Ohtsuka Poly-Tech

Phils., Inc.
Agenda

 Patrol Findings May 2018


 Departmental Self-Audit Findings
Seiren
 FINDINGS:
CORRECTIVE ACTION:
 Scattered Zairyo on the floor near the Deren #
Remove the scattered Zairyo and put on residual waste
 OVERALL IN-CHARGE: Khalid PREVENTIVE ACTION: Provide signage to this area
 AREA IN-CHARGE: Rod Manlupig STATUS: DONE
 Issued date: 5.22.2018 DATE OF ACCOMPLISHMENT: 5.25.2018
VERIFIED LAST JUNE 28, 2018
 Due Date: 5.29.2018
CHECKED BY: KHALID
Seiren
 FINDINGS: CORRECTIVE ACTION:
 Fire Extinguisher directly placed on the Floor Fabricate secondary containment for Fire Extinguisher
non compliance on Safety. PREVENTIVE ACTION: Check all areas of Factory 1
 OVERALL IN-CHARGE: Khalid and 2 make additional for fabrication.
 AREA IN-CHARGE: Hardy Serrano Inform all dept. checking on Safety on their Areas.
STATUS: Containment – Done for Factory 1 Factory 2
 Issued date: 5.22.2018 for Fabrication – 15 pcs. (internal fabricator and
 Due Date: 5.29.2018 materials is Metal Pallet) until July 15
DATE OF ACCOMPLISHMENT: not yet complete
CHECKED BY: KHALID
Seiren CM Aircon Room
 FINDINGS: CORRECTIVE ACTION:
 No proper area for cleaning materials Remove the cleaning materials on these area.
PREVENTIVE ACTION: Provide container for
 OVERALL IN-CHARGE: Khalid
cleaning materials
 AREA IN-CHARGE: Roderick Manlupig STATUS: done
 Issued date: 5.22.2018 DATE OF ACCOMPLISHMENT: 5/27
 Due Date: 5.29.2018 CHECKED BY: KHALID
Admin Office
 FINDINGS:
 Delivered Items for purchasing still remains at CORRECTIVE ACTION:
Admin Office and not stored at proper area. Remove the items and stored at Stockroom
 OVERALL IN CHARGE: JENNY DE SOLA PREVENTIVE ACTION: All delivered items must
 AREA IN-CHARGE: Jane Laza claim by the requesting dept. and if not claim within the
day must stored to Stockroom for safety storekeeping.
 Issued date: 5.22.2018 STATUS: Done
 Issued by: Razel A. DATE OF ACCOMPLISHMENT: 5.27.2018
 Due Date: 5.29.2018 CHECKED BY: RAZEL
GENERAL AFFAIRS
BEFORE AFTER
3RD Building Gutter

For Follow-up Repair & Tent Area


Cleaning until July 7, 2018
1. Building 1 Gutter
Replacement (Covering
Procurement, QA, Admin
Office, Conference Room 1
& 2, Presidents Room,
Electrical Room)
GENERAL AFFAIRS
 Schedule of Grass Cutting & Trees Trimming –
6.30.2018
 Preventive Action on Roof Gutter Cleaning &
Checking – monthly checking of gutters by our
contractor
Departmental Self Audit Findings
 QC
 Procurement
 Seikei
5S QC SELF AUDIT AND
IMPROVEMENTS

JUNE 29, 2018


AREA: PACKING
Findings: No identification/visible Corrective/Preventive Action: Put
partition for sticker of box and plastic label that serve as partition to avoid
wrong sticker
Status: Done
Problem might encountered: Wrong Date accomplished: May 21, 2018
sticker/Claim

Overall in-charge: R.de Guzman


Audited by: J. Salimbacod
Issued date: May 20, 2018
AREA: TRAINING ROOM
Findings: No proper location of sample
rejects that intended for Go No Go exam
Corrective /Preventive Action: Put a
Problem might encountered: Time consuming
wrack/cabinet with label for sample rejects
in getting and might encountered item
deformation
Status: Done
Date accomplished: May 3, 2018
Overall in-charge: R.de Guzman/B.Locsin

Audited by: J. Malong/J. Salimbacod


Issued date: April 2, 2018
AREA: PACKING
Findings: No cover for packing working
table during non-operation
Corrective /Preventive Action: Put
Problem might encountered: Dust particles plastic roll cover
and foreign materials might accumulate
Status: Done
Overall in-charge: R.de Guzman/B.Locsin Date accomplished: June 14, 2018

Audited by: R. Racoma

Issued date: June 14, 2018


AREA: FINISHING and
INSPECTION
Findings: No target per hour display
and work standard easy identification
Corrective / Preventive Action: Put
labelled of speed target per hour with
Problem might encountered: Processor
color coding
might not aware of the target per hour
and wrong working standard will be use
Status: Done
Overall in-charge: R.de
Date accomplished: June , 2018
Guzman/B.Locsin

Audited by: Sir Sato and Mam Maya


Issued date: May 2018
5S PROCUREMENT
SELF AUDIT

MAY 2018
Agenda:

1. 5’S Self Audit in Procurement


Area
2. May Self Audit
3. Findings + Corrective Action
5’S Means: Is a Lean Manufacturing tool that improves workplace efficiency and
eliminates waste. Managers and workers achieve greater organization, standardization, and
efficiency—all while reducing costs and boosting productivity.

