Professional Documents
Culture Documents
ZPMC Section 5 Typical Tasks
ZPMC Section 5 Typical Tasks
www.zpmc.com
Move the gantry in case of shaft broken
1. The operator must inform the maintenance person first;
2. Set the crane to maintenance mode instead of normal operation mode
andoperate in the operation station on the ground;
3. Clear all the obstacles on the rail;
4. If there’s a container under spreader, lower it slowly on the ground and
lift up the spreader;
5. Drive the trolley to the nearest parking position and hoist the boom up to
reduce the effects to other cranes;
6. Put two jacks under the bush and jack the wheel. The load of the jack
are as follows:
www.zpmc.com
Move the Gantry in case of shaft broken
7. Weld a support between the bogie and beam;
8. Take the jack away and dismantle the wheel ;
9. Drive the gantry slowly to a safe place.
www.zpmc.com
Move the trolley in case of shaft broken
1. The crane operator must inform the maintenance person immediately.
2. Switch the “operation mode” to “maintenance mode”.
3. If there is a container under the spreader, lower the hoist slowly to unlock
the container.
4. Clean all the obstruction on the trolley rail.
5. Run the trolley backward slowly to parking position.
6. Hoist the boom to the stowage position.
7. Turn off the control power.
8. Put a jack under the corner and jack the trolley more than 5mm.
9. Put a slap block under the frame.
10. Remove the jack and tie the wheel to the frame in case it falls down.
11. Drive the trolley to the back reach under the machinery house.
12. Disconnect the wheel with shaft and lift them to the ground with inside
service crane.
13. Dismantle the shaft in the workshop.
www.zpmc.com
Open the gantry rail brake manually
www.zpmc.com
Release the gantry anchor pin manually
www.zpmc.com
Open the main hoist drum brake manually
1. Close the valve 10A.
2. Open the valve 11A & 20C.
3. Operating the manual pump until
the drum brake open.
4. Open the valve 10A, close the
valve 11A & 20C,recover the
hydraulic system.
www.zpmc.com
Open the boom hoist drum brake manually
1. Close the valve 10B.
2. Open the valve 11B & 20C.
3. Operating the manual pump until
the drum brake open.
4. Open the valve 10B, close the
valve 11B & 20C,recover the
hydraulic system.
www.zpmc.com
Operating the crane after snag
What is snag?
Snag is a condition that typically occurs when a
lifting spreader hooks or hits an obstruction such as
the cell guides.
www.zpmc.com
Operating the crane after snag
After the snag occurs, the snag indicating light will be on in the
operator’s cab, an audible warning will be sounded and the
control power will be shut off. Meanwhile, only lowering the
hoist is allowed at the reduced speed to release the strain on
the ropes and no hoist raise motion is permitted.
Brief:
Once the snag happens
Pressure send out a signal to main hoist system.
Main hoist motors will stop at once.
Emergency brake and high speed brake work together to stop
the main hoist drum.
Relief valve open.
Snag cylinder retracts with high speed.
Wire rope get the compensate length.
www.zpmc.com
Operating the crane after snag
www.zpmc.com
Adjust the Motor brake
www.zpmc.com
The adjustment of brake torque
Torque adjusting nut
Minimum torque
(adjust it when
switch-off)
Hb
Hb
YP1-220~300 15~17
YP1-500~800 25~27
YP2-500~3000 18~21
YP3-1250~3000 12~15
YP11-220~300 18~20
Measure the reserve stroke of thruster , repeat
the above operations until it accord with the YP21-220~800 10
requirements (reserve stroke refers to the right YP31-
10
table and instructions) 1250~3000
! Danger : reserve stroke of the thruster is not less than 10mm, the cover bottom of
the push-rod is not in the range of the red area.
The adjustment of shoe clearance balancing
Lock nut
Brake arm
Adjustme
nt nut
Balancing
lever device
Adjustm
ent rod
If the clearance of adjustment rod is small when open, loosen lock nut, clockwise
turn the adjustment nut slowly, observe the clearance between linings till be
equal. Finally screw down the lock nut.
If the clearance of adjustment rod is big when open, loosen lock nut,
anticlockwise turn the adjustment nut slowly, observe the clearance between
linings till be equal. Finally screw down the lock nut.
Adjust the drum brake
www.zpmc.com
Adjust the drum brake
www.zpmc.com
Adjust the drum brake
www.zpmc.com
Adjustment when trolley skew
www.zpmc.com
Adjustment when trolley skew
When to adjust the trolley skew
www.zpmc.com
Gantry Jacking procedure
Jacking points
Dead load of crane ( 65T-
55M)
Trolley at Parking position
Waterside Landside
t/corner t/corner
boom level 285 260
boom up to 70° 195 345
Waterside Landside
t/corner t/corner
boom level 425 275
boom up to 80° 340 385
www.zpmc.com
Gantry Jacking procedure
1.Move the gantry to proper position. Pay attention
that the jacking force could also not exceed the
allow press force on wharf.
2.Move the trolley to parking position.
3.Install jacking beam under the lower equalizer
beam or upper equalizer beam and fix it. Install the
Jacking beam or thick plate on wharf to reduce the
press on wharf.
Note: Jacking shall be performance when the wind
speed is not big ,usually less than 8.3m/s,about 5
scale of wind speed)
www.zpmc.com
Gantry Jacking procedure
4. Install the jacks and support under jacks. Make sure the jack
and support are stable at any case. Connect the hydraulic
pipe. Two jacks shall have the same pressure to keep the
equalized force.
5) Start to jacking slowly. The force on two end of jacking beams
shall be even.
7) Usually jack up 5~10mm is enough for changing the wheel
bearing or similar tasks.
8) If the jack has to be keep jacking the equalizer beam. Addition
support shall be added to support the equalizer beam.
Make sure the additional support are stable at any case.
9) After maintenance tasks such as changing the bearing. Slowly
lower the jacks, make sure the equalize force on both end of
jacking beam.
www.zpmc.com
www.zpmc.com