Lean Six Sigma

Fundamentals
ISEE – 582 / 682
Project Template
Team Members
| 2

Team Project Submissions


 Project Charter (15 pts)
 Define Phase (16 pts)
 Measure Phase (16 pts)
 Analyze Phase (16 pts)
 Improve Phase (16 pts)
 Control Phase (16 pts)
 Total Project including a 1-page Abstract / Executive Summary as a
PDF document (5 pts)
Note 1: Every phase needs to include a minimum of 3 deliverables from “Deliverables” sheets.
Note 2: Each group should submit 3 separate documents:
1. one-page abstract (PDF) | 2. Project Charter (PDF) | 3. Presentation (PPTX)
| 3

Project Charter (15 pts)


 Include a summary of project charter at the beginning of your presentation
(~3 slides) covering the following 6 sections (10 pts). Also, submit the completed
Project Charter (available in word format in MyCourses, tab of PROJECT). (5 pts)
 Problem Statement:
• A high-level statement defining and quantifying the problem
 Project Objective:
• A brief statement identifying project goals
 Project Scope:
• The boundaries (start / end) of the process that is associated with the
project
| 4

Project Charter
 Response Variable:
• Output with units and measurement source
 Defect Definition:
• Defined with respect to response variable
 Quantification of Problem:
• Conditions: Attributes negatively impacting response variable
• Extent: Quantitative measures of effect
• Performance: Execution relative to business need
• Time Frame: Time period of data set that is being study
• Specifications: Customer CTQ, specifications or expectations
| 5

DEFINE – Slide 1 (4pts) DEFINE

 Identify the 3 tools chosen. Explain how/why did you


choose them.
| 6

DEFINE – Slide 2 (4pts) DEFINE

 Show tool 1 and results


 What is take away
| 7

DEFINE – Slide 3 (4pts) DEFINE

 Show tool 2 and results


 What is take away
| 8

Tool 3: Cause and Effect DEFINE

 Spending more than the monthly budget.


Food Entertainment

Excessive
Spending
| 9

MEASURE – Slide 1 (4pts) MEASURE

 Identify the 3 tools chosen. Explain how/why did you


choose them.
| 10

MEASURE – Slide 2 (4pts) MEASURE

 Show tool 1 and results


 What is take away
| 11

MEASURE – Slide 3 (4pts) MEASURE

 Show tool 2 and results


 What is take away
| 12

MEASURE – Slide 4 (4pts) MEASURE

 Show tool 3 and results


 What is take away
| 13

ANALYZE – Slide 1 (4pts) ANALYZE

 Identify the 3 tools chosen. Explain how/why did you


choose them.
| 14

ANALYZE – Slide 2 (4pts) ANALYZE

 Show tool 1 and results


 What is take away
| 15

ANALYZE – Slide 3 (4pts) ANALYZE

 Show tool 2 and results


 What is take away
| 16

ANALYZE – Slide 4 (4pts) ANALYZE

 Show tool 3 and results


 What is take away
| 17

IMPROVE – Slide 1 (4pts) IMPROVE

 Identify the 3 tools chosen. Explain how/why did you


choose them.
| 18

IMPROVE – Slide 2 (4pts) IMPROVE

 Show tool 1 and results


 What is take away
| 19

IMPROVE – Slide 3 (4pts) IMPROVE

 Show tool 2 and results


 What is take away
| 20

IMPROVE – Slide 4 (4pts) IMPROVE

 Show tool 3 and results


 What is take away
| 21

CONTROL – Slide 1 (4pts) CONTROL

 Identify the 3 tools chosen. Explain how/why did you


choose them.
| 22

CONTROL – Slide 2 (4pts) CONTROL

 Show tool 1 and results


 What is take away
| 23

CONTROL – Slide 3 (4pts) CONTROL

 Show tool 2 and results


 What is take away
| 24

CONTROL – Slide 4 (4pts) CONTROL

 Show tool 3 and results


 What is take away
Definition and Deliverable Slides
For Reference only
| 26

Define
Define Problem
Problem
• Quantitative problem statement

DEFINE • Time frame of variation


• Impact to business
• Cost of Poor Quality estimate
• Defect

Identify Customer

• Internal or External
f ect /
e
e r, d Q Identify Cost to Quality

s t om d CT • Voice of Customer
u
t i fy c ns an • Process not meeting CTQ
n o
Ide ariati
• Defect and/or variations
v
High Level Process Map