+ 1’S
AREA : PROCUREMENT
CORRECTIVE ACTION:
1. Immediate cleaning on area.
FINDINGS: Improper segregation of waste out side the
gazebo ( with plastic waste ) 2. Putting notice for everyone’s
awareness on proper cleaning of
OVERALL IN-CHARGE: R . Pasia / Procurement team
this area.
AREA IN-CHARGE: B . Gimutao STATUS: Done
Issued Date: May 19 , 2018 Date Accomplished: : May 19,2018
Due Date: May 19, 2018
CHECKED BY: R.Pasia / Procurement team

With
plastic
waste
AREA : PROCUREMENT
FINDINGS: Employees smoking outside this
allocated Gazebo
CORRECTIVE ACTION:
OVERALL IN-CHARGE: R. Pasia / Procurement Team
1. Immediate call of attention of the smokers on the
restriction of smoking outside Gazebo
AREA IN-CHARGE: B. Gimutao 2. Putting reminder on non allowing of smokers
outside Gazebo.
STATUS: Done
Issued Date: May 19, 2018 Date Accomplished: May 19, 2018
Due Date: May 19, 2018 CHECKED BY R. Pasia / Procurement Team
AREA : PROCUREMENT
FINDINGS:
• Boxes were piled up with no limitation on heights
OVERALL IN-CHARGE: R. Pasia / Procurement Team

AREA IN-CHARGE: A. Gutierrez


Issued Date: 4/16/2018
Due Date: 4/20/2018
AREA : PROCUREMENT
CORRECTIVE ACTION:
1. Providing height limit on every boxes
2. Inclusion of limit height check of boxes on every self audit
STATUS: Done
Date Accomplished: 4/20 /2018
CHECKED BY: R. Pasia / Procurement Team
5S SEIKEI SELF
AUDIT

MAY 2018
AREA : SEIKEI
CORRECTIVE ACTION:
FINDINGS: Dilapidated paint and scratches of forklift 1. Repainting of the forklift truck.
truck used by mold cleaners 2. Provide in-charge person notice
OVERALL IN-CHARGE: J. Bandola (seikei) to the truck to know who’s the
AREA IN-CHARGE: N. Dalipe / W. Cannon authorized person.
Issued Date: May 3, 2018 STATUS: Done
Due Date: May 12, 2018 Date Accomplished: : May 12, 2018

CHECKED BY: J. Bandola (seikei)

BEFORE AFTER
Authorized
person
AREA : SEIKEI PRODUCTION

FINDINGS: No labels for rubber waste container and CORRECTIVE ACTION:


worn out labels for drop materials & product. 1. Put labels to all rubber waste container 1st and 2nd Factory
2. Replacement of worn out and old labels to all drop
OVERALL IN-CHARGE: J. Bandola (seikei) material and product in line.
STATUS: Done
AREA IN-CHARGE: N. Dalipe / W. Cannon
Date Accomplished: May 24, 2018
Issued Date: May 17, 2018
CHECKED BY: J. Bandola (seikei)
Due Date: May 23, 2018

ADD LABELS
REPLACEMENT OF LABELS
AREA : SEIKEI / TECHNICAL

FINDINGS: Molds subject for repair/evaluation was CORRECTIVE ACTION:


place on the floorings (additional space). 1. Provide mold rack as temporary location of molds for
evaluation and repair for technical area (materials from
excess materials from improved rack for big molds).
OVERALL IN-CHARGE: J. Bandola (seikei)
STATUS: Done
AREA IN-CHARGE: R. Criste/O. Quiatzon
Date Accomplished: May 4, 2018
Issued Date: April 25, 2018
CHECKED BY: J. Bandola (seikei)
Due Date: May 2, 2018

BEFORE AFTER
SEIREN
5S SELF PATROL
FINDINGS AND
IMPROVEMENTS

Covered: May 2018


Corrective Action: 
Findings:  Conduct meeting to all operator to stay in their
respective machines. (w/ meeting minutes)
Not visually visible the machine
Preventive Action:
in-charge
Area: Seiren
 Make name plate and holder on machine
Status :Done 5/28/2018 / PIC :Khalid
PIC : Khalid
Findings: Corrective Action: 

Damaged spring rack and with rivets  Pull out damaged spring rack, conduct welding and remove
rivet
rivet temporarily.
temporarily.
which could be attached to material and
prone to ibutsu Preventive Action:

Area: Seiren
 Improve design and put 1X1 stainless steel on the sidings to
that it will be safe to use and no more rivests used.

PIC : Khalid Status : 1 out of 6 spring rack done. Other ongoing fabrication.
Target
Target date:
date: July
July 21,
21, 2018
2018 overall
overall
PIC : Khalid
Fabricator:
Fabricator: Danny,
Danny, Aquino,
Aquino, Ramos
Ramos
END OF PRESENTATION