Existing Layout: Raw Material Tank Area
Existing Layout: Raw Material Tank Area
SMDB 7
40 50
Spare Spare
A A
Factory Area
OPTION 1 LAYOUT
SMDB-HX (new Panel) SMDB 7
Heat Exchanger 2 Heat Exchanger 1
40 40
Pump Motor Control
Pump Motor Control A 40 50
A Panel Spare Spare
Panel A A
Spare Spare
40 40 For additional HX MCCV 2 MCCV 3
For additional HX A A 40 40
pumps pumps Factory Factory
A A
First Floor Second Floor
63
A MCCV 1
160 40
SMSB-B1 A Factory
A
Boiler Room Ground Floor
50 DB-F
DB-G 40 Factory
A
SMDB-DR 50 A First Floor
Spare
A
Industrial Socket (For NEW Empty -
80 63
loading of SMDB-HX
A A
Styrene/PG) Panel
400
A
100 160
Chiller 1 Chiller 4
A A
160 100
Chiller 3 Chiller 2
A A From Main
400
A
Factory Area
From Main
MCCV 2 MCCV 3
SMDB-DR 40 40
Factory Factory
A A
First Floor Second Floor
Heat Exchanger 1 Heat Exchanger 1
80 32
Pump Motor Control Pump Motor Control
A A MCCV 1
Panel Panel 160 40
SMSB-B1 A Factory
A
Boiler Room Ground Floor
100 160
Chiller 1 Chiller 4
A A DB-S SMSB-T
40 40 For Raw Material
Factory
A A Pumps (QBC Tanks)
Second Floor
160 100
Chiller 3 Chiller 2
A A 50 DB-F
DB-G 40 Factory
A
50 A First Floor
Spare
400 A
A -
Empty
400
From Main A
Factory Area