Bill of Materials

AVINASH
Agenda
Organizational layout of Bill of Material
Low level coding
Maintenance of Bill of Material
Validity process and changing an active Bill of Material
Archiving and Deletion process of BOM
BOM reporting
Comparative reporting tools for bill of material
Business Example
To Implement Bill of Material, you must be aware of the structural design of the object in SAP
Your company has requirements to use bills of material for costing, engineering and production
You will learn how the bill of material is structured to integrate with several business areas in
your company
What is BoM?
BOM Example
BOM Terminology
BOM Integration
BOM Usage
BOM Categories
Demo
BOM Status
Demo
Low Level Code
Managing BOM
Create BOM - CS01
Change BOM – CS02
Create Plant Assignment – CS07
Change Plant Assignment – CS08
Plant Specific BOM
Structure of a BOM
Subitem of BOM
BOM Item Categories
Variable size Item R
Non-Stock Item N
No Stock is maintained – Will not be planned by MRP
Document Item Category D
Class Item
Recursion - Example
To create Yogurt, you need raw materials as Yogurt.
In case of Oil Industry, if you want to repack the oil from bigger containers to smaller containers,
at this time the BOM with recursive is used in the production order.
In chemical industry, some chemical can be prepared from the same chemical of small quantity.
It is mainly used in process industry
Deletion of BOM
Deletion of Item is possible
Deletion of BOM at header level, but in real time, a BOM is marked with deletion flag.
BOM Explosion
Where used list?
To Calculate the requirements for a particular material
To find the products that are affected by a change to an individual part.
To find the assemblies that will be produced late due to the delay in delivery of raw materials.
To calculate the cost effects on a product if raw materials costs change
BOM Comparison
Thank you