The New Clark City is a track and field stadium located in Tarlac,

Philippines and will be the host to the closing ceremony of the


2019 Southeast Asian Games as well as the opening and closing
ceremony of the ASEAN Para Games. What is its group and its
recommended professional fee(RPF) for DAEDS based on the SPP
202 Regular Design Services if the Project Construction Cost is 4
billion?
a. Group 2 / Php 28,500,000 plus 1% of excess of Php 1 billion
b. Group 5 / 7.5% of PCC
c. Group 3 / Php 38,500,000 plus 2% of excess of Php 1 billion
d. Group 3/ Php 23,100,000 plus 1.2% excess of Php 1 billion
The Professional Architectural Works
under SPP 202 Regular Design Services

Group 2 Buildings of Moderate Group 3 Buildings of Exceptional Group 5 Monumental buildings


Complexity of Design Character and Complexity of Design and other facilities
Which of the following best exemplifies the description of a
Consulting Architect?
a. The architect preparing the Plans, Specifications and Contract
documents for a Heritage Conservation Project
b. An architect was asked to determine how the Heritage Building could
be conserved.
c. An Architect was commissioned to supervise the conservation
construction on site
d. B and C
Republic Act No. 9266 (The Architecture Act
of 2004)
• "Architect-of-record" means the
architect registered and licensed
under this Act, who is directly and
professionally responsible for the
total design of the project for the
client and who shall assume the
civil liability for the plans,
specifications and contract
documents he/she has signed and
sealed;
Republic Act No. 9266 (The Architecture Act
of 2004)
• "Architecture-in-charge of
construction" means an
architect registered and licensed
under this Act, who is directly
and professionally responsible
and liable for the construction
supervision of the project;
Republic Act No. 9266 (The Architecture Act
of 2004)
• "Consulting Architect" means the
architect registered and licensed or
permitted to practice under this
Act, who is professionally and
academically qualified and with
exceptional or recognized expertise
or specialization in any branch of
architecture;
Which of the following is the responsibility of the architect in
relation to his/ her client
a. shall not knowingly call upon the Contractor or remedy oversights or error in the
Contract Documents to the Contractor’s or the Owner’s financial disadvantage.
b. shall explain the conditional character of estimates and in no case shall he/she
guarantee any estimates or cost of the work in order to secure a commission,
unless provided for by law, as in certain government projects. commission,
unless provided for by law, as in certain government projects.
c. shall not, when offering services as an independent consultant, quote a fee
without first receiving an official invitation for him/her to do so. The Architect must
have sufficient information on the nature and scope of the project to enable him/her
to prepare a fee proposal clearly indicating the services covered by the fee in order
to protect the Client and public from under-resourcing or underpricing by some
unscrupulous parties.
d. All of the above
BOARD OF ARCHITECTURE
Board Resolution No. 02, Series of 2006
CODE OF ETHICS
5.2 shall not knowingly call upon the Contractor or remedy oversights or error in
the Contract Documents to the Contractor’s or the Owner’s financial
disadvantage. (Article IV - The Architect’s Responsibilities In Relation To The
Contractor )
7.16 shall not, when offering services as an independent consultant, quote a fee
without first receiving an official invitation for him/her to do so. The Architect
must have sufficient information on the nature and scope of the project to
enable him/her to prepare a fee proposal clearly indicating the services covered
by the fee in order to protect the Client and public from under-resourcing or
underpricing by some unscrupulous parties. (Article VI - The Architect’s
Responsibilities In Realation To His/Her Colleagues And Subordinates )
BOARD OF ARCHITECTURE
Board Resolution No. 02, Series of 2006
CODE OF ETHICS
4.4 shall explain the conditional character of estimates and in no case
shall he/she guarantee any estimates or cost of the work in order to
secure a commission, unless provided for by law, as in certain
government projects.
(Article III - THE ARCHITECT’S RESPONSIBILITIES IN RELATION TO
HIS/HER CLIENT)
According to UAP Document 301: General Condition,
which of the following is the definition of performance
bond?
a. It is the approved form of security furnished by the contractor and his surety as a
guarantee of good faith on the contractor to execute the work in accordance with
terms of contract
b. It is the approved form of security furnished by the contractor and his surety as a
guarantee of good faith on the part of the contractor to pay all obligations arising
from the contract
c. It is the approved form of security furnished by the contractor and is surety as a
guarantee to the quality of materials and equipment installed and the workmanship
performed by the contractor
d. The cashier’s check or surety bond accompanying the proposal submitted by the
bidder, as a guarantee that the bidder will enter into a contract with the owner for the
construction of the work, if the contract is awarded to him.
According to UAP Document 301: General Condition,
which of the following is the definition of performance
bond?
a. It is the approved form of security furnished by the contractor and his surety as a
guarantee of good faith on the contractor to execute the work in accordance with
terms of contract
b. It is the approved form of security furnished by the contractor and his surety as a
guarantee of good faith on the part of the contractor to pay all obligations arising
from the contract
c. It is the approved form of security furnished by the contractor and is surety as a
guarantee to the quality of materials and equipment installed and the workmanship
performed by the contractor
d. The cashier’s check or surety bond accompanying the proposal submitted by the
bidder, as a guarantee that the bidder will enter into a contract with the owner for the
construction of the work, if the contract is awarded to him.
According to UAP Document 301: General Condition,
which of the following is the definition of performance
bond?
a. It is the approved form of security furnished by the contractor and
his surety as a guarantee of good faith on the contractor to execute
the work in accordance with terms of contract
b. It is the approved form of security furnished by the contractor and
Payment Bond his surety as a guarantee of good faith on the part of the contractor
to pay all obligations arising from the contract
c. It is the approved form of security furnished by the contractor and
is surety as a guarantee to the quality of materials and equipment
Guaranteed installed and the workmanship performed by the contractor
Bond d. The cashier’s check or surety bond accompanying the proposal
submitted by the bidder, as a guarantee that the bidder will enter
Proposal Bond into a contract with the owner for the construction of the work, if
the contract is awarded to him.
Based on the Owner- Architect Agreement, which if the
following is part of the Contract Document Phase?

