LMM - JJS - PPT 5A - Lean Tools & Techniques
LMM - JJS - PPT 5A - Lean Tools & Techniques
POKA YOKE
LEAN 6 SIGMA
J J SHRIKHANDE 1
Quick Change Over
SMED
Single Minute Exchange of Die
J J SHRIKHANDE 2
This Photo by Unknown Author is licensed under CC BY-SA
Classic Changeover
Steps to Changeover
1. Machine is stopped
2. Changeover operations happen
3. Machine will start again
J J SHRIKHANDE 3
J J SHRIKHANDE
Internal Setup:
• this is work that must be done on the machine when it is shutdown. For
example, the stationary die half can only be attached to the stationary
machine platen when the machine is shut down.
4
Four Steps to SMED
J J SHRIKHANDE 5
J J SHRIKHANDE
6
J J SHRIKHANDE
Four
• Minimize " turning " movements: they request several grasp-
release motions!
Principles of
• Fit at once, in a single motion
• Use blocks, jigs, templates
Work together!
• Setup a racing pit team
Item Description
Duration The changeover is long enough to have significant room for improvement, but not too long as to
be overwhelming in scope (e.g. a one hour changeover presents a good balance).
Variation There is large variation in changeover times (e.g. changeover times range from one to three
hours).
Opportunities There are multiple opportunities to perform the changeover each week (so proposed
improvements can be quickly tested).
Familiarity Employees familiar with the equipment (operators, maintenance personnel, quality assurance,
and supervisors) are engaged and motivated.
Constraint The equipment is a constraint/bottleneck – thus improvements will bring immediate benefits. If
constraint equipment is selected, minimize the potential risk by building temporary stock and
otherwise ensuring that unanticipated downtime can be tolerated.
8
J J SHRIKHANDE
9
J J SHRIKHANDE
Item Description
Sticky Notes A fast method of capturing elements is to create a series of post-it notes that are stuck to
a wall in the order in which they are performed during the changeover.
Man and Machine Be sure to capture both “human” elements (elements where the operator is doing
something) and “equipment” elements (elements where the equipment is doing
something). As discussed later, the human elements are usually easiest to optimize.
Other Notes While videotaping the changeover have several observers taking notes. Sometimes the
observers will notice things that are missed on the videotape.
Observe Only observe – let the changeover take its normal course.
10
J J SHRIKHANDE
For each element the team should ask the following question:
11
J J SHRIKHANDE
ITEM DESCRIPTION
12
J J SHRIKHANDE
For each internal element, the team should ask the following
questions: If there was a way to make this element external, what
would it be? How could we do it?
This will result in a list of elements that are candidates for further
action. This list should be prioritized so the most promising candidates
are acted on first. Fundamentally, this comes down to performing a
cost/benefit analysis for each candidate element:
13
J J SHRIKHANDE
Item Description
Advance Preparation Prepare parts in advance (e.g. preheat dies in advance of the
changeover)
Jigs Use duplicate jigs (e.g. perform alignment and other adjustments in
advance of the changeover)
Modify Modify equipment (e.g. add guarding to enable safe cleaning while
the process is running)
14
Step Five – Streamline Remaining Elements
• In this step, the remaining elements are reviewed with an eye towards streamlining and
simplifying so they can be completed in less time. First priority should be given to internal
elements to support the primary goal of shortening the changeover time.
• For each element, the team should ask the following questions: How can this element be
completed in less time? How can we simplify this element?
• As in the previous step a simple cost/benefit analysis should be used to prioritize action on
elements.
J J SHRIKHANDE 15
Examples of techniques that can be used to streamline elements are:
Item Description
Release Eliminate bolts (e.g. use quick release mechanisms or other types of
functional clamps)
Waiting Eliminate waiting (e.g. make first article inspection a high priority
for QA)
Operations Create parallel operations (e.g. note that with multiple operators
working on the same equipment close attention must be paid to
potential safety issues)
SMED
How much money cost a setup?
• During a setup we keep spending money. We keep paying salaries to all employees (employees who are part of
production and all employees in our organization), we keep paying rent, and we keep paying everything else except direct
costs such as those of energy and raw materials. So we can sum up the cost of a setup:
Setup cost = Hours spend X Average Contribution per hour of production
• Average contribution per hour of production is a value that most financial departments hold. It means how much net
money we make per hour of production. It is usually calculated as the price that the customer pays us minus the direct
cost per product such as energy and raw materials (not employees’ salaries which we will pay regardless of whether we
produce or whether the tool is idle).
Sales per Production Hour = Annual sales from a machine/Actual hours machine worked
• How do we calculate it:
• Average contribution per hour of production =
Sales per hour of production – raw material cost per hour of production – energy cost per hour of production
• In normal circumstances efforts & money put in to save the downtime due to Set up time reduction and for reducing the
machine downtime through timely & pre planned repairs of machines , is much less in monetary terms , as compared to
saving accruing due to extra business because of availability of extra hours for production .
19
Finally, a common example of how SMED principals can be applied to shorten the time of a
changeover. How long does it take you to change a tire on your car after you have stopped? 15
minutes?
