Unit - 2: Statistical Process Control in Industry
Unit - 2: Statistical Process Control in Industry
Central Line
Values
Time
Control Chart Types
Control charts
Variables Attributes
chart chart
R X P,np C,u
chart Chart Chart Chart
Control chart for variables
• Quality characteristics which can measured and expressed
in specific units of measurements is called variables.
• Control chart based upon measurements of quality
characteristics for variables.
Types
o X or average chart- monitor the centering of the process to control
its accuracy
o R or range chart- monitor the dispersion or precision of the process
o S or standard deviation chart– shows variation of the process
Construction of X and R chart
• Select the characteristics for applying control chart.
• Select the appropriate type of control chart
• Collect the data.
• Choose the rational sub group, ie,. Sample
• Calculate the average(X) and range (R) for each sample.
Sub group average X = x1 + x2 +x3 +x4 +x5 / 5
Sub group range R = Max Value – Min value
• Calculate the average of the averages(X) and average of
range(R)
• Calculate the averages of the average and range
x
X
N
R
R
N
X Chart
Control Limits
Second Approach ,is to use the sample range as a measure of process
variability, CL x
the appropriatex formulas for control limits are calculated as,
UCL x A R Factor or
x 2
LCL x A R
x 2 constant
From
Sub group average X = x1 + x2 +x3 +x4 +x5 / 5 Tables
Sub group range R = Max Value – Min value
R Chart Control Limits
e.g., good-bad
•
• Shows % of nonconforming items
• Example: Count # defective chairs & divide by total chairs
inspected; Plot
o Chair is either defective or not defective
p Chart-Control Limits
c
c
n
UCLc c 3 c
Use 3 for
LCLc c 3 c 99.7% limits
CLc c
u Chart
• u chart is used in case of no. of defects observed in
sample when the sub group size varies from sample to
sample u= no. of defects in a
• u chart control no. of units in a
the no. of defects per unit
sample(c)
sample(n)
UCLu u 3 u n
LCLu u 3 u n
CLu u
Use of p,np,c,u chart
Type Use
p Chart Finding fraction defectives as non-conforming
specification
np Chart For defectives
Graphs
Types of graph
Bar graph Band chart
Pie chart
Line graph
Gantt chart
their uses
Graph type Characteristics & Application
mean = x = ånxi = -
-1
2 = -.17 -1
12 0
0
n=12 0
0
0
1
3
-6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 4
Mean åxi = -2
11/2/21 64
WHAT IS THE MEDIAN?
If we rank order (descending or ascending) the data set ORDERED DATA SET
,we find the value half way (50%) through the data points -5
and is called the median value. -3
-1 50% of
data
-1 points
0
0
Median 0
0
0
1
3
-6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 4
Median
Value
11/2/21 65
WHAT IS THE MODE?
If we rank order (descending or ascending) the data set
ORDERED DATA SET
We find that a single value occurs more often than any -5
.other. This is called the mode. -3
-1
-1
0
0
Mode Mode 0
0
0
1
3
-6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 4
11/2/21 66
WHAT IS THE RANGE?
The range is a very common metric . ORDERED DATA SET
-5
To calculate the range simply subtract the minimum value -3
in the sample from the maximum value. -1
-1
Range = x MAX - x MIN = 4 - (-5) = 9 0
0
0 Range
0
0
1
3
-6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 4
Range
Min Max
11/2/21 67
WHAT IS THE VARIANCE/STANDARD DEVIATION?
The variance (s2) is a very robust metric .
The standard deviation(s) is the square root of the variance and is the most
commonly used measure of dispersion. Xi X 2
åXi - 2 -.17
DATA SET X -Xi
X = = = -5 -5-(-.17)=-4.83 (-4.83)2=23.32
n 12 -3
-1 -3-(-.17)=-2.83 (-2.83)2=8.01
= å(n - 1 ) = 12 - 1 = 56
2
2 X -X i 6167
.
-1
0
-1-(-.17)=-.83 (-.83)2=.69
s . 0 -1-(-.17)=-.83 (-.83)2=.69
0 0-(-.17)=.17 (.17)2=.03
0
0 0-(-.17)=.17 (.17)2=.03
1
3 0-(-.17)=.17 (.17)2=.03
-6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 4 0-(-.17)=.17 (.17)2=.03
0-(-.17)=.17 (.17)2=.03
1-(-.17)=1.17 (1.17)2=1.37
11/2/21 68
Types of Measures
• Measures where the metric is composed of a classification in one of
two (or more) categories is called Attribute data.
_ Good/Bad
o Yes/No
Price .2 6 7
Speed of Delivery .3 7 6
Reliability .4 5 6
Customizability .1 8 7
Matrix Diagram S.M.A.R.T. Plan Example
Specific Measurable Assignment Resources Time Predecessors
(Weeks)
A Evaluate Deliverable Steve 8 hours 1 -
Needs
B Schedule Deliverable Doug 4 hours 1 -
Training
C Evaluate Deliverable Morgan 10 hrs, copies 2 A
Software of software
Cost Effectiveness
High Quality
Shareholder Value