Check List
Check List
Check List
K LI
E C
C H
I O N T
I S M A
ER V O R
P F
SU
Foundation trench C NC NA
and pit excavation Necessity of Masonry Foundation along
the stated axes
8) The faces of Availability of materials for subsequent
excavation are work
Submittal of work methodology
retained with
Qualification of work men/ operators
sheeting, timbering
Equipment for excavation
strutting and
Submittal of pre excavation elevation
shoring to protect readings
quarry.
Check: -
1)All internal back filling is done with approved
material if possible with material excavated on the
site.
2)All external backfilling around foundation walls
and behind retaining wall shall be done with
approved selected materials, if possible with
material excavated on the site which is capable of
being compacted and form a stable filling.
3)All organic materials, such as pieces of wood,
roots, bushes and black cotton soil are removed
from all backfill material.
Gondar, 8th August 2017, Anmut G
Backfilling
Check: -
4)All ground trenches and places where backfilling
shall be executed are clean from grass, bushes and
pieces of wood.
5)Where pipes and electrical cables are in
connection with the backfilling, the work shall be
executed very carefully, so they do not break or
get damaged.
6)All backfilling to be in layers and compacted to
95% of maximum dry density in accordance with the
standard technical specification.
7)Each layer to be well rammed and consolidated
with the addition of water as necessary to achieve
the required compaction
Gondar, 8th August 2017, Anmut G
Backfilling
Check: -
8)The maximum layer of fill for one time
compaction does not exceed 15cm the specified
thickness in the standard technical specification
depending on the method of compaction.
9)Depression or voids that are created during
trimming of slopes to embankments, cutting
shoulders, ditches etc., are filled with suitable
material and to approved compaction.
10)Any material which after repeated compaction
does not fulfill the requirements is removed and
replaced.
Check: -
Surplus excavated material is removed from the
site to the dumping ground.
Check: -
All ingredients cement, aggregates and water are
of the type and quality specified.
Cement is fresh, not older than six months and is
delivered to the site in the manufacturer’s original
sealed bags.
Cement is stored in a dry and well-ventilated
store, on a wooden floor raised minimum 20cm.
above the ground.
Cement is stocked separately.
for construction.
Check: -
The hollow concrete blocks are free from
laminations, cracks and other defects that would
impair the proper setting, strength or permanence
of the construction.
Check:
Dimensions and types of pipes, tubes valves and
sanitary ware is according to the specification and
drawings.
All pipes and tubes to be installed in the floor are
placed in position.
All joints before mass concrete is cast.
Pipes and tubes are placed in the hard-core with
minimum 10cm covering layer sand or in channels
of floors as indicated on the drawings.
Gondar, 8th August 2017, Anmut G
Cont’d
All sanitary ware is properly fixed in the correct
position.
All connection between sanitary ware and sewer
system is done with the prescribed siphon.
All exposed pipes and tubes are well cleaned and
painted as specified.
All sanitary work complies with the standard
technical specification/drawings.
Check:-
Wall tiles are soaked in clean water before
laying and taken out just before use.
Tiles are bedded with straight joints in cement
and sand (1:3) and grouted in white cement.
The work when completed is cleaned properly
before approval.
Only tiles free from defects are used for the
construction.