When Dale Earnhart Jr. pulls into the pits at a NASCAR race, his four tires are changed and the car
filled with fuel in about 15 seconds.
J J SHRIKHANDE 20
When Michael Schumacher pulls into the pits during a Formula 1 race,
Of course he as twice the number of tire changers that Dale Jr. has. Also, only
one lug nut/spinner per wheel.
J J SHRIKHANDE 21
Alice Z. China B.
o o
Tools needed & Location
o impact wrench, 1/2 & 3/4 drivers
o 2T hoist
o Tool/cleanup Cart
o Die preheat station, 30 min. or 350F.
o Prybar
Parts needed
o Vee clamps, use from existing SU
o 2x-3/4 x 2 SHCS for ej. Plate, use from existing SU
o 4x-Hose disconnects, use from existing SU
o vacuum, scraper, solvent, brushes for clean- up
o SOP 001 (setup)
o SOP 002 (cleanup)
o SOP 003 (preheating)
J J SHRIKHANDE 22
Example Checklist for setup of D/N 3000.
Function Checks CstgDie 3000
Operation: Function Check
Date: Jun-05
Visual check
o Cover cavity: cores and mounting screws tight
o Eject. Cavity: cores, ejector pins, mounting screws tight
o Tool/cleanup Cart
o Ejector plate: Pins free and lubed, mounting screws tight
o Ejector plate: Insert spacer block, check heights of all ej. Pins in cavity to spec.
Tools required
o 3/4 Allen key
o 1/2 Allen key
o 1215 master ejector spacer block
1. Leave die open, return ejector plate, change to manual mode turn off cooling. 1. Lower hoist into position above stationary die half.
2. At stationary half, disconnect cooling lines, 2. Add slight tension to hoist.
drain first and then inlet.
3. Lift die half out of DCM and place in stage in “removed die holding area”
3. Unbolt two clamps from the stationary die half and attach hoist.
4. Obtain the stationary half of DN 3000 from the die pre-heating station and lift into
4. Use pry bar to move die half off of keyway and guide die out of die space. die space. Wait for operator to locate die on keyway.
5. Clean-up die space in area of the stationary die half. 5. Lower hoist into position above the moving stationary die half.
6. Locate DN 3000 on keyway and clamp into place. Disconnect hoist. 6. Add slight tension to hoist.
7. At moving half, disconnect cooling lines, drain 7. Lift die half out of DCM and
first and then inlet.
8. place in “removed die holding area”
8. Attach hoist, unbolt two clamps and unscrew two ejector plate retaining screws.
9. Obtain the moving half of DN 3000 from the die pre-heating station and lift into die
9. Use pry bar to move die half off of keyway and guide die out of die space. The moving space. Wait for operator to locate die on keyway.
die half.
10. Move hoist away from above the DCM.
10. Clean-up die space in area of the stationary die half.
11. Reset DCM machine settings if necessary.
11. Locate DN 3000, moving half, on keyway and clamp into place. Disconnect hoist12.
Insert and install two ejector plate restraining screws. 12. Readjust die sprayers as necessary.
12. Insert and install two ejector plate restraining screws. 13. Readjust autoladle if necessary.
13. Reconnect cooling lines to the moving half. 14. Remove Tool/Cleanup cart.
14. Reconnect cooling lines to the stationary die half. Adjust to low flow to fill die with 15. Replace material handling containers for the new castings.
coolant.
15. Close die, check lock.
J J SHRIKHANDE 24
One Turn Functional Clamping
J J SHRIKHANDE 25
One Motion Clamping
J J SHRIKHANDE 26
Another type of clamping is referred to as One-motion methods. These are cam and clamps, wedges and
taper pins, spring stops and detents and magnets or vacuum. All of these devices have been used in the
die casting plant in various locations and many are familiar to us. These methods are shown above.
Another method for holding two components together is to interlock them. This is similar to using a
wedge, but in this case one of the components is a wedge. This technique relies on a good fit between the
mating components and a slight amount of interference.
J J SHRIKHANDE 27
This graduated scale is similar to a vernier used in measurement.
J J SHRIKHANDE 28
Visible centerlines and reference planes
In traditional setup centerlines and reference plane are not visible. In order to setup tools at the machine or
injection centerlines, tools have to be modified to find these locations.
For example, in hot chamber die casting a setup ring or collar is installed in the die at the sprue. The setup
ring fits into the nozzle hole in the stationary platen and aligns the die with the nozzle. Another method for pre-
positioning the die in the die space is to attach a bracket to the top of the die that has two V-blocks attached.
The die is dropped into the machine from the top, the V-blocks straddle the tie bars and position the die in the
machine die space.
J J SHRIKHANDE 29
Mechanization
• Mechanization is considered only after the first three techniques have been exhausted. Mechanization does not usually yield
large savings in time because most of the time saving have already been achieved by the time we get to mechanization.
• Also, mechanizing an inefficient operation is not advantageous. Think of mechanization as a process for fine tuning, not
quantum leaps in improvement. Mechanization is essential for moving large tools including large casting dies.
From the list above, all are already being done in die casting.
