Professional Documents
Culture Documents
SYNOPSIS
SYNOPSIS
MAJOR PROJECT
• TITLE : 5 HOTEL
• SITE LOCATION : VILLAGE AMBOTA TEH. AMB DISTT. UNA
(HP)
• CLIENT : SH. IQWAL ALI
• AREA : 15335.51 SQ.M
5 HOTEL :
INTRODUCTION : It's supposed to
mean luxury, High End, top Service, the best
of the best.
The five star system is given by a International Hotel
Association. This is according to the status service provided
quality of service ,space ,interior ,decoration, food facility
,restaurant ,taxi service, swimming pools ,personal facilities
,bar ,salon facility ,body message facility, medical facility, office
support speciality.Before providing the certification of Star all
type of facilities provided by the hotel is taken in consideration.
RATING
SYSTEM
SCOPE AND
LIMITATIONS
SCOPE :
• TO PERPARE THE MASTER PLAN IOF THE BUILDING.
• TO REDSIGN BLOCK OF THE BUILDING.
LIMITATION :
• IS RECREATION AREA SUCH PARK AND GARDEN. BECAUSE THE TIME
GIVEN FOR PROJECT IS NOT SUFFICEINT.
REQUIREMENTS
GROUND FLOOR PLAN :
NAMES
1. PARKING PLAN
2. ENTERANCE FOYER/LOBBY
3. LUGGAGE ROOM
4. SAFETY ROOM
5. SHOPES
6. GUEST LIFT AND STAITR CASE
7. TOILETS FOR LADIES AND GENTS
8. RECEPTION DESK
9. FRONT OFFICE
10. RESERVATION OFFICE
11. A.H.U ROOM
REQUIREMENTS
GROUND FLOOR PLAN :
NAMES
13. SERVICE LIFT
62. JACUZZI
63. SAUNA
64. AYURVEDIC ROOM
65. STORE ROOM
66. STAF REST ROOM
67. STEAM ROOM
68. SPECILTY RESTURANT
69. KITCHEN
REQUIREMENTS
THIRD FLOOR PLAN :
NAMES
70. 18 LUXERY ROOM WITH ATTACH TOILETS
•SITE ANALYSIS :
• LOCATION AND APPROACH
• CLIMATIC CONDITION PREVAILING
• TOPOGRAPHY
• SITE SURROUNDINGS
• TYPE OF VEGETATION
PROJECT PROCEDURE
• DESIGN CONCEPT :
• CONCEPT STAGE
• PRIMARY DEVELOPMENT
• DESIGN CONCLUSION
PROJECT PROCEDURE
• FINAL DESIGN :
• LAYOUT PLANS
• PLANS
• ELEVATIONS
• SECTIONS
• VIEWS
• STRUCTURE SYSTEM
• FINAL DESIGN
ARCHITECTURE
MAJOR PROJECT ON
5 HOTEL
THANKU