ACI PRMIO PLASTIC Maintenance Dept Presentation On Performance Meeting-April21
ACI PRMIO PLASTIC Maintenance Dept Presentation On Performance Meeting-April21
ACI PRMIO PLASTIC Maintenance Dept Presentation On Performance Meeting-April21
Presentation
Presentationon
onPerformance
Performancereport
reportof
of
Maintenance Department April”-2021
Maintenance Department April”-2021
1
Overview of Maintenance Department, April21
Sl. Particulars unit Std. April-21 February-21 Growth with STD Growth in %
1 Total Manpower Nos 30 27 30 -10% -10%
2 HR Cost per KG Tk/Kg 0.5 1.24 0.77 148% 61%
3 Maintenance Cost per KG BDT 0.25 0.32 0.33 28% -3%
4 KPI Achievement % 95% 74% 72% -22% 3%
5 Machine Breakdown Hour 110 279 285.3 154% -2%
6 Preventive maint. IMM Nos 33 28 33 -15% -15%
7 Preventive maint. Auxiliary Nos 41 26 27 -37% -4%
8 KAIZEN Work Nos 8 5 5 -38% 0%
9 Compliance Audit Nos 2 1 1 -50% 0%
10 No. of Training taken Nos 5 3 4 -40% -25%
11 No. of Training given Nos 2 1 1 -50% 0%
12 No. of Meeting Nos 2 1 1 -50% 0%
13 Number of Accident Nos 0 2 (minor) 2 (minor) 200% 0%
2
Manpower Overview of Maintenance Department
Maintenance manpower Manpower overview
Category/Position Manpower Category Manpower
Asstant Manager 0 Staff 17
Engineer 1 Contractual 1
Asst.Engineer 3
SIC 1
Casual 9
Trainee Engineer 0 Total 27
LIC 3
Sr. Mechanics 4
Mechanics 1 Total HR 27
Asst. Mechanics 5
Electrical Forman 1
Total Salary BDT 543,813.00
Sr Electrician 1 Total Incentive BDT 120,773.00
Electrician 2
Asst. Electrician 1 Total Reward/Bonus BDT 70,468.00
Sr. Welder 1
Chiller Foreman 1 Total HR Cost: BDT 735,081.00
Chiller Operator 1
Asst. Chiller Operator 1 Per KG HR Cost (TK/Kg) BDT 1.24
Total 27
3
Improvement Areas
Hydraulic oil consumption reducing gradually.
We have provide Sieving machine, water separator tray and chips dryer unit
5
Repair Maintenance cost April,2021
Overview
Maintenance Cost Report April -2021 Running and Preventive Maintenance Cost Overview,
Category Apr-21 % April,2021
Electrical Item BDT 35,435.60 19% stationery
Grease
Local
ImportRepair Preventive Maintenance
Spare Parts
[PERCENTAGE]
[PERCENTAGE]
[PERCENTAGE] 3% Electrical Item
Mechanical Item BDT 8,775.50 5%
Lubrication oil
1%
18%
6
Maintenance Dept. cost-Overview
300,000
250,000
200,000
150,000
100,000
50,000
-
February March April
7
Hydraulic oil cost April,2021
Overview
Row Labels Sum of Total Cost
D3-1200T 31,960
D2-750T 18,800 Hydraulic Oil consumption machine wise-April21
35000
C1-500T 8,225
B4-260T 8,225
30000
C3-400T 7,050
A2-400T 7,050 Conssumption Amount In BDT 25000
C9-250T 4,700
E1-658T 4,700 20000
D4-2200T 4,700
C8-120T 4,700 15000
B6-368T 3,525
D1-750T 2,350 10000
A6-400T 2,350
A4-160T 2,350 5000
B1-260T 2,350
Grand Total 113,035 0
8
D3-1200T D2-750T C1-500T B4-260T C3-400T A2-400T C9-250T E1-658T D4-2200T C8-120T B6-368T D1-750T A6-400T A4-160T B1-260T
Hydraulic & Lubrication oil cost
April,2021 Overview
Row Labels Sum of Total Cost Hydraulic Oil Consumption overview
Leakage from Mold Cylinder 6,110 Oil leakage from core line
Drain from Mold
Oil drain from valve/nipple 4,700 Leakage from Mold Cylinder
Oil drain from valve/nipple
Hydraulic pipe damage 3,525 Drain from Mold
28%
Oil leakage from core line
57% Hydraulic pipe damage
Oil leakage from pump
9
Hydraulic oil cost Comparison
100,000
86,880
80,000
60,000
40,000
20,000
-