J J SHRIKHANDE 30
Now lets look at the setup of a self-contained hot chamber die, starting with traditional setup and
then convert the setup using SMED techniques. We will use the setup that is enumerated in Chapter
6 of the “Operating the Die Casting Machine” handbook. This setup lists 33 sequential steps
beginning with:
1. Deactivate shot 18. Heat nozzle
2. Open DCM 19. Connect cooling lines
3. Clean die mounting surface 20. Set safety ratchet
4. Clean mounting surfaces of die 21. Set deceleration
5. Insert eyebolts into die 22. lubricate die
6. Install cooling line pipes 23. Install die heating
7. Attach crane or chain fall 24. Install release spray
8. Install bumper pins 25. Close safety doors
9. Place die in DCM 26. Tighten nozzle
10. Close DCM 27. Replace shot plunger
11. Install ejector pinion 28. Set all timers and metal temperatures
12. Secure die 29. Check Hydralic lines
13. Remove crane 30. Check machine lube system
14. Check die closing 31. Turn off die heating torches
15. Set DCM stock 32. Check lock-up sequence
16. Set ejector 33. Make shot
17. Install nozzle
J J SHRIKHANDE 31
Reduction of change-over costs
Improved flexibility
J J SHRIKHANDE 34
Poka Yoke
J J SHRIKHANDE 35
All About “Poka-Yoke”
(Continuous Improvement )
Zero Defects.
• The process of Zero Defects is also known as “Mistake
Proofing” or “Fail-Safe”.
•By taking over repetitive tasks or actions that depend on
vigilance or memory, Poka-Yoke can free
workers’ time and mind to pursue more value added activities.
J J SHRIKHANDE 36
J J SHRIKHANDE 37
J J SHRIKHANDE 38
J J SHRIKHANDE 39
Errors , Defects & Failures
J J SHRIKHANDE 40
•Failures
• Now that we have understood what an Error, and a Defect are, we
can have a quick look at what a Failure means.
• A Failure, can be classically defined as a event of something failing,
in our context, it can be a product, a process, or a service.
Errors , • Failure then extending the above definition can mean an event of s
omething not working, or stopping working as expected out of
Defects &
it. Failures, Defects and Errors are what causes customer
dissatisfaction, and prevents products and services from delivering
the desired value to the customer.
Contd. •Now that we know Errors, Defects, and Failure well, it is interesting to
note that they are interrelated.
J J SHRIKHANDE 42
Definition
Poka-yoke ( ポカヨケ ) is a Japanese term that
means "mistake-proofing". A poka-yoke is any
mechanism in a lean manufacturing process that helps an
equipment operator avoid (yokeru) mistakes (poka).
A Lean
Strategy in
Human Error
Prevention.
J J SHRIKHANDE 43
Objective of Poka-Yoke
• Understand definition of Poka-Yoke add its application
in Lean management to identify & eliminate WASTE.
J J SHRIKHANDE 44
Origin of Poka - Yoke
Shigeo Shingo applied Poka-yoke in the 1960s to industrial processes designed to prevent
human errors.
In the redesigned process, the worker would perform the task in two steps, first preparing the
two required springs and placing them in a placeholder, then inserting the springs from the
placeholder into the switch.
J J SHRIKHANDE 45
Origin of Poka - Yoke
When a spring remained in the placeholder, the workers knew that they had
forgotten to insert it and could correct the mistake effortlessly.
J J SHRIKHANDE 46
Purpose of Poka-Yoke
Poka-Yoke overcome the inefficiencies of inspection through the use of automatic devices that seek to
do three things;
They do this in a number of different ways but can be categorized as being either;
Control – they take physical action to prevent a defect
Warning – They sound an alarm or light up to tell us a mistake has been made.
J J SHRIKHANDE 47
Pillars of Lean Production
System
JIT & JIDOKA
Just-in-time: making only what is needed, only when it is needed,
and only in the amount needed; though simple in principle,
requires dedication and careful, hard work to implement properly.
Just-in-time production eliminates traditional Production kind of
Waste.
It eliminates the need for maintaining large inventories, which reduce financing costs and storage costs.
JIT eliminates the waste of stock rendered worthless by changes in specifications or customer demand.
It also eliminates the waste that occurs when defects go undetected in large batches of idle inventory.
J J SHRIKHANDE 48
Pillars of Lean Production
System
JIT & JIDOKA
Jidoka refers to building quality into the production
processes.
Mechanical Jidoka is:
Autonomation
J J SHRIKHANDE 49
JIT – Continuous Flow
Product flows continuously through the manufacturing
processes
ideally one-piece at a time.
Work-in process inventory greatly reduced.
J J SHRIKHANDE 50
Enablers for Continuous Flow
Cellular ‘U’ shape Factory Layout
Multi-skilled Operators
Quick Changeover
‘SMED’
J J SHRIKHANDE 51
Jidoka – Build Quality into Processes
J J SHRIKHANDE 52
Jidoka – Autonomation
Jidoka frees the operator from watching the machine, now
one operator can monitor many machines (reducing cost).
By giving machines the ability to perform simple repetitive
tasks, then human can focus on problem-solving and
improvement.
J J SHRIKHANDE 53
Jidoka – Transferring Human
Intelligence
Defects, rework, and scrap add cost and
represent waste that must be eliminated.
