All Weather Terminals: Centro Paula Souza

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 12

All Weather terminals

Centro Paula Souza


Felipe Pereira
Milena Ribeiro
Port Management , 6º cicle, Night
English
Dr. Rosangela Molento Ferreira
All Weather terminals

An all-weather terminal allows handling of moisture and weather-sensitive


products irrespective of meteorological conditions. This innovative concept
reduces the risk of damage to the cargo of coastal vessels and river barges
transporting such goods. It also creates a safer operational environment.

The first such covered terminal was built in the Netherlands (1998) without
external financial support, as the project was deemed too risky. For the
stevedoring company concerned, it generated growth in the volume of weather-
sensitive cargo handled.

Encouraged by the positive reaction of shippers, the company constructed a second


facility in 2002, this time with backing from financial institutions. This innovative
concept generates an increased flow of breakbulk cargo, generating value added
services and transit in a multi-purpose port.
All Weather terminals
Netherlands
Exercise

The first and second all weather terminal were built, respectively, ,where and what
year ?

A Netherlands 1998 e 2002

B Kingdom of the Netherlands 1998 e 2002

C Belgium 1998 e 2002

Italy 1999 e 2001


D
Exercise

TRUE OR FALSE (T OR F)

An all-weather terminal allows insecurity in handling


F of moisture and weather-sensitive products

The first all weather terminal was built with


F external financial support

An all-weather terminal reduces the risk of


T damage to the cargo of coastal vessels

An all-weather terminal creates unsafer operational


F environment
Extra Information

Spain – Marin Terminal


Extra Information
Extra Information

Finland - Kokkola
Extra Information
Extra Information

The all–weather terminal in Ghent, that was opened in october 2020, it


has a storage capacity of 60,000 tons. It is 240m long and 60m wide and
fitted with two tracks alongside the quay. Three fully automated travelling
cranes are installed in the shed. The roofed quay wall is 200m long and the
dock is 25m wide. Vessels of up to 10,000dwt can be dispatched at the
new terminal.
Video
THANKS

You might also like