reinforced.
• SDCM (Stiffened Deep Cement Mixing) pile
is introducted to mitigate the problems due to
the low flexural resistance, quality control
problem and unexpected failure of DCM pile.
l ao S
CDC
M
QF
DCM DCM
l ao S
• The DCM pile was constructed by jet grouting method empoying a jet
LT G
• The concrete core pile consiosted of 0,18 m and 0,22m square pile.
• The DCM pile has 0,60m diameter.
• The load was applied increasing at 10kN interfal until failure.
• The bearing capacities of the 0,18m2 core pile with 4m and 6m were 256kN
and 300kN. And for the 0,22m2 core pile with 4m and 6m were 275 kN
and 315kN.
• The bearing capacity of DCm pile found to be 200 and 140kN.
The result from full scale pile load tests indicated that both the length and
section area of concrete core pile increased the bearing capacities and
reduced settlement of SDCM piles.
l ao S
used.
• The horizontal load was applied depth at -0,30m at the top of pile with
increasing lateral load until pile failure.
• Maximum lateral load of the 0,18m2 core pile with leght of 3,50m and
5,50m were 33kN and 34,5kN. And for the 0,22m2 core pile with leght of
3,50m and 5,50m were 44,5kN and 45,5kN.
The risult indicated that the lenght of concrete core pile did not affect much
the lateral capacities. Both the lenght and section area were significant
reduction in pile displacement when concrete core pile lenght was
increased from 3,50m to 5,50m. Finallly the lateral bearing capacities of
SDCM pile was found to be higher than the DCM pile.
l ao S
Both axial copression pile load test and lateral pile load test were simulated by
LT G
•TEST RESULT
- Axial compression pile simulation
DCM pile: CDCM obtained from 3D finite element simulation were 300kPa and
200kPa, EDCM were obtained as 60.000kPa (DCM C-1) and 40.000kPa (DCM C-
2).
SCDM pile: corresponding : CDCM and EDCM were 200kPa and 30.000kPa.
- Lateral Load Simulation
CDCM and EDCM were similar to the axial compresion pile.
DCM pile: TDCM 50kPa (DCM C-1) and 25kPa (DCM C-2). Coressponding
value for Tcore and TDCM were 5000kPa and 50kPa.
SDCM pile: maximum mment for the long pile, 0.18m=14kn-m, 0.22m =
20kN-m, 0.26m=32kN-m, 0.30m=47kN-m
l ao S
and CDCM, obtained from 3D finite element simulations were 300kPa and
200kPa.
• Modulus in the DCM pile, EDCM were 60.000kPa (DCM C-1) and 40.000kPa
(DCM C-2).
• for the SDCM, CDCM and EDCM were 200kPa and 30000kPa.
• The ultimate bearing capacity of SDCM pile increased linearly with the
increase length of concrete core pile.