J J SHRIKHANDE 54
Principle of Poka Yoke
J J SHRIKHANDE 55
J J SHRIKHANDE 56
POKA-YOKE Approach
J J SHRIKHANDE 57
Poka Yoke based on Conditions of Defect
J J SHRIKHANDE 58
POKA-YOKE Approach
Three Ways of Preventing Mistakes
When an error is predicted or detected there are three ways of preventing
mistakes:
1.Shutdown the process
J J SHRIKHANDE
59
POKA-YOKE Approach
TYPES of Poka-Yoke in Prevention
J J SHRIKHANDE
60
J J SHRIKHANDE 61
J J SHRIKHANDE 62
Poka Yoke based on points of Inspection
J J SHRIKHANDE 63
Poka Yoke for Prevention of Errors
J J SHRIKHANDE 64
Poka Yoke for Detection
J J SHRIKHANDE 65
POKA YOKE- RULES in Lean Production
J J SHRIKHANDE 66
Why mistake-proofing is important
•Lean practice does not allow extra inventory to compensate for scrap.
•Lean ideology focuses on speed ... &... speed cannot exist when
defects and rework prevail.
J J SHRIKHANDE 67
Some Background on Inspection
Traditionally, quality is inspected quality.
• Judgment Inspection: Separating good from bad after processing.
•Informative Inspection: Inspect then take action to eliminate future occurrence.
•100% or Sampling inspection based on SPC (Statistical Process Control) methodologies.
Inspection:
• assumes defects are inevitable.
• believes the process of inspection will reduce defects.
• can reinforce ‘quality’ is responsibility of the quality
department.
• is not 100% effective.
All of the above tolerate some level of defects. How do we achieve 0 defects?
J J SHRIKHANDE 68
“Self-Check” Inspection
ROI (reliance on operator inspection) emerged in the 1980’s. A self-check occurs when the
person performing the work checks the work before the work moves to the next process step.
On the upside ..
• 100% coverage is likely.
• instant learning and correction are possible.
• potentially less resistance when self-discovered.
On the downside ..
•sometimes compromises are made & proper corrective action skipped.
• blind to your own mistakes.
• compliance can be marginal if not part of standard work.
• key features, characteristics, interface relationships not always understood.
J J SHRIKHANDE 69
“Successive-Check” Inspection
A successive-check occurs when the previous work is completed and that work is
checked by the next person in the process.
On the upside ..
• often catches errors overlooked by self- checking
process.
• can build a sense of cooperation between process
participants.
On the downside ..
• corrective action still required and happens after the point of error.
• compliance can be marginal if not part of standard work.
• can create friction between workers.
J J SHRIKHANDE 70
“Special Cause” Variation
Special cause (assignable cause) variation should be attacked first. (A single
factor, with little interaction, acting on process causing a large perturbation …)
Different tools and methods are required to effectively identify and improve
common cause issues.
- PFMEA (focus to optimize process)
J J SHRIKHANDE 71
Make No Mistake
Attributes of Zero Defect quality system
• Source Inspection - Checks conditions at the source
•100% Inspection - Simple Poka-Yoke devices in place to check every time
the process occurs
• Immediate Action
- Operations stop and corrective action is taken
when a defect occurs. Teams brainstorm and
implement new devices wherever there is
Implement the best ideas after you find the root cause
• Chase through the five ‘why’s’, then ….brainstorm to get to the best
solution to attack root cause.
No more excuses! Build a culture that finds a way to do it right the first time and does
not tolerate errors!
J J SHRIKHANDE 73
Contrasting Cultures
NEGATIVE APPROACH POSITIVE APPROACH
Mistakes are Inevitable Mistakes Can Be Eliminated
• people make mistakes • create the ‘right’ environment
•
• focus on the process deficiency
place blame
• detect at final inspection • ask “why?”, then “how?”
• sampling inspection • learn from the opportunity
• • apply mistake-proofing methods
errors are inevitable
• train everyone to challenge errors
• no time, no money • show them it’s possible; share
• no support examples
J J SHRIKHANDE 75
Other Defect Causes
• Forgetfulness
• Language Barriers- (i.e. English as a second language)
• Misunderstanding instruction or procedure
• Errors in identification (e.g.: part and/or placement recognition)
• Errors made through lack of experience
• Pace (too fast or too slow)
• Lack of standards, expectations, procedure, or instructions
• Incomplete information
• Incorrect or incomplete processing (parts, dwell times, etc)
•Out of tolerance tools, fixtures, and jigs -adjustment or placement
errors
•
Inadvertent or sloppiness
•
Slowness
•
Lack of standardization
J J SHRIKHANDE 79
Defects Classification Based on priority
J J SHRIKHANDE 80
Poka Yoke Approaches
J J SHRIKHANDE 81
Poka Yoke Devices
J J SHRIKHANDE 82
Poka Yoke Devices
J J SHRIKHANDE 83
Mistake Proofing Device Example
A critical condition detector is a device that detects two
type of conditions:
1) the presence or absence of a
specific, visible pre-set quantity
such as the correct number of parts,
correct weight, height, volume or
depth
J J SHRIKHANDE 84
Mistake Proofing Device Example
How it works:
A critical manufacturing condition (pressure, current,
temperature, time, etc.) is measured -
and work cannot
proceed if the value is
not within a pre-
determined range as
indicated on the
detector.
