Professional Documents
Culture Documents
CE F425-Airport Drainage
CE F425-Airport Drainage
BITS Pilani
Hyderabad Campus
AIRPORT DRAINAGE
• Purpose of Drainage
• Amount of runoff
• Dynamic Aquaplaning
• Reverted Rubber Aquaplaning
• Viscous Aquaplaning
Q = CIA
Q = Run off from the drainage basin (ft/sec)
C = Ratio of runoff to rainfall (coefficient of runoff)
I = Rainfall intensity (inch /hour)
A = Drainage area in acres
Where
A1, A2, A3 = areas of different types of surfaces
C1, C2, C3 = respective coefficient of runoffs
• The design should be such that entire quantity of surface run off
should be removed in 1 to 2 hours following the rain storm.
BITS Pilani, Hyderabad Campus
SURFACE DRAINAGE
https://www.slideshare.net/srinivas2036/airport-drainage-47193829