Implementing Quality Management System Under ISO 9001:2015 in The Central Environmental Authority

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 16

Implementing Quality

Management System under


ISO 9001:2015 in the
Central Environmental Authority
Central Environmental Authority
Scope of the quality management system
Provision of environmental pollution control, waste &
hazardous waste management, air quality & laboratory
services, environmental impact assessment, natural resources
management, research and development, environmental
education & awareness, dissemination of information,
environmental promotion, law enforcement, resolving public
complaints, and compliance monitoring.
Documents related to the QMS system

• Quality System Manual;


• b. Quality Procedure Manual;
• c. Processes;
• d. Guidelines;
• e. Quality Objectives;
Implementing QMS
under ISO 9001:2015 in the
EIA unit
Risk Analysis
ISO 9001:2015 system
Objective of EIA unit
• Reduce the previous 3 year’s average time
duration between the date of scoping meeting
held and date of TOR issued by 2%
• To determine the adequacy of study reports
within 14 working days after the draft report is
received
• To carry out EIA compliance monitoring at
least once a year for projects under
construction
Objectives
Objectives…..
Processes- EIA Unit
• Process for Screening of Basic Information
Questionnaire (BIQ).
• Process for scoping
• Process for receipt, evaluation and review and
the approval of the EIA/IEE study
• Process for Compliance Monitoring of
approved projects
Process for Screening of Basic Information Questionnaire (BIQ).
• Purpose
This process is to determine whether a proposed development project is
a prescribed activity requiring environmental approval and to determine the
appropriate project approving agency (PAA) as per the provisions made under the
National Environmental Act (NEA).
• Scope
The screening process is applicable only, if the BIQ is checked and accepted
by the CEA.
• Responsibility
Director, Deputy Directors (DDs), Assistant Directors (ADs), Senior Environmental
Officers, (SEOs), Environmental Officers (EOs), Management Assistants (MAs) and Office
Assistants (OAs).
• Inputs: Request letter by project proponent (PP) and BIQ application.
• Outputs: Notification of the appropriate PAA.
• Process
• Reference
• KPIs: Number of application screened, number of projects referred to other
PAAs/POs, number of letters issued to the PPs to inform that project is not
prescribed.
Process for scoping

• Purpose
This process is to identify the issues and the impacts that are likely to be
important for the EIA/IEE study and to determine the projects requires the
IEE study or the EIA study.
• Scope
This process is applicable to all the scoping activities of the
EIA/SEIA/IEE/SIEE studies done by the EIA unit of the CEA.
• Responsibility
Director, Deputy Directors (DDs), Assistant Directors (ADs), Senior
Environmental Officers, (SEOs) Environmental officers (EOs),
Management Assistants (MAs) and Office Assistants (OAs).
• Inputs: Information on the scope of the proposed project.
• Outputs: Terms of reference for EIA/IEE study.
• Process
• Reference
• KPIs: Number of scoping meetings, number of inspections and number
Process for receipt, evaluation and review and the approval of the EIA/IEE study

• Purpose
This process is to receipt, evaluate and review the EIA/IEE/SEIA/SIEE
report received from the Project Proponent (PP).
• Scope
This process is applicable to all the EIA/IEE/SEIA/SIEE reports received at
the EIA unit.
• Responsibility
Director, Deputy Directors (DDs), Assistant Directors (ADs), Senior
Environmental Officers, (SEOs) Environmental Officers (EOs), nominated TEC
members, Management Assistants (MAs) and Office Assistants (OAs).
• Inputs: Draft EIA/IEE study reports
• Outputs: EIA, IEE approval/ rejection document
• Process
• KPIs: Minutes of TEC meetings, number of public comments and number of
approvals/rejections.
Process for Compliance Monitoring of approved projects

• Purpose
This process is to provide guidelines for compliance monitoring and to verify the
compliance with the Terms and Conditions of the EIA/IEE approval document issued
by the CEA and the Environmental Management Plan (EMP) document submitted
by the project proponent (PP) related to environmental management aspects.
• Scope
This process is applicable to the compliance monitoring related to EIA activity
carried out by the EIA.
• Responsibility
Director, Deputy Directors (DDs), Assistant Directors (ADs), Senior Environmental
Officers, (SEOs) Environmental Officers (EOs), nominated TEC members,
Management Assistants (MAs) and Office Assistants (OAs)
• Inputs: EMP report, monitoring reports, baseline data and receipt of monitoring
fee.
• Outputs: Letter of rectification, letter of notice and section 21 B Directive
• Process
• References
• KPIs: Number of compliance monitoring reports prepared by the EIA unit per
year
Document
Document No.:QM/DOC/13/A

Results of achieving quality objectives


Name of the Unit:
Sr. Objective Actions taken Level of achievement Responsibility Remarks
No.
           
 
           
 
           
 
           
 
           
 
           
 
           
 

           
 
           
 

Prepared by: Reviewed and Approved by


(Name, designation and signature) (Name, designation and signature)
:
Thank you