J J SHRIKHANDE 85
Critical Condition Device Example
Fluid Element Detectors:
Detect changes in air streams occasioned by the placement or removal of objects (useful in
detecting broken drill bits).
Detect via meter relays occurrence of electric currents or secondary currents (important
applications in spot welding).
J J SHRIKHANDE 86
POKA YOKE- Usage & Examples
Control type Poka-Yoke is one that physically rejects defect whilst a
Warning type Poka-Yoke is one that sounds an alarm when you
accidentally make an error.
Control (prevention):
The floppy disc is only
able to be inserted in one
orientation.
1. Contact
2. Fixed Value
3. Motion Stop
J J SHRIKHANDE 88
Contact type POKA – YOKE
Contact type Poka Yoke devices that have physical shapes that are used to
prevent the use of incorrect components, pins that have to fit into holes from
previous operations and so on, they physically make contact with the product
and highlight when a mistake has been made or physically make it impossible to
make the mistake.
J J SHRIKHANDE 89
Contact type POKA – YOKE
J J SHRIKHANDE 90
Fixed Value Poka
Yoke
Fixed Value Poka-yoke is a method that uses physical and visual methods to
highlight that all components are available in the right quantities and have been
used, sometimes combined with contact style sensors to make them more positive.
Examples would be egg tray style
containers that present the operator
with exactly the right number of
fixings or pre-dosed medication in a
sachet rather than relying on the
user to measure from a larger
container.
J J SHRIKHANDE 91
Motion stop POKA-YOKE
These types of Poka-yoke devices ensure that the correct number
of steps have been taken and possibly also the sequence of steps.
Example of this could be the
use of a nut runner to tighten
a specific number of bolts to
a required torque;
if the correct torque is not reached or if the operator does not tighten all of the
bolts the part will not be released to the next operation.
J J SHRIKHANDE 92
Guide to Mistake-proofing
Note: This guide assumes a reactive effort (a problem already exists) Mistake-proofing should
Note be also be used in a proactive mode. Defects can be prevented by mistake-proofing products
and processes at the design stage.
Observe Observe the process and detail the steps that differ from the standard.
Refer Refer to step 4 observations; ask the 5 ‘whys’ to determine root cause.
Show Show the team the Poka-Yoke hints and examples of poka-yoke devices.
J J SHRIKHANDE 93
J J SHRIKHANDE 94
J J SHRIKHANDE 95
Combining Lean And Variation
Reduction
Start with an FMEA
This organized approach will identify potential problems
that can be addressed with mistake proofing activity.
Process maps
can also be
beneficial.
Understanding the
inputs and
outputs can help
identify specific
solutions.
J J SHRIKHANDE 98
Service and Administrative Examples
Approved parts database which only allows approved parts to be on the
BOM - Control (preventative)
•On line forms with required fields - Can’t complete task without complete
info in correct format
J J SHRIKHANDE 99
Supply Chain Example
J J SHRIKHANDE 100
J J SHRIKHANDE 101
J J SHRIKHANDE 102
J J SHRIKHANDE 103
J J SHRIKHANDE 104
Type of Errors
J J SHRIKHANDE 105
J J SHRIKHANDE 106
POKA-YOKE Summary
Poka-Yoke: A Japanese mistakes avoid (poka-yokeru) methodology to
eliminate product defects by preventing, correcting, or drawing attention to
human errors as they occur
J J SHRIKHANDE 107
POKA-YOKE Summary
Every inspection method has weaknesses.
J J SHRIKHANDE 108
Lean Six Sigma
J J SHRIKHANDE 109
J J SHRIKHANDE 110
Synergy of Lean and Six Sigma
# of
±3s ±4s ±5s ±6s
Steps
Lean reduces non-value-add steps 1 93.32% 99.379% 99.976% 99.999%
Quantitative Analysis
Plan
Voice of
Customer Focus
5S
Waste Elimination
Performance
Flow
Data Collection & Presentation
Value &Waste
Layout
Heijunka ( Levelling )
Do Check Act
Zero Defects
Performance Dashboards
PDCA Checklists
Problem Solving
Employee Involvement
Seek Perfection
Scientific Methods
Focus on Variation
Pull Systems &Kanban
Statistical Methods
Quality First
Are you •If your answer to any of these question is ‘YES’ you are
ready for six sigma.
ready for Six
sigma? • Do you have a sense of dissatisfaction over the present state
of your organization?
• Are your customers often dissatisfied with your quality /
price / delivery ?
• Do you face a threat from incoming competition?
• Are you losing your market share?
• Are your costs high?
115
What is Six sigma?
• Six sigma is a problem solving technique
• Six sigma is a statistical tool
• Six sigma is nothing but “Excellence” in whatever
we do
• Six Sigma means accuracy
• Six sigma means low variation
• How it is different?
