Professional Documents
Culture Documents
M7 Training Material (Basic) V3.0 en
M7 Training Material (Basic) V3.0 en
M7 Training Material (Basic) V3.0 en
System overview
Installation
Software
Hardware
Preventive maintenance
Introduction of M7 series
Appearance
Configuration
Mobile trolley
V01.00.00-V08.xx.xx
M7Vet old M7 version
In production
V09.00.00
Old M7 version New M7( Premium) version
Display
Control panel
Handel
Probe port
Transducer
locking lever
S-Video
I/O extend port Power input port USB port Network port
Standard Configuration
Main unit
Accessories
* Operator’s manuals (basic and advanced)
* Ultrasound gel
* Power adapter and connecting cable
* Batteries
* Multilingual controls overlay
* Travelling case
2 CW module Hardware
Need KEY(lower than V09.00.00)
3 Wireless adapter NOT need KEY(V09.00.00 or higher)
11 Pack /
12 Dust-proof cover /
ECG-21(only can be applied
13 ECG module with I/O Extend Module
configured)
Probe model
M7
Premium Configuration
UMT-300 + Power Module + DVD R/W + PEM-21
+External LCD
Standard Configuration
UMT-300 + Power Module + DVD R/W + PEM-21
UMT-300 + Power Module + PEM-21
UMT-300 + Power Module + DVD R/W
Lite Configuration
UMT-300 Only
UMT-200
System overview
Installation
Software
Hardware
Preventive maintenance
Place the system with accessories in a proper position so that users can
operate it conveniently. Maintain a clearance of 20cm around the
system, so that heat can radiate effectively.
Machine Dimension:
361mm(W)×357mm(D)×75mm(H)
Package Box Dimension:
675mm(L)×565mm(W)×530mm(H)
Net weight:
About 6.33 Kg
Gross weight:
28 Kg
Serial Number
Packing List
iDock*
Middle Foam
Combination lock
Locks Locks
External Adapter
CAUTION: You must turn off the ultrasound system before connecting or
disconnecting the probe extend module. Otherwise the system may be damaged.
This ECG module only can be connected to M7 through IO Extend Module (iDock)
35 © 2011 Mindray Confidential
Installation-Peripheral
Footswitch(USB port)
Print Freeze
DVD-RW
1 Samsung SE-S184M
2 Samsung SE-S204N
3 BenQ DW2000
4 LG GSA-E60L
5 Philips SPD3000CC
6 And more…
System overview
Installation
Software
Hardware
Preventive maintenance
iStation
Setup
Recovery
Send to
Default Data
Source
Note: Choose the date source, i.e. CD-drive , select patients, click “restore”, selected
data will go to system default database.
47 © 2011 Mindray Confidential
Software-Setup
Press “Setup”
Hospital info, language, time, storage
format, screen saver, end-exam setting,
key config, options
End-exam setting
Screen saver
Patient management
Recovery types
Recover OS and Ultrasound application software together.
Recover Ultrasound application software only.
Recovery procedure
Step 1 - Data Backup
Step 2 – Make the Recovery Disk
Step 3 –Software Recovery
Step 4 – Verification
For more detailed steps, please refer to System Recovery Guide below.
Difference of M7 Version
Version old M7 new M7(Premium)
( lower than V09.00.00 ) ( V09.00.00 or higher )
Windows XP machine can be upgraded to Windows 7 operating system, the Windows 7 OS license sticker
(115-028458-00) must be ordered in this case
Notes 1. the old M7 Version is NOT compatible with the new M7 Premium Version in both Operating System and application software
2. BIOS setting of new CPU is NOT needed when OS Recovery, please refer to M7_System Recovery Guide
3. M7Vet does NOT have Premium version
※how to
distinguish
Model M7/M7Vet M7 M7 Premium SSD and
HDD in M7
Premium
version :
Doppler V1.00.00-V05.00.00 V06.00-V08.XX.XX V09.00.00 or higher
Difference of
Windows XP Windows 7 Windows 7 SSD and HDD in M7 Premium
OS ( V5.0/V6.0/V7.0 ) (V1.xx.xx) (V2.00.02 or higher)
Color of
trackball
clamping
ring
Corner of
monitor
NOTE : the old M7 Version is NOT compatible with the new M7 Premium Version in both Operating System and ultrasound application
software, conversion is not available
65 © 2011 Mindray Confidential
Software-Software recovery
How to distinguish old and new CPU module
Old CPU(SU9300 , Radisys PC) New CPU(BayTrail PC) ※
Sort 801-2118-00011-00 ( 023-000068-00 ) 115-044556-00 (051-002899-00)
SAP info
Difference of
old and new CPU
About-System information-about detail: About-System information-about detail:
Operation system1.00.7 or none Operation system1.00.10 or higher
System info
Appearance
Notes 1. the compatibility with the OS is different for the two sorts of CPU
2. BIOS setting of new CPU is NOT needed when OS Recovery, please refer to M7_System Recovery Guide
Method:
System overview
Installation
Software
Hardware
Preventive maintenance
Overall Structure
Module picture and schematic diagram
Transmission
board
Main board
CW board
Outlet Fans
Inlet Fan
Power Supply
module
To Main Board
Scan
sequence c B
o o
c B High n a
o o Communicate n rd Main
n a Transmit voltage e -t
n rd Drive c
t board
Main e control bus control pulse o
c -t circuit s -b front-
board t o Clock FPGA output o o
s -b c a end
front- o circuit k
e rd
c o 4-channel t
end k a
e rd PHV
t
Transmitting
A12V/A-12V board
/A5V/A-5V
/A2.8/A1.5
Functions:
Switch between physical transmitting/receiving channels and the probe ‘s elements
TGC
Echo receiving
Probe port system
Scan
Communicate sequence
Transmitting channel
control bus Transmitting
board
Functions:
Support to isolate the transmitting high voltage, for protecting the receiving
circuit from high voltage damage.
