SURVEY PROJECT
from-B3 Batch
W TANK PROJECT(NTP)
CALCULATIONS:
Highest RL -873.00m
Lowest RL-869.93
Highest RL-Lowest RL
=873.00-869.93
=3.07
Number of Contour lines taken=7
therefore,
3.07/7 = 0.43
CALCULATIONS:
First interpolation=873.00-0.43
=872.57m
Second interpolation=872.57-0.43
=872.14m
Third interpolation=872.14-0.43
=871.71m
Fourth interpolation=871.14-0.43
=871.28m
Fifth interpolation=871.28-0.43
=870.85m
Sixth interpolation=870.85-0.43
=870.42m
Seventh interpolation=870.42-0.43
=869.99m`