2. Walls of the vault before the Removal of cement plaster Walls after the removal
removal of cement plaster in process of plaster
UPPER 1. Flooring in the oval room Rafters supporting The Removal of wooden floor Wooden flooring removed for
GROUND before the removal of wooden wooden floor planks the structural consolidation
FLOOR
planks in process
planks
↑N
Restoration of Darbar Hall at University College for Women, Koti,
UPPER Corner balcony column in Providing support to Dismantling of buckled (out of After careful dismantling of
GROUND buckled circular plumb) circular column buckled (out of plumb) column
western
FLOOR
column supporting the madras terrace
below roof
the
later
added
toilet in
western
balcony
FIRST 1. Shoring of walls at first floor Careful dismantling of Removal of brick masonry View of the western
FLOOR removing the level before deteriorated deteriorated toilet wall balcony (from south) after the
jack arch roof added to the building block of toilet block removal of toilet block
2. Madras terrace roof below Brick by brick removal Careful removal of the Groves in the floor for
the toilet in western balcony, of madras terrace roof wooden rafters in the roof wooden members, exposed
before dismantling was carried out, to reduce after the complete dismantling
critical dead load from the of roof
building
↑N
↑N
TERRACE Wooden structural Careful removal of brick masonry The exposed wooden The wooden members have been
members of the madras for the restoration of deteriorated structural framework after removed carefully for restoration
terrace roof in oval room wooden structural members the removal of madras
before dismantle terrace roof
↑N
Terrace Floor
Plan
Restoration of Darbar Hall at University College for Women, Koti,
MATERIAL STORAGE AND PACKING
STAGE→ ORIGINAL LOCATION
1 2 3
LOWER Reusable wood, metal and Historic furniture has been
GROUND old furniture & artefacts have carefully stacked in a room
FLOOR been retrieved
↑N
UPPER
GROUND
FLOOR
↑N
↑N ROOM
OVER
CANTEE
N
FIRST FLOOR Careful packing of mirrors Wooden flooring has been covered
with a protective sheet
↑N
2. Brick and sand • Old damaged bricks removed from the building,
have been broken to smaller pieces and reused as
brick bats for waterproofing in the building
• The river sand has been brought to site from
Hyderabad. The sand was tested for its purity by
keeping some of the sand in a small tumbler filled
with water. According to the test, there was a
very little amount of impurities (mud, salt, etc.) in the
sand
UPPER Wooden false ceiling before Application of the first layer of anti- Application of the second layer Completion of sample on
GROUND treatment of I-sections corrosive paint on rafters of yellow anti-corrosive paint roof
FLOOR