IIIE Project
IIIE Project
Plan Actual
Start Date 10.10.2020 10.10.2020
Completion Date 10.07.2021 10.07.2021
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
1
Problem Selection checklist
I can’t solve this by engineering judgment / by knowledge or experience Support is required from
3
available with me & my team members Yes supplier
4 I don’t know cause & don’t know solution (Type 4 problem) Yes
I can collect sufficient data of the problem during project for the problem
5
selected Yes
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
2
Contents
• Team Information
• Step 1a : Problem - Select the Theme
• Step 1b : Problem – Justify the Choice
• Step 2a : Observation - Understand the current situation
• Step 2b : Observation – Redefine the targets
• Step 3 : Analysis
• Step 4 : Actions
• Step 5 : Check
• Step 6 : Standardization
• Step 7 : Conclusion
• Guidelines to user
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
3
Team Information
Indira.g@mindacorpora
1 Team Leader Mr. Indira Engineer MQA – MSIL 8600531378
tion.com
Vijay.wakade@mindato
2 Mentor Mr. Vijay Wakade Manager SQA – MSIL
neridge.com
Innovative
4 Member 2 Mr. Rajiv Rathi Plant Head
Arts
Production Innovative
7 Member 5 Mr. Sanjay Jha
Incharge Arts
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
4
Step1a - Problem – Select the Theme
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
5
Step1b – Problem - Justify the Choice
Monthwise PPM at MSIL for all Pointers Monthwise Complaints at MSIL for all
10 Pointers
1000 882
800 8 7
Occurances
600 6 5 5
PPM
4
400 4 3 3
200 79 124 2
73 32 45
0 0
Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20
Month Month
Inference: There is frequent rejection monthly but suddenly quantity increased in May 2020
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
6
Step1b – Problem - Justify the Choice
1b.2 – Defect wise Pareto Analysis - Child parts in Thar Cluster Assy Apr 2020
to Sept 2020
Inference: From above pareto, Pointer Cap came out is a top defect. Hence selected for project
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
7
Step1b – Problem – Justify the Choice
Good Part - Cap is Sealed with Bad part - Cap is came out
Leaf pointer from Leaf
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
8
Step1b – Problem – Justify the Choice
1b.6 - Process stages where the problem is inspected current in the shop
Visual Inspection
1b.7 - Last manufacturing process stage where technically the problem can get generated
Heat Sealing of Cap and Pointer leaf
1b.8 - Response :
At pointer pressing station
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
9
Step1b – Problem – Justify the Choice
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
10
Step1b – Problem – Justify the Choice
3. Analysis
4. Action
5. Check
6.
Standardization
7. Conclusion
Plan
Actual
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
11
Step 2a – Observation – Understand the current Situation
Pick the Leaf Pointer Pick the Pointer Cap & Put the Assy on Heat
Fix the Cap with Leaf
Pointer weight Sealing Fixture
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
12
Step 2a – Observation – Understand the current Situation
2a.3 - 4M condition Verification – Thar Pointer Heat Sealing process
4M Control Items Current
Specification Actual Value
Condition (Managing Points) Status
Skill matrix should available each Skill matrix verify every operator there
New Operator OK
operator is no concern
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
14
Step 2b – Observation – Redefine the Target
Redefine the target set in Step 1a based on the experience gained during
observation step ( 2a).
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
15
Step 3. Analysis
3.1 - Identify possible causes:
( Brain storming Points)
1. Pointer leaf hole Block
2. Pointer leaf ID undersized 7.mm
3. Flashes in Pointer leaf at ID
4. Pointer Cap lug damage / Missing
5. Raw material of Cap is degraded
6. Pointer leaf and Cap CD is mismatched
7. Heat Sealing Temp is less
8. Heat sealing pressure is less
9. Heat sealing time is less
10. Push button connection loose
11. Loose fitment of wires in machine.
12. Heater not working
13. Sensor not working
14. Push button not working
15. Operator skill insufficient.
16. SOP not followed.
17. Non availability of closed Rejection
18. Raw Material NG.
19. Air Leakage from Pipe
20. Wrong part selection (Cap and Leaf)
21. Work sequence not defined
22. Unavailability of valid SOP
23. Operator is having difficulty for perform the operation
24. Defective parts kept in ok bin by operator in routine cycles
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
16
Step 3. Analysis
3.2- Identify possible causes:
(Cause & Effect Diagram for the Possible Causes)
Method Material
Work sequence is not Raw material of Cap Pointer Cap lug damage or missing
Unavailability of is degraded
defined
Valid SOP
Pointer
PointerCap
Cap
Came out
Came out
Heat Sealing temp is less
Push button connection loose
Heat Sealing pressure is less
SOP not followed Loose fitment of wires in machine
Heat sealing time is less
Temp Heaters are not working
Air Leakage from Pipe
Operator skill level
insufficient Temp Sensor not working
Push button not working
Man Machine
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
17
Step 3. Analysis
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
18
Step 3. Analysis
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
19
Step 3. Analysis
Push button Push button checked and not found any loose Hypothesis
8
connection loose connection – JH checklist reviewed Invalid
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
20
Step 3. Analysis
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
21
Step 3. Analysis
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
22
Step 4. ACTIONS
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
23
Step 4. ACTIONS
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
24
Step 4. ACTIONS
Single Push button on top of the work table Two Push buttons implemented
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
25
Step 4. ACTIONS
Before After
NO PLC Control for heat Sealing Machine having auto controls for NG sealing
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
26
5. Check
Month wise bar graph (before and after project) and target
Month wise PPM – Pointer cap came out at MSIL
1000 882
800 Before Project During Project After Project
600
PPM
400
200 79 73 124
32 45 6 0 13 0 16 7 0 0 0
0
Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Month
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
27
Check
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
28
6. Standardization
6.2 Training:
1)Training provided to all operators regarding actions implemented in
Heat Sealing process as well as how to check heat sealing during final
inspection
6.2 Additional Audit / Check
All actions to be verified through regular supplier process audit as per the
plan.
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
29
6. Standardization
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
30
6. Standardization
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
31
7. Conclusion
There are 6 Heat sealing machines and actions has been implemented at
all machines
Build TQM competence | Application orientation | Spread TQM | Build team culture | Quality a way of life
32
Check
THANK YOU