February March April
10
Nozzle heater cost April,2021
Overview
11
Nozzle heater cost April,2021
Overview
Row Labels Sum of Total Cost
C8-120T 1,280 Nozzle heater consumption overview
C4-468T 840
C1-500T 660 C8-120T
C4-468T
B7-160T 605 A4-160T E1-658T
C1-500T
C9-250T 4% 4% C8-120T
A5-120T 460 B4-260T 4% 22% B7-160T
4%
D1-750t 400 D3-1200T A5-120T
4% D1-750t
A6-400T 325 A6-400T
A6-400T
6%
D3-1200T 250 D3-1200T
B4-260T 240 B4-260T
D1-750t C4-468T C9-250T
C9-250T 240 7% 15%
A4-160T
A4-160T 240 E1-658T
A5-120T
E1-658T 220 8%
C1-500T
B7-160T
Grand Total 5,760 11%
11%
12
Nozzle Heater cost Comparison
Consumption Amount BDT
February; 8,245
9,000
8,000
March; 6,630
7,000 April; 5,760
6,000
5,000
4,000
3,000
2,000
1,000
- February March April
13
Preventive maintenance April,2021
Overview
35
Preventive Maintenance
30 Target vs. Achievement
25 April, 2021
20
15
10
0 IMM Chiller and Crane Tool Room M/C Mixture & Recycling M/C Printing Machine Fire Hydrant & AC
Target Achievement
14
Preventive maintenance February to April
Comparison
35
Preventive Maintenance
30 Target vs. Achievement
25 April, 2021
20
15
10
0 IMM Chiller and Crane Tool Room M/C Mixture & Recycling M/C Printing Machine Fire Hydrant & AC
15
Machine Downtime April,2021 Overview
Machine Name Downtime (HOUR)
C9-250T 69 IMM machine Down Time- April-21 (Top machines)
D5-450T 22 C5-250T A1-260T
B5-250T 3%
D1-750 18 D2-750T 4%
4%
D3-1200T 15 4% C9-250T
B6-368T 31%
D6-250T 15 4%
C1-500T 13 B4-260T
4%
C4-468T 11 C7-120T
4%
C7-120T 10
B4-260T 9
B6-368T 9 C4-468T
D2-750T 9 5%
B5-250T 8
C1-500T
C5-250T 8 6% D5-450T
10%
A1-260T 7 D6-250T
7% D1-750
D3-1200T
8%
7%
Previous Present
Maintenance meeting and
Training of April,2021
Training on “Health, safety and
Environment management”
18
KAIZEN work Overview, April,2021
19
Introduce Chips dryer unit by in-house technology.
23
Siemens PLC of Chillier 100TR repaired & modify
We have to depend on only We have found chiller PLC To get rid of this problem,
100TR Chiller can't
200TR chiller by this time. internal optocoupler Supplier charged around 80K
run due to Chiller I/O
malfunctioning. BDT and they want to replace
malfunctioning. If anything happen in
200TR, then all plant will the PLC
PLC 3 pieces optocoupler
PLC is malfunctioning come to stop as 100TR has changed from unused We have solved it internally
chiller stop. port and saving cost
Electronics items Repaired List of April,2021
Electronics items List Repaired last month
Repair cost from out
Sl Motor Qty (pes) side (per unit) Total Cost Repair Cost Saving
1 UPS 3 1800 5400 1800 3600
2 Chiller PLC repair 1 8000 8000 200 7800
3 Re-M/C CPU unit repair 1 8000 8000 200 7800
4 LED light Chip 58 400 23200 8120 15080
5 Mold temperature Control Card 20 500 10000 2800 7200
6 Motor rewinding Works 4 3000 12000 4800 7200
7 Auto-loader Repair 3 5000 15000 4800 10200
8 Electric drill machine 1 500 500 120 380
9 Power supply Card 3 800 2400 420 1980
Total 94 84500 23260 61240
Electrical & Fire Safety Report-
April-21
Safety & Compliance Report-April-21.
Power supply board was used by using carton tape. Now power supply is repaired.
Anyone can get electrical shock.
Safety & Compliance Report-April-21.
Circuit breaker was not properly fixed and there was Now we fix breaker properly with safety cover.
no cover in front of breaker
Development planning and execution