The document reports on a defect in the Malaysia NBL Project from September 17, 2021. Specifically, the defect was that the internal cable tray and cables for connecting the chiller skid were not installed. To rectify this, internal cable trays and conduits were installed at the chiller skid to route internal cables. The cables were then pulled and terminated. This required a site instruction but did not impact cost or schedule as the work was completed. The root cause was that installing these cables and trays was not included in the vendor's original scope of work.
The document reports on a defect in the Malaysia NBL Project from September 17, 2021. Specifically, the defect was that the internal cable tray and cables for connecting the chiller skid were not installed. To rectify this, internal cable trays and conduits were installed at the chiller skid to route internal cables. The cables were then pulled and terminated. This required a site instruction but did not impact cost or schedule as the work was completed. The root cause was that installing these cables and trays was not included in the vendor's original scope of work.
The document reports on a defect in the Malaysia NBL Project from September 17, 2021. Specifically, the defect was that the internal cable tray and cables for connecting the chiller skid were not installed. To rectify this, internal cable trays and conduits were installed at the chiller skid to route internal cables. The cables were then pulled and terminated. This required a site instruction but did not impact cost or schedule as the work was completed. The root cause was that installing these cables and trays was not included in the vendor's original scope of work.
PROJECT “Report for Defect” Malaysia NBL Project, 2021.09.
17
Project Malaysia NBL Project
[Describe in detail how to rectify the defect]
[Summary Of Defect] Defect Connection of internal cable tray and cable for chiller skid Connection of internal cable tray and cable for Chiller skid (Describe in detail how to stop the same defect) Action Installed cable tray and conduit at Chiller skid for making cable
route for internal cables.
[Describe in detail how to check defect] Pulled the internal cables and completed termination. Check Separate into three skids for chiller delivery, requires internal cable tray and cable connection [Cost & Schedule Impact & Catch up Plan] Impact Site Instruction issued for the work.