OBJECTIVES:
 To acquaint with the working flowchart of a planning, design and execution of work.

 To bridge the gap between academic knowledge and the Industrial procedures of the
Building design and planning.

 To familiarized with the processes involved in executing the planned and designed work .

 To understand the Assumptions and Approximations adopted in practice while dealing with
Live Engineering Issues.

3
ABOUT THE ORGANISATION.
Services provided by the company:
 Structural Analysis & Design.
 Water retaining structures. RAL
 Machine foundation design. CONSTRUCTIONS.
 Restoration & rehabilitation of Buildings.
 Proof checking and Advisory Buildings. Bannerghatta Road,
Bangalore-577603
 Pre-Engineered Buildings.
 Construction Detailing and Drawings.
 Concrete structures and block works.
 VDF flooring.

4
PROJECT DESCRIPTION:

TITLE OF THE PROJECT: THE M S PG ACCOMODATION


BUILDING.

LOCATION: MAHADEVPURA , BANGALORE


KARNATAKA.

STRUCTURAL CONSULTANTS: RADINS ENGINEERING


SERVICES.

NO OF STOREYS: GROUND+4

5
FLOOR PLAN:

6
EAST AND NORTH ELEVATIONS:

9
WEST AND SOUTH ELEVATIONS:

8
TASK PERFORMED DURING THE INTERNSHIP:

 A thorough study of IS codes and tests on concrete.


 Manual Analysis and Design of Structural Elements.
 Observation of bar bending process and methods of laying form work.
 Study of Architectural Drawing.
 Drafting and Study of Structural Detailing Drawing.
 Observation of procedure of VDF flooring.
 Quantity calculation and Estimation.
 Checking of reinforcement layout as per structural detailing plan.

10
VDF FLOORING.
 A System for laying high quality concrete floors with superior
cost-effectiveness.
 The key to use of this method is the dewatering of concrete by
vacuum process.
 Surplus water from the concrete is removed immediately after
placing and vibration, reducing the water cement ratio to an
optimum level.
PROCEDURE OF VDF:
CONCLUSION.
On the whole, I have gained new knowledge, skills and met many new people. After completing my Internship
training, I had better understanding of team work. This helped me to sharpen my skills.

This Internship helped me to understand the work ethics , communication and sharing ideas and also help to
build a good communication skills with workers and team mates.

This program helps to develop ideas and skills in the application of theory to practice work situation .It build
strength , teamwork spirit and self confidence.