• Six sigma gives more benefits
J J SHRIKHANDE 116
Commonalities
Continual Improvement
Process Approach
J J SHRIKHANDE 117
6
Invented at Motorola
119
The Role of
measurement
• IF WE CANNOT EXPRESS WHAT WE KNOW IN
THE FORM OF NUMBERS, WE REALLY DON’T
KNOW MUCH ABOUT IT
PROCESS
Smooth curve
Center of the bar interconnecting the center
of each bar
J J SHRIKHANDE
Units of Measure
122
NORMAL DISTRIBUTION - PROPERTIES
If we know the average () and variation () of normal distribution then we can
explain every thing of the distribution or process:
J J SHRIKHANDE 123
UTILIZING THE
SIX STEPS TO
SIX SIGMA
AVG.
-6 -5 -4 -3 -2 -1
68. 26%
+1 +2 +3 +4 +5 +6
95.44%
99.73%
99.9937%
99.999943%
99.9999998%
J J SHRIKHANDE 124
LONG TERM AND SHORT TERM
SIGMAS
Cumulative Cumulative
long-term short-term
capability capability
- ZL Zu +
J J SHRIKHANDE 126
Improvement Scale
Process Defects per million No. of times
Yield
capability opportunities improvement
22
308 537
308 537 69.2%
69.2%
4.6 times
66807
3
3
93.3%
66807 93.3%
11 times
4 6210 99.4%
4 6210
0 99.4%
26 times 99.98%
55 233
233
99.98%
6 3.4 68 times 99.9997%
6 3.4 99.9997%
J J SHRIKHANDE 127
A 4 company
• Profitable and growing
• Market prices declining
• Competitors increasing
• Has a ‘ Q ‘ assurance program
• Spends 10 - 20 % of sales on rework & rejection
• Unaware that best-in class companies have similar processes
100 times better
• Believes Zero defect goal is neither realistic nor achievable
• Has 10 times the number of suppliers required to run the
business
• 5 - 10 % customers are dissatisfied
J J SHRIKHANDE 128
1. Why we chose Six sigma ?
Climbing the steps
World class
Design for
manufacturability
Six Sigma 3.4 ppm
Advanced Statistical
Analysis Five Sigma 233 ppm
Low
Average Four Sigma 6210 ppm Hanging
Processes Team work, Reviews and
Three Sigma 66807 ppm Problem Solving
697672 ppm
One Sigma
J J SHRIKHANDE 129
Cycle time reduction...
Value Addition
Manufacturing
Engineering
Design
Sales / Marketing
J J SHRIKHANDE 131
May18th, 2005
Change in Thinking Customer
Despatch /
New Thinking Logistics
Manufacturing Customer
Engineering Customer
J J SHRIKHANDE 132
May18th, 2005
To be more proactive….
Steps followed :
• Define
• Measure
• Analyze
• Improve
• Control
• Continually improve
J J SHRIKHANDE 134
Customer Satisfaction Requirements
J J SHRIKHANDE 135
FOCUS ON TOTAL
DEFECTS PER UNIT
REDUCES THE CYCLE REDUCES WIP REDUCES DELIVERED REDUCES EARLY LIFE
TIME PER UNIT INVENTORY CARRYING DEFECTS FAILURE RATE
COSTS
J J SHRIKHANDE 136
REASONS FOR
IMPROVING
QUALITY
• BUSINESSES WHICH HAVE ACHIEVED SIGNIFICANT
QUALITY IMPROVEMENT EARN 8% HIGHER PRICES.
J J SHRIKHANDE 138
DEFINING A UNIT
J J SHRIKHANDE 139
THE COMMON METRIC:
J J SHRIKHANDE 140
DEFINING A UNIT & Defect
'unit’ Defect
Number of equipment ------- Rework Type
Line of software / harness ------- Mistake
Purchase Order raised ------- wrong / missing entry
Invoice -------------------- Payment beyond 60 days
Freight cost paid ------- Cost more than certain amt.
Inventory every week -- Beyond a target value
Job time card punched-- wrong code / missing code
J J SHRIKHANDE 141
Sigma level for error in PO
500 POs are checked.
Defects ( mistakes) = 10
Total POs = 500
Defects per unit ( DPU) = 10 / 500 = 0.200
No. of opportunities per PO (O) = 5
Total no. of opportunity (5 x500) = 2500
Defect per opportunity (DPO) = 10 / 2500= 0.0040
Defect per million opportunities (DPMO) =DPO x 106
=4000
Zlt = 2.65
Zst = 2.65+ 1.5 = 4.15 SIGMA LEVEL
J J SHRIKHANDE 142
Normal Table
Z DPO Z DPO
4.1 0.0000208 5.1 0.000000180
4.2 0.0000134 5.2 0.000000107
4.3 0.00000862 5.3 0.0000000627
4.4 0.00000548 5.4 0.0000000366
4.5 0.00000345 5.5 0.0000000212
4.6 0.00000215 5.6 0.0000000122
4.7 0.00000133 5.7 0.00000000698
4.8 0.000000818 5.8 0.00000000396
4.9 0.000000419 5.9 0.00000000223
5.0 0.000000300 6.0 0.00000000125
6.1 0.000000000694
J J SHRIKHANDE 144
J J SHRIKHANDE 145
The tools and skills that help in the implementation of the DMAIC method include:
• Process mapping which helps to identify the order of events in producing a product or service and compares
the "ideal" work flow to what actually happens.
