Preparation of Platform (LHS of Abut. A) Laying of Layer 150mm Sand (LHS of Abut. A) Laying of Layer PEC200 (LHS of Abut. A)

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 3

LAYING OF PEC200 AT TRANSITION AREA RUB S7-1B

Preparation of platform (LHS of Abut. A) Laying of 1st layer 150mm Sand(LHS of Abut. A) Laying of 1st layer PEC200 (LHS of Abut. A)

Preparation of platform (LHS of Abut. B) Laying of 1st layer 150mm Sand(LHS of Abut. B) Laying of 1st layer PEC200 (LHS of Abut. B)
LAYING OF PEC200 AT TRANSITION AREA RUB S7-1B (Continue)

Laying 300mm Sand (LHS of Abut. A) Lapping 2m of PEC200 (LHS of Abut. A) Laying of 2nd layer PEC200 (LHS of Abut. A)

Laying 300mm Sand (LHS of Abut. B) Lapping 2m of PEC200 (LHS of Abut. B) Laying of 2nd layer PEC200 (LHS of Abut. B)
LAYING OF PEC200 AT TRANSITION AREA RUB S7-1B (Continue)

Laying 300mm 2nd Sand (LHS of Abut. A) Lapping 2m of 2nd PEC200 (LHS of Abut. A) Laying 150mm layer Sand (LHS of Abut. A)

Laying 300mm 2nd Sand (LHS of Abut. B) Lapping 2m of 2nd PEC200 (LHS of Abut. B) Laying 150mm layer Sand (LHS of Abut. B)