a. he shall submit to the owner a statement of probable Construction Cost based on


Current Cost Parameter
b. He shall assist the Owner in obtaining proposals from the Contractors and in
awarding and preparing construction contracts
c. He shall assist the Owner in filling the required documents to secure approval of
Government authorities having jurisdiction over the design of the project
d. He shall submit to the Owner the client’s confidential Information Record for final
guideline.
Based on the Owner- Architect Agreement, which if the
following is part of the Contract Document Phase?

Preliminary a. he shall submit to the owner a statement of probable


Construction Cost based on Current Cost Parameter
Design Phase
b. He shall assist the Owner in obtaining proposals from the
Construction Contractors and in awarding and preparing construction
Phase contracts
c. He shall assist the Owner in filling the required
documents to secure approval of Government authorities
having jurisdiction over the design of the project
Design d. He shall submit to the Owner the client’s confidential
Information Record for final guideline.
Development Phase
Which of the following is properly arranged in terms of
specification writing?

a. “Installation of screw- jointed and solder- jointed tubing: All pipes and tubing shall
be cut accurately to measurements established by the contractor without springing
or forcing”
b. “the existing culverts shall be replaced as indicated on the drawing”

c. the equipment shall be removed and replaced as indicated


d. Aluminum paint: Fed. Spec TT-P-38
Which of the following is properly arranged in terms of
specification writing?