TGC
Echo receiving
Probe port system
Scan
Communicate sequence
Transmitting channel
control bus Transmitting
board
TGC
Echo receiving
Probe port system
Scan
Communicate sequence
Transmitting channel
control bus Transmitting
board
Functions:
Digital echo signals are sent to DSP FPGA for signal processing after FPGA
beam-forming. The finally generated signal (one frame of image) will be
uploaded through PCIE_PHY for signal processing in the CPU.
DSP
FPGA BF
FPGA
TGC
Echo receiving
Probe port system
Scan
Communicate sequence
Transmitting channel
control bus Transmitting
board
co
n B
I n o
e a Main
ct rd
Low-pass in -t board
ADC g o
filter -b front-
s o
Digital o a end
c rd
echo Demodulation k
c e
o B filter t
n o
n a
e rd
c Low-pass c
tin -t ADC LNA o B
Main oControl filter n o
g -b n a
board s osignal e rd IO
o a Q c Pencil
c ti -t front
front- ke rd n o
g -c probe
end t s a panel
Clock CW pulse o b
transmitting ck le
e
board t
A12V/A5V/A
-5V/A3.6V
CW board
4D Board
Functions:
4D drive signal power amplification;
Provides 4D probe Hall signal return channel
Amplify and acquire TEE temperature and angle signals.
D12V/D-12V D12V/D-12V
/D5V/D-5V
Voltage
/D3.3V
control
co
n B
n o
e a DAC
Main ct rd Motor drive
board in -t Signal Power signal c
g o o B
front- -b amplify amplify n o
so o n a
end ck a e rd Probe
rd c
e Communicate 4D probe Hall backward signal tin -t convert
t g o
control signal TEE -c ing
s
o a
support c b board
Tem/angle k le
Low-pass signal e
ADC Detect and t
filter
amplify
128G SSD
1TB HDD
Panel Board
Silicon keypad
TGC Adjustment Board
Optical Trackball
Buzzer
VGA
Digital power
Analog power
AC Adapter
Auxiliary Power
Board
Main Power
Board
5VSTB_EN#
Power
5VSTB_OK# supply
POWER_ON# module
CPU_12VOK#
AC 12V
Adapter
Main board
5VSTB_EN#
Power
5VSTB_OK# supply
module
POWER_ON#
CPU_12VOK#
Main board
11.1V
Batteries
System overview
Installation
Software
Hardware
Preventive maintenance
Flow of cleaning
Clean the system or peripherals
General Check
System Function Check
Electrical Safety Inspection
Clean monitor
Clean trackball
Clean probes
Clean holders
Clean cover
Use soft dry cloth or soft brush to wipe out the dust or stain
Use soft dry cloth with a little soapy water(clean water) to wash out
remained stain (for interior structure, we should use soft brush to clean
it )
Lens
Small ball (3)
Waterspout
Buckle (2)
For peripherals such as printer, foot switch, bar code scanner, you
can do the cleaning maintenance according to the service manual if
it’s necessary.
No. Content
3 Device Labeling
5 Earth Leakage
For scheduled inspection and unopened repair type, item 1,2,3 should be
performed.
For opened repair type, not modify the power part including transformer or
patient circuit board, item 1,2,3,4,5 should be performed.
For opened repair type, modify the power part including transformer or
patient circuit board, item 1,2,3,4,5,6,7,8 should be performed.