• Failure mode and effect analysis which helps to identify likely process failures and minimises their frequency.
• Statistical tests which assist in the separation of significant effects of variable from random variation.
• Design of experiments which is used to identify and confirm cause and effect relationships.
• Control plans which allow for the monitoring and controlling of processes to maintain the gains that have
been made.
• Quality function deployment which is a tool for defining what is important to customers; it enables better
anticipation and understanding of customer needs.
• Enterprise resource planning which uses special computer software to integrate, accelerate and sustain
seamless process improvements throughout an organization.
J J SHRIKHANDE 146
Lean Usage
Lean vs. Six Sigma
Methodology
Strengths
Six Sigma • True VOC is • Confirms Data • Data Driven • Few Tools to • Few Tools or
Powerful Quality Analysis Create Change in Direction
Critical X’s
Lean • Value Stream • Standard Work • Observation and • Many Tools for • Communicative
Mapping . . . & Target Intuition Based Driving Change • Centered on Stable,
Boundaryless & Sheets . . . Analysis . . . PQ, • Mixed Model Plan, Repeatable Process
Multi-Generational Assumes Data PR, TAKT Time
Kan Ban, Visual • Automation
is Good
Management
J J SHRIKHANDE 147
J J SHRIKHANDE
• Proven success: A plethora of statistics has claimed that Six Sigma can uplift
a company’s sales volume, stock value, and employee growth if it has been
implemented the method properly. An eminent company like GE enjoyed
$8 billion in savings during the first three years because it has adopted and
used the Six Sigma program wisely.
Six Sigma • Enhance the profit: By implementing Six Sigma methodology, you can uplift
your profit and at the same time can reduce the costs. Thus, improvements
achieved are directly related to financial results.
• Prevents innovation: Six Sigma gives priority on the rigidity of the process which basically gainsays the innovation,
kills and the creativity. The innovative approach implies deviations in production, the redundancy, the unusual
solutions, insufficient study which are opposite to Six Sigma principles.
• Expensive: If you are planning to implement Six Sigma approach to your company, then you need to spend a
humongous amount. Because you need to provide training to your employees specially related to Six Sigma
methods. This training is quite expensive and will burn your pocket.
• Complicated: Six Sigma model requires a significant amount of statistical data gathering and analysis. The process
is intricate and time-consuming. That’s why smaller businesses are not very much inclined to this approach
because they find it is very complicated to sustain for long periods of time and give up on six sigma as a potential
business model for their company.
• Total participation is required: If you want to employ Six Sigma, then the total cooperation of the company is
needed. If the entire company is not on board, success is not likely. In large companies, getting the entire staff on
the same page can be a difficult process.
149
Strengths of Lean
A Decrease in Cost:-Lean management is all about maximizing profits. While the selling price is impacted by various factors that could
depend on product qualities or markets, usually companies can do more to control their costs, and lean practices help to decrease costs
so that all savings can be added to profit.
Improves customer interactions:- Lean management began with the customer’s viewpoint in mind. The way they communicate with
staff, responsiveness to their concerns, and their experience with the product are some of the leading drivers of cutting wasteful
practices. If customer surveys are skewing a certain way, then leaders should pay attention to what the company can stand to lose. As a
result, customer interactions and overall service should improve.
Utilization of “Push and Pull”:- Company expenses can become inflated if leaders are not paying attention to how inventory is piling up.
A strategy that can help manage this is having a “pull” over a “push” mentality. This means that later production stages determine what
is happening in earlier processes. This can help companies prevent the problem of overproduction and paying a higher carrying cost.
Companies will only order what they need.
Increased Quality:- Lean management is also about a great deal of attention being paid to details. The goal is to decrease the number of
defects and reworks in products. This action means that processes will be optimized to avoid mistakes which saves time that workers will
have to take to remake products, and the money needed to pay them for the labour.
An Improvement Culture:- When a company understands the importance of lean management and begins to implement the strategies,
then a new way of thought begins to take over in the company. Workers are more open to improvement and are looking for ways to
consistently make the work they do even more impactful. Introducing teams to lean management can create a culture that values daily
improvement.
Increased Employee Morale:- Since lean management favours an approach where managers are in regular communication with
employees about their work and their process, employees could feel they are empowered to make better decisions. Workers know
where they stand and where they can improve to create quality work.
J J SHRIKHANDE 150
Weaknesses of Lean
The Problem of Inventory:- Traditionally, in lean management implementation, low amounts of stock are kept on
hand to decrease carrying costs. This causes companies to depend on suppliers and hope they are able to make the
adjustment to deliver goods quickly and efficiently. If there is any disruption of inventory processes, then it can
derail the company.
Difficult to Change Over:- Employees may not always be welcoming to lean management practices. The
implementation of this style will take a lot of patience and a complete overhaul to work processes. This may not be
something longer-tenured workers will be comfortable with. Therefore, leaders have to be transparent about all
changes that will happen in the company. There also has to be some time allowed for inquiries from workers who
are not yet sold on the switch.