a. “Installation of screw- jointed and solder- jointed tubing: All pipes and tubing shall
be cut accurately to measurements established by the contractor without springing
or forcing”
b. “the existing culverts shall be replaced as indicated on the drawing”

c. the equipment shall be removed and replaced as indicated


d. Aluminum paint: Fed. Spec TT-P-38
Simplification: Use of imperative mood
a. Instead of: “Installation of screw- jointed and solder- jointed tubing: All pipes and
tubing shall be cut accurately to measurements established by the contractor
without springing or forcing”
say: Installation of screw- jointed piping end solder- jointed tubing accurately
to required measurements and work into place without springing or forcing
Avoid words having varied or indefinite meaning
b. Instead of: “the existing culverts shall be replaced as indicated on the drawing”
Say: Remove Existing culverts and reinstall in the new location
c. Instead of: the equipment shall be removed and replaced as indicated
Say: Remove equipment during the alteration thereof and reinstall after
completion.”
d. Aluminum paint: Fed. Spec TT-P-38
According to the Presidential Decree no. 856 or the Code of the
Sanitation of the Philippines, which of the following is true about
the regulation for Lighting:

a. General standards of illumination provided shall not permit effective


inspection and cleaning appropriate to the purpose for whichever room
b. In rooms where food is prepared in which utensil are washed, there shall be
illumination of 20 foot candles
c. Lighting shall not be reasonably free from glare
d. In premise where food is consumed, the minimum illumination intensity is
10 foot-candles
According to the Presidential Decree no. 856 or the Code of the
Sanitation of the Philippines, which of the following is true about
the regulation for Lighting:
Correct Answers
a. General standards of illumination
a. General standards of illumination provided provided shall permit effective
shall not permit effective inspection and inspection and cleaning appropriate
cleaning appropriate to the purpose for to the purpose for whichever room
whichever room b. In rooms where food is prepared in
which utensil are washed, there shall
b. In rooms where food is prepared in which be illumination of 20 foot candles
utensil are washed, there shall be illumination
of 20 foot candles c. Lighting shall be reasonably free
from glare to avoid cast of shadows
c. Lighting shall not be reasonably free from glare d. In premise where food is consumed,
d. In premise where food is consumed, the the minimum illumination intensity
minimum illumination intensity is 10 foot- is 5 foot-candles
candles
According to the Presidential Decree no. 1067 or the Water Code
of the Philippines, which of the following is true about the
utilization of waters:

a. Water contained in open canals, aqueducts may be used for watering plants
as long as the water is withdrawn by manual methods
b. When reuse of waste water is feasible, it shall not longer be limited for
efficiency and may help to lessen cost.
c. Excavation for purpose of emission of hot spring is not allowed ; must first
obtain a permit from Department of Environmental and Natural Resources
d. Drainage systems shall be constructed that their outlets are manmade
infrastructure provided by private property
According to the Presidential Decree no. 1067 or the Water Code
of the Philippines, which of the following is true about the
utilization of waters: Correct Anwers: Chapter 4 Utilization of Waters
a. Article 33 Water contained in open canals,
aqueducts may be used for watering
a. Water contained in open canals, aqueducts may plants as long as the water is withdrawn
be used for watering plants as long as the water by manual method. Provided there would
is withdrawn by manual methods be no damage checking the stream
b. When reuse of waste water is feasible, it shall b. Article 36: When reuse of waste water is
not longer be limited for efficiency and may help feasible, it shall longer be limited for
to lessen cost. efficiency and may help to lessen cost.
c. Excavation for purpose of emission of hot spring c. Article 40 Excavation for purpose of
is not allowed ; must first obtain a permit from emission of hot spring is not allowed ;
Department of Environmental and Natural must first obtain a permit from
Resources Department of Health
d. Drainage systems shall be constructed that their d. Drainage systems shall be constructed that
outlets are manmade infrastructure provided by their outlets are rivers, lakes natural
private property bodies of water approved by government
agency
According to the Presidential Decree no. 8749 or the Philippine
Clean Air Act, which of the following is true Rule 23 Non-Burn
Technologies:

a. There can be no public participation in monitoring thermal treatment


facilities
b. Incineration or burning of municipal, bio-medical and hazardous waste are
not yet prohibited with reservation
c. Existing incinerators dealing with biomedical waste shall be phased out on
or before July 17 2003
d. Emissions from treatment facilities using non burn technologiy are no longer
toxic when they result from chlorinated compounds
According to the Presidential Decree no. 8749 or the Philippine
Clean Air Act, which of the following is true Rule 23 Non-Burn
Technologies: Correct Answers: Rule 23
a. Section 6: There shall be public
a. There can be no public participation in participation in monitoring thermal
treatment facilities
monitoring thermal treatment facilities
b. Section 1: Incineration or burning of
b. Incineration or burning of municipal, bio- municipal, bio-medical and
medical and hazardous waste are not yet hazardous waste are prohibited
prohibited with reservation because it is considered as poisonous
with toxic fumes
c. Existing incinerators dealing with biomedical
c. Section 5 Existing incinerators dealing
waste shall be phased out on or before July with biomedical waste shall be
17 2003 phased out on or before July 17 2003
d. Emissions from treatment facilities using non d. Section 3 Emissions from treatment
burn technology are no longer toxic when facilities using non burn technology
they result from chlorinated compounds are still toxic when they exceed
According to the Presidential Decree no. 8749 or the Philippine
Clean Air Act, which of the following is true Rule 23 Non-Burn
Technologies:

a. There can be no public participation in


monitoring thermal treatment facilities
b. Incineration or burning of municipal, bio-
medical and hazardous waste are not yet
prohibited with reservation
c. Existing incinerators dealing with biomedical
waste shall be phased out on or before July d. Average values sample period of a
17 2003 minimum of four (4) and max of
eight (8) hours
d. Emissions from treatment facilities using non
burn technology are no longer toxic when
they result from chlorinated compounds
This scheduling method is widely used method for planning and
coordinating large-scale projects. This method was developed during the
1950s through the efforts of the U.S. Navy.

a. S-Curve / Velocity Chart


b. Bar / Gantt Chart
c. PERT (Program Evaluation and Review Technique)
d. Line of Balance (LOB) Chart
PERT (Program Evaluation and Review
Technique)
It is a critical path analysis which
uses a single point estimate for all
activity durations. PERT Charts are
often constructed from back to front
because, for many projects, the end
date is fixed and has front-end
flexibility. It was developed during
the 1950s through the efforts of the
U.S. Navy to help coordinate the
thousands of contractors it had
working on myriad projects.
S-Curve / Velocity Chart
It is a time scaled graph based
on the value based from the
planned value, earned value and
value cost. It is defined as a display
of cumulative costs, labor hours or
other quantities plotted against
time. The name is derived from the
S-like shape of curve, flatter at the
beginning and end, and steeper in
the middle that is typical of most
projects.
Bar / Gantt Chart
It is one of the most commonly
used graph that shows a project
schedule. It was developed by
Henry Laurence Gantt. It is a chart
in which a series of horizontal lines
shows the amount of work done or
production completed in certain
periods of time in relation to the
amount planned for those periods.
Line of Balance (LOB) Chart
It is typically used in situations
where skilled resources are
performing the same activities. It is
a management control process
used in construction where the
project contains blocks of
repetitive work activities, such as
in high rise buildings.
An intelligent model-based process that provides insight to help you
plan, design, construct, manage buildings and infrastructures.

a. BIM (Building Information Modelling)


b. Primavera
c. MS Project
d. MS Excel
BIM (Building Information Modelling)
It is an intelligent 3D model-
based process that gives
architecture, engineering, and
construction (AEC) professionals
the insights and tools to more
efficiently plan, design, construct,
and manage buildings and
infrastructures.
Primavera
It is an enterprise project
portfolio management software
which includes management,
scheduling, risk analysis,
opportunity management,
resource management,
collaboration and control
capabilities, and integrates with
other enterprise software such as
Oracle and SAP’s ERP systems.
MS Project
It is a project management
software product, developed and
sold by Microsoft. It is designed to
assist a project manager in
developing a schedule, assigning
resources to tasks, tracking
progress, managing the budget,
and analyzing workloads.
According to Rule IV, Section 401 in the NBC, this type of construction
shall be of masonry and wood construction.

