common and major problem. The main aim of this project is to detect, indicate and protect the 3-phase
3
Dept of EEE, SJBIT
Recent Literature Review
[1] “GSM and microcontroller based three phase fault analysis system” (Author – Anisur Rahman,
EEE Dept. , 2017 )
In this paper, there are two types of faults is denoted Line to line and line to ground fault.
The described system is constructed only for over coming , the stated difficulties that can sense those
faults automatically and will take an immediate action against the created faults.
The project is planned to develop an automatic tripping mechanism for the three phase supply system by
using GSM and microcontroller .
[2] “Fault protection and automatic on and off of the submersible pumps using electric smart control
panel” (Author- Shyam joseph A. ,EEE Dept., 2017)
In this paper analyzing the performance of submersible pumps used in agriculture
The protection provided for under voltage, phase reversal, phase to phase unbalance, locked rotor
protection.
The ongoing motor remote on and off using GSM can be replaced by this new project electric smart
control panel, to give reliable way to control the pump and protect the motor from fault
4
Dept of EEE, SJBIT
OBJECTIVES
The objective of this project is to design a protecting circuit, which will analyze the fault
in the transmission line and provide protection to the submersible motor used in
agriculture.
Protection and control of submersible motor in any one phase failure in transmission line.
The major reasons for phase failure are as fallows
Over heated or loose connection in one phase
Due to unbalance voltage source and phase sequence
Rapid change over in supply
To satisfy this demand by designing the circuit, to detect any one phase failure in the
transmission line after that it generate the voltage for faulted phase, proper working and
protection of 3phase submersible motor from damage will done .
(a) 3 Phase Signal Generator (b) Output Waveform of 3-phase signal generator (c) Model of 3 phase signal generator
(a) Inverting and Non inverting Circuit (b) Output Waveform of Preamplifier circuit (c) Model of inverting Non-inverting circuit
• Here we use LM 4558 IC it has four input pin number 2, 3 and 5, 6 pin number 2 and 6 are
Inverting pin number 3 and 5 are Non-Inverting and Pin number 4 is ground, Pin number 7 is
output, Pin number 8 is +VCC
• A Preamplifier also known as preamp is an electronic amplifier that converts electrical signal
into an output signal
• For sending the power amplifier without the final signal would be noisy or distorted.
• The preamplifier is often placed close to the sensor to reduce the effects of noise and
interference
• The rectifier output is 220 dc voltage is given to the power drive input the power drive gives the
440 volts AC constant voltage.
• If there is any variations in input voltage power drive gives the constant voltage to the motor.
• Variations in the voltage will damage the motor hence we are using power drive it will gives the
constant voltage to the motor and protects from damage.
21
Dept of EEE, SJBIT
RESULT
Input signal is amplified to 3 phase with the help of 3 phase signal generator and DC power
supply
When any one of the phase get faulted this circuit detect and analyze in which phase fault has
occurred, and it generates the voltage for the faulted phase, then it provides continuous 3 phase
voltage to motor.
• In this project we have made easy to monitor the submersible motor for
parameters like phase failure.
•The process we have learned about different components and how it works and
functions accurately. And also learned about different techniques to implement very
well for the use of this project and other purposes.