Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 2

994H

May 2011
Light Structures Powertrain Standardized Electrical & Hydraulics
 New platform: accommodates new  Front pump drive integration Attachments  Electro-hydraulic implements
cab, improved field assembly into transmission oil system  Improved service locations for front
 Engine pre-lube
 Trade dress update for active cooling  frame hydraulics
Rear view camera
 Reduced service points  Improved access for repair and rebuild
 Improved stair access angle from  Pull-down shade
 Positive Flow Control (improved fuel
55º to 50º  Reduced components and  HID lights
efficiency)
 Common components with other systems  All new machine electrical system
LWLs (walkway, handrails, steps)

Manufacturing & Field


Assembly
 Remote cab testing
 Improved End of Line test
 Improved kitting structure and
packaging to benefit field Engine & Electronics & Software
Operator Station & Features
assembly and commissioning
 Update to Gen 2 993K-style cab with Installation  A4 transmission ECM
 Tier I 3516B HD  Automatic engine shutdown*
VIMS 3G / Advisor
 No changes until Tier 4F  Delayed engine shutdown**
 Touch pad switches
 Object detection ready***
 Soft detent implement pods
 PCS 3.0
 Auto temperature controls
 Cycle Timer
 Improved seat / ride
 Heated seat / mirrors (attachments)
1
994H

994H Changes

You might also like