAV process
Lesson Review

Q1. What is the purpose of a SAV

Q2. How often is a SAV conducted?

Q3. What are the two final products resulting


from SAV?
EO 002.02.05

Miscellaneous Requirement Process


Aim

To gain a full understanding of the MR Process and


benefit from this additional funding for projects
and equipment.
References

Sample MR Guidelines:
• Air Command MR Guide(Sharepoint Doc)
• 17Wg MR Guide (Sharepoint Doc)
Stage Two

MTP 3 – Define MR
MTP 4 – Explain the MR Process

CP-140 Aurora
MTP 3 - MR Definition

 A MR project is defined as a Capital (Vote 5)


acquisition intended for:

 The one-time acquisition of new equipment or material


where the total project value does not exceed $5M; or

 The recurring acquisition / ongoing renewal of an


equipment holding, on a one for one replacement
basis, where the individual item value / unit cost does
not exceed $1M and the total project value does not
exceed $5M
MTP 4 – Explain MR Process

 RCAF Comd call letter is initiated in Mar/Apr


requesting Wings/Units to raise their MRs
 Each Wing/Unit will assign an MR Coord who
compiles and vets the requests for accuracy and
completeness
 Coordinator will seek approval of prioritized list from
WComd
 Submissions are entered into the General MR
SharePoint site
MTP 4 – Explain MR Process
 Wg/Unit RM Coord Step-by-Step Instr:
Step 1: Dist the MR Call Ltr at the Wing/Unit lvl
Step 2: Collect MR submissions from the Unit/Wing
Step 3: Review each submission to ensure it qualifies
Step 4: Make sure the required forms have been completed
accurately
Step 5: Review and validate prioritization forms at Wing/Unit lvl
and adjust the score as necessary to ensure consistency in
the Wing MR submission
Step 6: Obtain WComd endorsement of the Wing/Unit MR list
Step 7: Upload the Wing/Unit synopsis sheet and the individual
MR submissions to the General MR SharePoint site before
the deadline
MTP 4 – Explain MR Process
 MR Originator/OPI step-by-step instructions:
Step 1: Complete the MR Request Form:
Step 2: Complete the Itemized Cost Breakdown Chart;
Step 3: Complete the Prioritized Form: and
Step 4: Send the MR request to your Wing/Unit MR Coord.

Note: Do not complete the validation form – for SMEs only


MTP 4 – Explain MR Process
 Key considerations:
 when the call ltr is received, the CO should go over the key points
within the yearly MR guideline and instruction, with Unit Admin O and
Wg Business Mgr (or both);
 Funding will arrive in the 4th quarter of the FY the submission was
initiated;
 Item has to be procured prior to end of that FY 31 Mar XX;
 MR is meant for one-time procurement of capital items;
 Normally large items are procured, but small item requests should not
be discouraged;
 Items such as vehicles (plated), IT equip & Infrastructure or
permanent changes to bldgs are NOT included in this process;
MTP 4 – Explain MR Process
 Key Considerations (cont):
 each MR request requires its own form;
 there are three years provided for costing to allow phasing in multi-
year projects;
 Projects submitted to PWGSC it is recommended that a dollar
amount for translation is included in the MR;
 Cost for travel is only to be included if there is a requirement to pick
up the item or bring someone from the Company to install;
 Typically, unit will be notified of their MR approval in Nov; and
 Units will receive a separate notice that the MR funding is avail.
Stage 2 Review

Q1. When can your Unit expect to receive a MR ‘Call Ltr’


and who initiates?
Q2. Identify 5 of the 7 step-by-step instructions for the
Wing/Unit MR Coord
Q3. Provide examples of items that should not be
purchased with MR funds?
Q4. In your own words, define an MR?