High Implementation Cost:- Most of the time, when lean management is implemented in a company that has
never before used it, it is likely that all systems and production processes will have to end in their current state. This
event can bring high costs for companies who are not prepared for the increased expenses of bringing in new
equipment and training programs.
The Temptation to Over-Structure:- Everything might not need an overhaul. The challenge for leaders is to
determine what needs to be incorporated into lean management and what does not. Leaders can push the
processes beyond what they may be able to yield, so understanding the impact of incremental changes is key here.
J J SHRIKHANDE 151
• Actively Supports Implementation of Lean Six Sigma
Sponsor • Provides necessary Budget
J J SHRIKHANDE 152
DMAIC: Define the Project
Define the project’s purpose and scope. Collect background information on
the process and your customers’ needs and requirements.
IV - Continuously Enhance
* Incentive packages ___
the Quality of Faculty and Improve Recruitment
* Time to fill open reqs ___
Staff
Gather information on the current situation to provide a clearer focus for your
improvement effort.
0
991 992 993 994 995 996 997 998 999 000 001 002 003 004 005
1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
J J SHRIKHANDE 154
DMAIC: Measure the Current Situation
Gather information on the current situation to provide a clearer focus for your
improvement effort.
A Control
Chart is used
to detect and out side
s it
Point ntrol Lim
monitor
pper Co
variation over U
time.
J J SHRIKHANDE 155
DMAIC: Measure the Current Situation
Gather information on the current situation to provide a clearer focus for your
improvement effort.
J J SHRIKHANDE 156
DMAIC: Measure the Current Situation
Gather information on the current situation to provide a clearer focus for your
improvement effort.
If we remove 1991-2005 Faculty Turnover Rate
the “special (excluding early retirement years 2001-2002)
cause” early 20
retirement
program years
of 2001 - 2002, 15
% Turnover
our trend is
actually
10
downward.
5
But is the
process
stable? 0
Gather information on the current situation to provide a clearer focus for your
improvement effort.
The Control Chart
still indicates an
unstable process
with points too
close to the Upper
and Lower Control
Limits.
J J SHRIKHANDE 158
DMAIC: Measure the Current Situation
Gather information on the current situation to provide a clearer focus for your
improvement effort.
A Histogram
measures the
process’s
ati de
capability of
s
ific tsi
on
meeting the
ec ou
customer’s
Sp ints
specifications.
Po
Our process is
not capable, as
there is too much
variation.
J J SHRIKHANDE 159
The Target and Customer Specification values are examples based on peer reports.
DMAIC: Measure the Current Situation
Gather information on the current situation to provide a clearer focus for your
improvement effort.
J J SHRIKHANDE 160
DMAIC: Measure the Current Situation
Gather information on the current situation to provide a clearer focus for your
improvement effort.
In Good To Great, author Jim Collins mentions the need for a BHAG
or Big Hairy Audacious Goal. Using Six Sigma as a guide, you can
measure your current performance and set a BHAG of reaching the
next level sigma.
J J SHRIKHANDE 161
DMAIC: Measure the Current Situation
Gather information on the current situation to provide a clearer focus for your
improvement effort.
A Pareto Chart
helps you break 2005 MCG Faculty Turnover
down a big 95% 98%
problem into its 64 91% 100%
86%
parts and 56 80%
Terminations
70% 80%
identify which 48
are the most 40 52% 60%
important. 32
24 30% 40%
“Voluntary
Collegiate 16 19 20%
Employment 8 14 12 6 4 3 3 2 1
Elsewhere” 0 0%
caused 30% of
the Faculty
turnover, and
“Involuntary
Non-Reappoint-
ment” caused
22%.
Reasons
J J SHRIKHANDE 162
Pareto Principle: 80% of the problems are caused by 20% of the contributors.
DMAIC: Analyze to Identify Causes
Identify the root cause of defects. Confirm them with data.
Why?
Why?
Why? Why?
Why? Why?
Why? Why?
Why? Why?
Why? Why?
People Technology
J J SHRIKHANDE 163
DMAIC: Improve
Develop, try out, and implement solutions that address the root causes. Use
data to evaluate results for the solutions and the plans used to carry them out.
A Countermeasures chart is used to identify potential solutions and rank them for
implementation.
During 2005, "Voluntary Collegiate Employment Elsewhere" accounted for 30% of
Problem Statement: Faculty Turnover.
Value ($/period)
Action (Who?)
Effectiveness
Feasibility
Overall
Countermeasure/
Root Cause Proposed Solutions Specific Actions
0
0
0
0
0
0
0
0
0
0
Feasibility: 1-low, 5-high Effectiveness: 1-low, 5-high
1-Expensive & Difficult to implement 1-Not very effective
5-Inexpensive and easy to implement 5-Very Effective
J J SHRIKHANDE 164
DMAIC: Control
Maintain gains that you have achieved by standardizing your work methods
or processes. Anticipate future improvements and make plans to preserve
the lessons learned from this improvement effort.
Before After
Before After Good
} Improvement
}Improvement
}Remaining Gap
A1 A2 A3 A4 A2 A1 A3 A4 Countermeasures Target
implemented
J J SHRIKHANDE 165