May Review

Yogesh

Costing & Design


Quotation
Activity Total Enquiry Total Technical Pending Pending - Appr
Offers
prepared

Costing 23 Enquiries 23 offers 0 Enquiries 2-3 offers


/Estimate(offers)
Factory Costing 2 ongoing projects R.M Estimate
(R.M Estimate) of 2 projects
Total 23 enquiries + 2 25 (offers + 0 Enquiries 2-3 offers
R.M Estimate for R.M estimate)
ongoing project completed

Note: While Preparing offers we need to do costing based on raw material and labour cost,
review all technical details like MOC selection , service conditions , design etc as per client
enquiry . Also commercial terms like delivery , payment etc are one of the important factor
. This is a complete process for converting an enquiry into offer.
Completed Offers Record Per Week
 

Name Yogesh phalke          


Designation Design & Estimation          
Empolyee Code 131          
Dates count   03.05.2021 to 08.05.2021      
End of week Report

SR Name of the Client Work Executed Items Job No Alloted on Completed on Remark
Preparation of commercial and
1 Rubamin technical offer of mixer settler 10-13 Flat and dome 277 03-05-2021 04-05-2021 High Potential
cover shaped covers

2 Badrivishal Preparation of commercial and 1 No Reactor 280 03-05-2021 04-05-2021 Critical MOC Selection
technical offer of reactor
3 Safal Group Preparation of commercial and 15 Kl VCFD 281 03-05-2021 06-05-2021 -
technical offer of tanks
Preparation of commercial and 1 Set of scrubbing Blower offer is
4 Amofil Chemicals technical offer of scrubber and system 282 03-05-2021 06-05-2021 pending,discharge of blower
Blower 5500 CFM,guidance required
Preparation of commercial and
5 Thermax Piping technical offer of pipes and all pipes and fittings 284 05-05-2021 06-05-2021 High Potential
fittings
6 Praj Industries Preparation of commercial and 72 KL Slant bottom 285 06-05-2021 07-05-2021 High Potential
technical offer of Tanks Tank

Preparation of commercial and


7 Thermax Piping technical offer of pipes and all pipes and fittings 288 08-05-2021 08-05-2021 High Potential
fittings
Extra Activities done if any :-
1)Design for 15 Kl tank (Safal Group offer no.281).
Completed Offers Record Per Week
 

Name Yogesh phalke          


Designation Design & Estimation          
Empolyee Code 131          
Dates count   10.05.2021 to 15.05.2021      
End of week Report

SR Name of the Client Work Executed Items Job No Alloted on Completed on Remark
Preparation of commercial and
1 Suez Water technical offer of tanks tanks 286 10-05-2021 11-05-2021  

2 ISGEC Preparation of commercial and Piping 287 10-05-2021 11-05-2021  


technical offer of piping

3 Tata Steel Preparation of commercial and Tank 289 11-05-2021 12-05-2021  


technical offer of tanks

4 Thermax Piping Preparation of commercial and Piping 288 12-05-2021 13-05-2021  


technical offer of piping
Preparation of commercial and
5 XYZ Piping technical offer of pipes and all pipes and fittings 290 13-05-2021 14-05-2021  
fittings

6 TGV Preparation of commercial and Tank 292 13-05-2021 14-05-2021  


technical offer of Tanks
Preparation of commercial and
7 ISGEC technical offer of pipes and Tank 293 14-05-2021 15-05-2021  
fittings
Extra Activities done if any :-
1)Design for Blower for 2000@300to 800,2500@300to 800,3000@300to 800,3500@300to 800,4000@300 to
800,4500@300 to 800.
Completed Offers Record Per Week
 

Name Yogesh phalke          

Designation Design & Estimation          

Empolyee Code 131          

Dates count   17.05.2021 to 22.05.2021      


End of week Report

SR Name of the Client Work Executed Items Job No Alloted on Completed on Remark
Preparation of commercial and
technical offer of piping
1 TGV Piping 294 18-05-2021 19-05-2021  

