EXISTING LAYOUT

SMDB 7

40 50
Spare Spare
A A

SMDB-DR MCCV 2 MCCV 3


40 40
Factory Factory
Industrial Socket (For Heat Exchanger 1 A A
80 32 First Floor Second Floor
loading of Pump Motor Control
A A
Styrene/PG) Panel
MCCV 1
160 40
SMSB-B1 A Factory
A
100 160 Boiler Room Ground Floor
Chiller 1 Chiller 4
A A
DB-S SMSB-T
40 40 For Raw Material
Factory
A A Pumps (QBC Tanks)
160 100 Second Floor
Chiller 3 Chiller 2
A A
50 DB-F
DB-G 40 Factory
A
50 A First Floor
400
Spare
A A
Empty -

From Main 400


A

Raw Material Tank Area


From Main

Factory Area
OPTION 1 LAYOUT
SMDB-HX (new Panel) SMDB 7
Heat Exchanger 2 Heat Exchanger 1
40 40
Pump Motor Control
Pump Motor Control A 40 50
A Panel Spare Spare
Panel A A

Spare Spare
40 40 For additional HX MCCV 2 MCCV 3
For additional HX A A 40 40
pumps pumps Factory Factory
A A
First Floor Second Floor

63
A MCCV 1
160 40
SMSB-B1 A Factory
A
Boiler Room Ground Floor

From DB-S SMSB-T


SMDB-DR 40 40 For Raw Material
Factory
A A Pumps (QBC Tanks)
Second Floor

50 DB-F
DB-G 40 Factory
A
SMDB-DR 50 A First Floor
Spare
A
Industrial Socket (For NEW Empty -
80 63
loading of SMDB-HX
A A
Styrene/PG) Panel
400
A
100 160
Chiller 1 Chiller 4
A A

160 100
Chiller 3 Chiller 2
A A From Main

400
A

Factory Area
From Main

Raw Material Tank Area


OPTION 2 LAYOUT
SMDB 7

Industrial Socket (For


40 50
loading of Spare
A A
Styrene/PG)

MCCV 2 MCCV 3
SMDB-DR 40 40
Factory Factory
A A
First Floor Second Floor
Heat Exchanger 1 Heat Exchanger 1
80 32
Pump Motor Control Pump Motor Control
A A MCCV 1
Panel Panel 160 40
SMSB-B1 A Factory
A
Boiler Room Ground Floor
100 160
Chiller 1 Chiller 4
A A DB-S SMSB-T
40 40 For Raw Material
Factory
A A Pumps (QBC Tanks)
Second Floor
160 100
Chiller 3 Chiller 2
A A 50 DB-F
DB-G 40 Factory
A
50 A First Floor
Spare
400 A
A -
Empty

400
From Main A

Raw Material Tank Area


From Main

Factory Area