• Current process “as is”

Scope Project

• Target defect / variation reduction


• Financial benefit goal
• Narrow scope
• Team members
• Project definition
| 27

Define Deliverables
 Team identified  Project charter
 Customer identified  Pareto of defects (if available)
 CTQ identified  Voice of customer identified
 Problem statement completed  Defect to be reduced
 Project scope  Process impacting CTQ
 Review project objective with team  High level process map
 Review project objective with  Project plan
process owner  Any red flags
 DPMO (baseline and target)  Next steps
 COPQ estimate
| 28

Detail Process Map


• Process inputs / outputs

Measure • True process flow

Rolled Throughput Yield

• Opportunities for improvement


• Hidden factory

t put
d ou h a Data Collection Plan
n
t a tablis
p u • Correct data and sample size to be collected

t i fy in nd es
n a e
Ide bles selin
Measurement System Analysis
ia ba
var • Can it detect variation and see improvements

Collect Data

Graphical Analysis

• FMEA, Fishbone, etc

Baseline Analysis

• Cp, Cpk, DPMO, Sigma score


| 29

Measure Deliverables
 Rolled Throughput Yield calculated  Measure system analysis
 DPMO score calculated completed, issues identified.
 Detailed process map or value  Data collection plan completed
stream map  Process performance baseline
 VOC identified and completed  Preliminary graphical analysis of
 Process characterized data
 Basic control charts  Project plan tracked and updated
 COPQ – refined  Any red flags with project or scope
 C&E Diagram, FMEA  Next steps
| 30

Multi-vari Studies
Analyze • Identifies variables needing further analysis

nd Analytical Tools
ut a
y inp es,
f y ke riabl ship, • Trends and behaviors
nti va on
Ide tput relati s if
• Graphical analysis

ou tand mine nt
d e rs eter nifica
un and d l sig Correlation and Regression
ti s tica
sta • If know “X”, predict “Y”

Hypothesis Testing

• Attribute data (Proportions, Chi Square)


• Variable data (Means, Standard Deviation, ANOVA)
| 31

Analyze Deliverables
 Revised problem statement if  Correlation and regression
necessary  Hypothesis statement(s), null
 Revised detailed process map if hypothesis and alternative
necessary hypothesis
 Sources of variation quantified and  Minitab hypothesis test output, p
prioritized value and interpretation
 Display data to identify and verify  Project management update
the “vital few” factors  Any red flags with project and
 Sampling plan scope
 Graphical analysis and  Next Steps
interpretation of data
| 32

Improve Design of Experiments

• Best combination of inputs and outputs to meet or exceed


dates the CTQ.
i
d val ing
s an erat
tif i e op s
n m
Ide ptimu dition
o con Validate Improvement

• Pilot test improvement


• Ensure optimum inputs results in desired outputs
| 33

Improve Deliverables
 FMEA  Cost / benefit analysis of proposed
 Display data to identify and verify Alternative solution(s)
the “critical” factors (KPIVs)  Validate improvements
 DOE or regression sampling plan  Project management update
 Graphical analysis and  Any red flags with project and
interpretation scope
 Detailed process map of optimum  Next Steps
process
| 34

Statistical Process Control (SPC)


• Monitors process improvement

Control
• Attribute Data (U and P charts)
• Variables Data (I-MR chart, Xbar-R chart)

Control Plan
• Parameters of Operation
• Responsibility
• Actions and Preventative Maintenance

tains Reaction
Reaction Plan
Plan

m ain nts
nd veme
• When to react and actions to take
a • Who can take action

n i tors impro
Mo cess Long Term Measurement System Analysis Plan

pro • Data collection and review

Training
Training
• Standard Operating Procedures

Change
Change Control
Control
• Procedures for approving changes

Sustain
Sustain Expectations
Expectations
• Management commitment to control strategy.
| 35

Control Deliverables
 Detailed process map or value  Reaction plan
stream map of recommended  Change control in place
process  Long term MSA and capability
 Completed and approved control analysis
plan  Cost / benefit analysis of new
 Control charts verifying process is process
in control.  Completed project management
 Project is documented report
 Training schedule  Any red flags with project or
implementation
 Audit plan
 Next Steps identified
 Team recognition