a. Type I
b. Type V
c. Type IV
d. Type III
Type III
Shall be of masonry and wood construction. Structural elements may
be any of the materials permitted by the Code provided, that the
building shall be one-hour fire-resistive throughout. Exterior walls shall
be of incombustible fire-resistive construction.
Type I
Shall be of wood construction. The structural elements may be any
of the materials permitted by the Code.

Type V
Shall be four-hour fire-resistive throughout and the structural elements
shall be of steel, iron, concrete, or masonry construction.

Type IV
Shall be steel, iron, concrete, or masonry construction and walls,
ceiling and permanent partitions shall be of incombustible fire-resistive
construction, except, that permanent non-bearing partitions of one-hour
fire-resistive construction may use fire-retardant treated wood within
the framing assembly.
Any condition or act which increases or may cause an increase in
the probability of the occurrence of fire, which may obstruct, delay,
hinder or interfere with fire fighting operations and the
safeguarding of life and property.
a. Fire Protective Assembly
b. Fire Hazard
c. Fire Resistance Rating
d. Hazard Evaluation
Any condition or act which increases or may cause an increase in
the probability of the occurrence of fire, which may obstruct, delay,
hinder or interfere with fire fighting operations and the
safeguarding of life and property.
Correct Answers
a. Fire Protective Assembly - An assembly incorporated in the structure
designed to prevent the spread of fire, such as dampers, curtain boards, fire
stoppers and the like.
b. Fire Hazard
c. Fire Resistance Rating - The time duration that a material or construction
can withstand the effect of a standard fire test.
d. Hazard Evaluation - Identification of potential hazards which includes risk
evaluation that takes into account the likelihood of the hazard resulting in a
fire or explosion.
According to BP220 Planning Design and Standards for
Residential Sudbivision Project, what is the minimum lot area for a
single detached economic housing?

a. 28 sqm
b. 36 sqm
c. 72 sqm
d. 48 sqm
According to BP220 Planning Design and Standards for
Residential Sudbivision Project, what is the minimum lot area for a
single detached economic housing?

Correct Answers
What is BPP 344 ‘s purpose?

a. Provide minimum requirements and standards to make buildings, facilities and


utilities for public use accessible to disabled persons.
b. An acct providing for the rehabilitation, self-development, and self-reliance of
disabled persons and their integration into the mainstream of society and for
other purposes.
c. It is a policy of the government to promote and encourage the development of
economic and socialized housing projects, primarily by the private sector in order
to make available adequate economic and socialized housing units for average
and low income earners in urban and rural areas.
d. It is the policy of the State to ensure public safety, promote economic
development through the prevention and suppression of all kinds, of destructive
fires, and promote the professionalization of the fire service as a profession.
What is BPP 344 ‘s purpose?

Correct Answers
a. Provide minimum requirements and standards to make buildings, facilities and utilities for
public use accessible to disabled persons.
b. An acct providing for the rehabilitation, self-development, and self-reliance of disabled
persons and their integration into the mainstream of society and for other purposes. – RA
7277 Magna Carta for Disabled Persons
c. It is a policy of the government to promote and encourage the development of economic
and socialized housing projects, primarily by the private sector in order to make available
adequate economic and socialized housing units for average and low income earners in
urban and rural areas. – BP 220 Declaration of Policies
d. It is the policy of the State to ensure public safety, promote economic development
through the prevention and suppression of all kinds, of destructive fires, and promote the
professionalization of the fire service as a profession. – Fire Code of the Philippines (Rule 1)