Arief Arbi #8492

Master Mechanic
3rd, 2007
Logistic Maintenance

2007, as Electrician 3
2010, as Electrian 2
2014, as Electrician 1
2017, as Master Mechanic

About 2 years as PM Check Team Leader


Acting Contamination Controllers
Acting Part Coordinator & Scheduler
Acting MEM Port Coordinator
Initiatives, Tasks, Projects and Achievements
 Fabrication Guard for Front Glass Wheel Loader CAT966H
 Repair Workshop Tools
 Rewiring Control Panel engine HSFO Pump, Speed Boat and Porter
 Troubleshooting Crane, Wheel Loader, Excavator, Grader, Boat, Genset,
Lighting Plan, Forklift, Engine Pump, Air Compressor, Asphalt Cettle, etc
 First Line for High Voltage failure
 Make JSA for E-Crane Boom cylinder dan trackshoe Replacement
 As Leader on the E-CRANE Trackshoe Replacement Project
 Workshop Oil Trap Roof Project
 Manitowoc Crane 14000 Installation Project
 PCR on Wheel Loader CAT-966H and Excavator CAT-385CMH
 2 years as PM Check Team Leader

2
IDEAS For Logistic Maintenance
Current Condition to
Purpose Benefits Recomendation
Conditions be Achieved

The condition of
There are no the equipment
perform periodic
inspections, repairs can be detected
waiting part and inspections on
are only made early so that it
downtime can equipment prior to
Periodic when the can be repaired
be reduced, scheduled
Inpection equipment is before it is
reliability target maintenance. both in
damaged or during seriously
can be achieved the workshop and in
a PM Check damaged or can
the field
schedule be planned
properly

Parts for PM checks


Create part
are often not
There is no management data.
appropriate. Both in Every PM check,
delay in the revise the checklist
terms of part the parts needed
Updating PM execution team to match the PM
number, quantity must match.
Checklist and when executing variations, update
and PM variations. Appropriate part
Part a job. Only the the part number
Management There are parts that number and
parts that will be information. enter it
have changed but quantity based on
used are into the system so
the PM Checklist PM variations
ordered. that everyone can
3 hasn't been
access it.