2 Sterlite Piping 295 18-05-2021 19-05-2021  


Preparation of commercial and
technical offer of piping

3 Thermax Tanks 296 20-05-2021 21-05-2021  


Preparation of commercial and
technical offer of tanks

4 Ravi Dyeware Tanks & Reactors 167 20-05-2021 21-05-2021  


Revision of commercial and
technical offer of reactors
Extra Activities done if any :-
Coordination with Mr.Parimal Gole for understanding the design of blower and detail study about basic
mechanisms of blower & implementation of same in blower design software.
Completed Offers Record Per Week
 

Name Yogesh phalke          

Designation Design & Estimation          

Empolyee Code 131          

Dates count   24.05.2021 to 29.05.2021      


End of week Report

SR Name of the Client Work Executed Items Job No Alloted on Completed on Remark
Preparation of commercial and
1 DMCC technical offer of tanks and Tanks & Scrubbers 297 20-05-2021 24-05-2021  
scrubbers

2 Thermax checking of commercial and tanks 296 25-05-2021 25-05-2021  


technical offer of Tanks

3 Shyamal Chemicals Preparation of commercial and Tanks 302 25-05-2021 25-05-2021  


technical offer of tanks

4 Mazda Revision of commercial and Reactors 301 26-05-2021 26-05-2021  


technical offer of Reactor

5 Eurogear Preparation of commercial and Tanks 303 27-05-2021 28-05-2021  


technical offer of tanks
Extra Activities done if any :-
Revision of Blower Designs using backward curved impeller blades ..
Design
Product Design Target - Hours Actual
1)Design Of 15 Kl Tank (Safal Group) 3 Hrs 3 Hrs

2) Design Of 72 Kl Tank(Praj Industries) 3 Hrs 3 Hrs

3)Blower Design for different types of service


conditions like 2000@300,2000@500,2000@800 8Hrs 8Hrs
etc Up to 4500 M3/Hr
4) Coordination with Mr.Parimal Gole for 8 Hrs 8 HRS
understanding the design of blower and detail
study about basic mechanisms of blower &
implementation of same in blower design
software.

5)Revision of Blower Designs using backward 8 Hrs 8 Hrs


curved blades.
Key Learnings

1) Design of tank using different types of resins because of their varying properties like
specific gravity and heat distortion temperature.

2) Coordination with Mr. Parimal Gole for understanding the design of blower and detail
study about basic mechanisms of blower & implementation of same in blower design
software . For example what is the static efficiency and total efficiency of blower.

3) What are coupled Blowers , mainly couplings are used for reducing the transmission of
vibrations from driving component (motor) to driver component (blower impeller).
Support Required

1) I need a updated price lists for resin prices in Rs/kg.

2) Also many times while preparing offer of VCFF type of tank means flat faced and flat
bolted top Dia of tanks are like 1200,1500 etc all this are non standard gaskets but we
have the price list of gaskets only up to 600 mm, so we need to update and to
standardise the price list for this non standard gaskets mainly used in top Cover.

3) Also we need to standardise the price list for wooden saddles depending on diameters of
the tank.

4) I need drawings of all types of Reactor supports for detail study.

5) We need to standardise the price list for sight glass and light glass and all MS structures
used in reactors.
FAQ - Research Answer

1. What is the purpose behind using Slant Bottom in large capacity storage Tanks ?

Ans. Tanks with Slant bottom are also known as Cone Tanks Generally with 15°
slope, Mainly Flat Bottom and Slant Bottom are used to store liquids like water,
liquid fertilizer , liquid feed , salt brine and other liquids and chemicals. However,
some of these liquids are heavy (with higher specific gravity and can put lot of
stress on the tank ). Main Advantage of Cone Tank is that 100 % Drainage of stored
liquid can be achieved.

2. What is the Difference between Top Manhole and Side Manhole

Ans. Generally Top Manholes are subjected to low load as compared to side
manhole because side manholes are mounted on the shell of the tank where
there is adequate load acting on it due to liquid height as compared to top
manhole which is mounted on the roof of the tank , so the thickness of top
manhole should be lower as compared to side manhole which will have some cost
implication.